Brooklyn · Block 914 · Lot 24 · 11232

646 39 Street

5 floors · 17,896 sq ft · built 2017 · class H3 · owner of record: C. H 39 Realty Llc

9open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
1164dto Gas piping inspection (2029 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 68 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1164 days
Next cycle year 2029

Open violations

ECB / OATH (0)

None open.

DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (9) · C 0 · B 3 · A 6
IssuedClassViolationCorrect by
May 11, 2026A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Aug 14, 2026
Aug 21, 2025A§ 27-2013 ADM CODE REMOVE THE DIRTY AND/OR LOOSE PAPER AND REPAPER OR PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, AT PUBLIC HALL, 2nd STORYNov 24, 2025
Aug 21, 2025BApt 113 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING, IN THE BATHROOM LOCATED AT B-ROOM 113, 2nd STORY, 1st B-ROOM FROM WEST AT NORTHSep 25, 2025
Aug 21, 2025AApt 113 · § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE VISIBLE MOLD AT GROUTS JOINTS OF THE CERAMIC TILES AT EAST, SOUTH AND WEST WALLS AROUND SHOWER STALL, IN THE BATHROOM LOCATED AT B-ROOM 113, 2nd STORY, 1st B-ROOM FROM WEST AT NORTHNov 24, 2025
Aug 21, 2025BApt 113 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR JAMBS OF THE WINDOW 1ST FROM WEST AT NORTH, IN THE BATHROOM LOCATED AT B-ROOM 113, 2nd STORY, 1st B-ROOM FROM WEST AT NORTHSep 25, 2025
Aug 21, 2025A§ 27-2013 ADM CODE REMOVE THE DIRTY AND/OR LOOSE PAPER AND REPAPER OR PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL, AT PUBLIC HALL, 2nd STORYNov 24, 2025
Aug 21, 2025A§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORYNov 24, 2025
Aug 21, 2025A§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTEDNov 24, 2025
Aug 21, 2025B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL SOUTH WALL, AT PUBLIC HALL, 2nd STORYSep 25, 2025

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 24, 2026, 5:29 AM ET. BBL 3009140024.

Look up another building