6 floors · 47 apartments · 39,960 sq ft · built 1926 · class D1 · owner of record: 5507-58 Linden Blvd Brooklyn Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 69 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 85 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 39,960 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 434 days | Next cycle year 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-02 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #37360 | DOB VIOLATION - ACTIVE |
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 29, 2025 | C | Apt 3B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) BAS | Nov 22, 2025 |
| Oct 29, 2025 | C | Apt 3B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1st | Nov 22, 2025 |
| Oct 10, 2025 | B | Apt 6B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BUZZER INTERCOM SYSTEM FROM EAST WALL AT VESTIBULE TO RETURN BUZZER AT EAST WALL IN THE FOYER LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 14, 2025 |
| Jun 16, 2025 | C | Apt 3C · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1st | Jul 10, 2025 |
| Jun 16, 2025 | C | Apt 3C · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Jul 10, 2025 |
| Jul 6, 2023 | B | Apt 5F · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK INSTALLED AT DOOR LEADING TO FIRE ESCAPE WINDOW IN THE 3rd ROOM FROM EAST LOCATED AT APT 5F, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Aug 10, 2023 |
| Oct 17, 2018 | B | Apt 6B · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH | Nov 21, 2018 |
| Oct 17, 2018 | B | Apt 6B · § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING KEY OPERATED LOCK INSTALLED ON DOOR TO ROOM WITH FIRE ESCAPE WINDOW IN THE 1st ROOM FROM EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH | Nov 21, 2018 |
| Oct 17, 2018 | B | Apt 6B · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH | Nov 21, 2018 |
| Oct 17, 2018 | A | Apt 6B · § 27-2005 ADM CODE REFIT THE DOOR IN THE ENTRANCE LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH | Jan 20, 2019 |
| Mar 8, 2018 | A | Apt 5F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 11, 2018 |
| Mar 2, 2018 | B | Apt 5F · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE KITCHEN LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 6, 2018 |
| Mar 2, 2018 | A | Apt 5F · § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTE LINE AT SINK. IN THE KITCHEN LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 5, 2018 |
| Mar 2, 2018 | A | Apt 5F · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOWER SASH WINDOW COUNTER BALANCE AT WEST WINDOW IN THE 3rd ROOM FROM EAST LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 5, 2018 |
| Mar 2, 2018 | B | Apt 5F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOORING, GAP OF 1 OR MORE INCHES BETWEEN WEST WALL BASEBOARD AND FLOORING. IN THE 1st ROOM FROM EAST LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Apr 6, 2018 |
| Mar 2, 2018 | A | Apt 5F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 5, 2018 |
| Oct 23, 2017 | B | Apt 1A · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 27, 2017 |
| Apr 1, 2013 | B | Apt 6A · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SLOPING WOOD FLOOR IN THE KITCHEN LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH | May 6, 2013 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 11:40 PM ET. BBL 3050860037.