Brooklyn · Block 2270 · Lot 12 · 11206

646 Broadway

8 floors · 14 apartments · 21,459 sq ft · built 2007 · class D1 · owner of record: M & G Housing Corp

24open violations
$6,250ECB/OATH penalties owed
3HPD class C (immediately hazardous)
70dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 70 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 70 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 86 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 314 days
Registered through 2027-09-01
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $223,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 487 days
No Cycle 10 report on record yet
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 801 days
Next cycle year 2028

Open violations

ECB / OATH (2) · $6,250 owed
IssuedViolationHearingBalance
Apr 11, 2024Local Law CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #914809. REMEDY: SUBMIT ACCEPTABLE REQU
#37028047M
Mar 10, 2025
DEFAULT
$6,250
Oct 15, 2018Local Law CLASS - 2
FAILURE TO SUBMIT A REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28.302.4 FOR CONTROL #814809. RMDY: SUBMIT REQUIRED TECHNICAL REPORT
#37013357X
May 13, 2019
IN VIOLATION
$0
DOB (3)
IssuedViolationStatus
Feb 22, 2023NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
#00974
DOB VIOLATION - ACTIVE
Feb 27, 2018CONSTRUCTION

#CN0102RA
DOB VIOLATION - ACTIVE
Aug 27, 2009UNSAFE BUILDINGS

#3083/09
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Feb 22, 2023Facades FISPNRF
CYCLE 9B NO REPORT FILED
Active
Jul 31, 2018Facades FISPNRF
FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
Active
HPD (16) · C 3 · B 2 · A 11
IssuedClassViolationCorrect by
Apr 7, 2025B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANEL AT BUILDING FRONT ENTRANCE DOOR , 1st STORY, SECTION AT EASTMay 12, 2025
Apr 7, 2025BApt 7L · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 7L, 7th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT EASTMay 12, 2025
Jul 24, 2023A§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT CEILING AT SOUTH PUBLIC HALL STAIRS AT SOUTH SECTION , 7th STORYOct 27, 2023
Jul 24, 2023A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT PUBLIC HALL STAIRS AT SOUTH SECTION , 7th STORYOct 27, 2023
Jul 24, 2023C§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF A TOTAL OF ONE PAINTED SPRINKLER HEAD AT PUBLIC HALL STAIRS, NORTH SECTION , 3rd STORYJul 30, 2023
Jul 24, 2023A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WEST WALL, PUBLIC HALL STAIRS AT SOUTH SECTION , 3rd STORYOct 27, 2023
Jul 24, 2023AApt 7L · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 7L UPPER LEVEL, 7th STORY, 1st APARTMENT FROM EAST AT SOUTHOct 27, 2023
Apr 29, 2022C§ 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE FIRE DOOR IN THE WEST FIRE STAIRS AT 1ST STORY , SECTION ''SOUTH''May 25, 2022
Apr 27, 2021C§ 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEMMay 3, 2021
Apr 27, 2021A§ 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOXJul 31, 2021
Apr 27, 2021A§ 27-2005 ADM CODE REFIT FIRE DOOR AT WEST PUBLIC STAIRS, 1ST STORY, BUILDING SEC: SOUTHJul 31, 2021
Apr 27, 2021A§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD.Jul 31, 2021
Apr 27, 2021A§ 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING.Jul 31, 2021
Apr 27, 2021A§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTEDJul 31, 2021
Apr 27, 2021A§ 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING.Jul 31, 2021
Apr 27, 2021A§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOORJul 31, 2021

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 22, 2026, 12:24 PM ET. BBL 3022700012.

Look up another building