3 floors · 4 apartments · 3,300 sq ft · built 1931 · class S4 · owner of record: Swee Win Chow
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 66 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 82 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 310 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 431 days | Next cycle year 2027 |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Dec 16, 2008 | B | SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR AT PUBLIC HALL, 2nd STORY | Jan 20, 2009 |
| Dec 16, 2008 | B | Apt 2FL · SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE ENTIRE APARTMENT LOCATED AT APT 2FL, 2nd STORY | Jan 20, 2009 |
| Dec 16, 2008 | B | Apt 2FL · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 2FL, 2nd STORY | Jan 20, 2009 |
| Dec 16, 2008 | B | SECTION 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE AT ALL STY PUBLIC HALL | Jan 20, 2009 |
| Dec 15, 2008 | B | Apt 2FL · SECTION 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE GLASS AT TOP SASH NORTH WINDOW IN THE KITCHEN LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 19, 2009 |
| Dec 15, 2008 | B | Apt 2FL · SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CASING AT 6 WINDOW IN THE ENTIRE APARTMENT LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 19, 2009 |
| Aug 1, 2008 | C | SECTION 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATED LOCK INSTALLED AT ENTRANCE TO BUILDING DOOR | Aug 7, 2008 |
| Aug 1, 2008 | B | SECTION 65 M/D LAW PROVIDE UNDER COMPLETED PERMIT, A PROPER ENCLOSURE FOR THE CENTRAL HEATING PLANT, .. AT CELLAR | Sep 5, 2008 |
| Aug 1, 2008 | B | Apt 2FL · SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF WOOD PANELS INSTALLED AROUND GAS STOVE IN THE KITCHEN LOCATED AT APT 2FL, 2nd STORY | Sep 5, 2008 |
| Jul 3, 2008 | B | D26-19.07 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 50 WATTS REQUIRED NIGHT INSPECTION. | Aug 7, 2008 |
| May 22, 2006 | A | Apt 2FL · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING IN THE 1st PRIVATE HALLWAY FROM NORTH AT EAST LOCATED AT APT 2FL, 2nd STORY | Aug 30, 2006 |
| May 22, 2006 | A | Apt 2FL · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2FL, 2nd STORY | Aug 30, 2006 |
| May 22, 2006 | A | Apt 2FL · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING IN THE FOYER LOCATED AT APT 2FL, 2nd STORY | Aug 30, 2006 |
| Apr 27, 1999 | B | Apt 2FL · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND SOUTH WALL EAST FRONT ROOM 2NDSTY APT 2FL , SECTION '' '' | Jun 14, 1999 |
| Apr 6, 1999 | B | Apt 2 · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND SOUTH WALL IN SOUTH EAST ROOM 2ND STY APT 2 , SECTION '' '' | May 24, 1999 |
| Mar 18, 1997 | B | Apt 3 · SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL AND BUZZER SYSTEM FROM 1 STY PUBLIC HALL VESTIBULE TO 3 STY APT 3 LOCATED AT APT 3 | May 5, 1997 |
| Mar 18, 1997 | B | SECTION 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE MORTISE LOCK AND ASSEMBLY DOOR VESTIBULE 1 STY PUBLIC HALL | May 5, 1997 |
| May 14, 1996 | B | Apt 1 · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING PRIVATE HALL 2 STY APT 1. , SECTION '' '' | Jul 1, 1996 |
| Aug 22, 1995 | A | Apt 2 · SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED CEILING KITCHEN & BATHROOM 2 STY APT 2. , SECTION '' '' | Dec 8, 1995 |
| May 30, 1995 | A | Apt 1 · SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED CEILING KITCHEN & BATHROOM 1 STY APT 1. , SECTION '' '' | Sep 15, 1995 |
| May 30, 1995 | B | Apt 1 · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING THRU OUT 1 STY APT 1. , SECTION '' '' | Jul 17, 1995 |
| Jul 19, 1994 | A | Apt 1 · SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILINGS INSTALLED KITCHEN AND BATHROOM 2 STY APT 1 , SECTION '' '' | Nov 4, 1994 |
| Dec 7, 1993 | A | Apt 2 · SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILINGS INSTALLED KITCHEN & BATHROOM 2 STY APT 2 , SECTION '' '' | Mar 25, 1994 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 11:47 PM ET. BBL 3055480041.