5 floors · 11 apartments · 11,155 sq ft · built 1904 · class C1 · owner of record: Fulton Jefferson Housing Development Fun D Corp.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 778 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-13 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 17, 2024 | Unknown CLASS - 2 AT TIME OF MY INSPECTION I OBSERVED A SIDEWALK SHED AT A 6 STORY BUILDING. UPON REVIEWING DEPARTMENT OF BUILDING RECORDS I NOTICED THAT SIDEWALK SHED PERMIT EXPIRED SINCE 02/11/2024 PERMIT NUMBER: X00583095-I1 #39535210M | Feb 21, 2025 DEFAULT | $3,125 |
| Sep 2, 2021 | Construction CLASS - 3 DETERIORATED METAL CORNICE AT EXPOSURE#1 ROOF LEVEL: OBSERVED PILLING PAINT COATING, DISLODGE PARTS AND HOLES., REPAIR AND OR REPLACE #39046924R | Dec 3, 2021 IN VIOLATION | $0 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 7, 2024 | B | Apt 2B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 10SQ FT AT SINK BASE CABINET FLOOR IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Jul 11, 2024 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 8:37 PM ET. BBL 2029330063.