5 floors · 31 apartments · 23,380 sq ft · built 1916 · class C1 · owner of record: 640 West 171 St Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 412 days | Next cycle year 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-16 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Dec 30, 2022 | A | Apt 1D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE FLOOR IN THE BATHROOM LOCATED AT APT 1D, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Apr 4, 2023 |
| Dec 30, 2022 | C | Apt 1D · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL, NORTH WALL, SOUTH WALL, EAST WALL, 1st WINDOW | Jan 23, 2023 |
| Dec 30, 2022 | A | Apt 1D · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 1D, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Apr 4, 2023 |
| Dec 30, 2022 | C | Apt 1D · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL, SOUTH WALL, EAST WALL, 1st WINDOW FRAME FROM E | Jan 23, 2023 |
| Dec 30, 2022 | C | Apt 1D · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) EAST WALL, WEST WALL IN THE FOYER LOCATED AT APT 1D, 1st STORY, 2nd APARTMENT FROM NOR | Jan 23, 2023 |
| Dec 30, 2022 | C | Apt 1D · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL, NORTH WALL, EAST WALL IN THE BATHROOM LOCATED | Jan 23, 2023 |
| Jun 21, 2022 | A | Apt 4C · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WITH SHEETROCK AND STUDS WITH DOOR ERECTED FROM FLOOR TO CEILING CREATING EXTRA ROOM IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 4C, | Sep 24, 2022 |
| Jun 21, 2022 | B | Apt 4C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''WEST'' | Jul 26, 2022 |
| Jun 21, 2022 | A | Apt 4C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''WEST'' | Sep 24, 2022 |
| Jun 21, 2022 | B | Apt 4C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE THE SLOPING WOOD FLOOR IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''WEST'' | Jul 26, 2022 |
| Dec 13, 2021 | B | Apt 4C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND SOUTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jan 17, 2022 |
| Dec 13, 2021 | B | Apt 4C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jan 17, 2022 |
| Dec 13, 2021 | B | Apt 4C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jan 17, 2022 |
| Dec 13, 2021 | B | Apt 4C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jan 17, 2022 |
| Mar 15, 2021 | B | Apt 4C · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 10 SQUARE FEET AT WEST WALL IN THE BATHROOM LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Apr 19, 2021 |
| Jul 23, 2018 | B | Apt 5B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS AND CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 27, 2018 |
| Jun 18, 2003 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RATED NORTH WALL BULKHEAD AT ROOF. | Jul 28, 2003 |
| Jun 18, 2003 | A | § 27-2005 ADM CODE REFIT FIRE DOOR EAST WEST 1 STY TO 4 STY PUBLIC HALL | Sep 26, 2003 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 3:14 PM ET. BBL 1021420034.