Brooklyn · Block 6562 · Lot 6 · 11204

6401 24 Avenue

4 floors · 42 apartments · 33,800 sq ft · built 1929 · class C1 · owner of record: Gmd Properties Inc

183open violations
$0ECB/OATH penalties owed
19HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2024-09-30
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 66 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 66 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2023-08-15 (Accepted). Agency page

Dec 31, 2026
in 66 days
1 of 1 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 82 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 33,800 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 187 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 187 days
Annual filing
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 431 days
Next cycle year 2027

Open violations

ECB / OATH (0)

None open.

DOB (6)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#13722
DOB VIOLATION - ACTIVE
Feb 2, 2020FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00793
DOB VIOLATION - ACTIVE
Nov 2, 2019FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#01010
DOB VIOLATION - ACTIVE
Aug 2, 2019FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#01493
DOB VIOLATION - ACTIVE
May 2, 2019FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#02721
DOB VIOLATION - ACTIVE
May 15, 2014LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
#15801
DOB VIOLATION - ACTIVE
DOB NOW Safety (7)
IssuedViolationStatus
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Feb 2, 2020Benchmarking - LL84 FTF-EN-BENCH
Active
Nov 2, 2019Benchmarking - LL84 FTF-EN-BENCH
Active
Aug 2, 2019Benchmarking - LL84 FTF-EN-BENCH
Active
May 2, 2019Benchmarking - LL84 FTF-EN-BENCH
Active
May 15, 2014Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
Active
HPD (170) · C 19 · B 118 · A 31
IssuedClassViolationCorrect by
Nov 25, 2024I§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R—
Nov 18, 2025I§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R—
May 1, 2026A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Aug 4, 2026
Jan 29, 2026BApt G5 · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES THAT IS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT G5, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WESTMar 5, 2026
Jan 29, 2026CApt G5 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT G5, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''Feb 12, 2026
Jan 29, 2026BApt G5 · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS THAT IS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT G5, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEMar 5, 2026
Jun 6, 2025A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Sep 9, 2025
Feb 10, 2025B§ 27-2005 ADM CODE PROPERLY SECURE THE LOOSE 3RD TREAD FROM BOTTOM AT PUBLIC HALL STAIRS, 1st STORY, SECTION ''WEST''Mar 17, 2025
Apr 3, 2024A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Jul 7, 2024
Mar 18, 2024BApt B5 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE BATHROOM LOCATED AT APT B5, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTHApr 22, 2024
Mar 18, 2024CApt B5 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 30 AT THE CEILING IN THE BATHROOM LOCATED AT APT B5, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTHApr 13, 2024
Mar 18, 2024BApt B5 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT B5, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTHApr 22, 2024
Mar 18, 2024BApt B5 · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT B5, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTHApr 22, 2024
Mar 18, 2024BApt B5 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE APPROX 4 SQFT LOOSE CERAMIC WALL TILES AT WEST WALL IN THE BATHROOM LOCATED AT APT B5, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTHApr 22, 2024
Mar 18, 2024CApt B5 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT B5, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTHApr 1, 2024
May 19, 2023BApt G6 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT G6, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTJun 23, 2023
May 19, 2023BApt A5 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A5, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHJun 23, 2023
May 19, 2023BApt E5 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E5, 1st STORY, 2nd APARTMENT FROM WEST AT NORTHJun 23, 2023
May 19, 2023BApt F6 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F6, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTJun 23, 2023
May 19, 2023BApt G3 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT G3, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJun 23, 2023
May 19, 2023BApt H3 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT H3, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''Jun 23, 2023
May 19, 2023BApt B5 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B5, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''Jun 23, 2023
May 4, 2023C§ 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.May 8, 2023
May 4, 2023C§ 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.May 8, 2023
Mar 20, 2023A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Jun 23, 2023
Feb 22, 2022A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.May 28, 2022
Feb 11, 2022B§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF AIR CONDITIONER UNIT AT PUBLIC HALL, 3rd STORYMar 18, 2022
Feb 11, 2022B§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING SLIDING BOLT WITH EYE INSTALLED AT DOOR THAT'S CAPABLE OF RECEIVING A PAD LOCK IN THE BULKHEAD NORTH WALL , SECTION ''NORTH''Mar 18, 2022
Feb 11, 2022B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT THE NORTH, SOUTH WALL AND CEILING IN THE BULKHEAD , SECTION ''NORTH''Mar 18, 2022
Feb 11, 2022A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH, SOUTH WALL AND CEILING IN THE BULKHEAD , SECTION ''NORTH''May 17, 2022
Feb 11, 2022B§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING SLIDING BOLT WITH EYE INSTALLED AT DOOR THAT'S CAPABLE OF RECEIVING A PAD LOCK IN THE BULKHEAD SOUTH WALL , SECTION ''SOUTH''Mar 18, 2022
Feb 8, 2022AApt H1 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 2nd WINDOW FRAME FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT H1, 4th STORY, 1st APARTMENT FROM NORTH AT EASTMay 14, 2022
Feb 8, 2022CApt H1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT H1, 4th STORY, 1st APARTMENT FROM NORTH AT EASTMar 6, 2022
Feb 8, 2022CApt H1 · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 0; WG TO REPLACE = 0; WG TO REPAIR = 2; IN THE ENTIRE APARTMENT LOCATED AT APT H1, 4th STORY, 1st APAMar 6, 2022
Feb 8, 2022CApt H1 · § 27-2005, 2007, 204.1 HMC CODE: REPLACE OR REPAIR THE SELF-CLOSING THE DOORS THAT IS MISSING OR DEFECTIVE ... IN THE ENTRANCE LOCATED AT APT H1, 4th STORY, 1st APARTMENT FROM NORTH AT EASTMar 6, 2022
Feb 8, 2022BApt F3 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F3, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTMar 15, 2022
Feb 8, 2022AApt H1 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY LOCATED AT APT H1, 4th STORY, 1st APARTMENT FROM NORTH AT EASTMay 14, 2022
Feb 8, 2022BApt B4 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B4, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHMar 15, 2022
Feb 8, 2022CApt H1 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT H1, 4th STORY, 1st APARTMEMar 4, 2022
Jan 18, 2022B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT CEILING AT PUBLIC HALL, 4th STORY, SECTION AT WESTFeb 22, 2022
Jan 18, 2022A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 4th STORY, SECTION AT WESTApr 23, 2022
Jan 18, 2022B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT ALL WALLS AND CEILNG, AT ALL STORIES AT PUBLIC HALL STAIRS, SECTION AT WESTFeb 22, 2022
Jan 18, 2022B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT ALL WALLS AND CEILING AT BULKHEAD , SECTION AT WESTFeb 22, 2022
Jan 18, 2022A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS AND CEILING AT ALL STORIES AT PUBLIC HALL STAIRS, SECTION AT WESTApr 23, 2022
Jan 18, 2022B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT ALL WALLS AND CEILING AT BULKHEAD , SECTION AT EASTFeb 22, 2022
Jan 18, 2022A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING AT BULKHEAD , SECTION AT EASTApr 23, 2022
Jan 18, 2022B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT ALL WALLS AND CEILING AT PUBLIC HALL STAIRS, 4th STORY, SECTION AT EASTFeb 22, 2022
Jan 18, 2022A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING AT PUBLIC HALL STAIRS, 4th STORY, SECTION AT EASTApr 23, 2022
Jan 18, 2022A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS AND CEILING AT BULKHEAD , SECTION AT WESTApr 23, 2022
Jan 18, 2022B§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE NEWEL POST CAPS. AT PUBLIC HALL STAIRS, 3rd STORY, SECTION AT WESTFeb 22, 2022
Jan 14, 2022BApt F2 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F2, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTHFeb 18, 2022
Jan 14, 2022BApt B3 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B3, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTFeb 18, 2022
Jan 14, 2022BApt A4 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A4, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 18, 2022
Jan 14, 2022BApt C2 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C2, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTHFeb 18, 2022
Jan 14, 2022BApt C3 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTFeb 18, 2022
Jan 14, 2022BApt C4 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C4, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 18, 2022
Jan 14, 2022BApt D4 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D4, 4th STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 18, 2022
Jan 14, 2022BApt E1 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 18, 2022
Jan 14, 2022BApt E4 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E4, 1st STORY, 1st APARTMENT FROM WEST AT NORTHFeb 18, 2022
Jan 14, 2022BApt F1 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 18, 2022

Showing 60 of 170. Full list on the agency site.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 26, 2026, 6:45 PM ET. BBL 3065620006.

Look up another building