Brooklyn · Block 2589 · Lot 5 · 11222

64 Calyer Street

1 floors · 17,550 sq ft · built 1931 · class E1 · owner of record: Greenpoint Village, Llc

4open violations
$1,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
798dto Gas piping inspection (2028 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 67 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 798 days
Next cycle year 2028

Open violations

ECB / OATH (1) · $1,250 owed
IssuedViolationHearingBalance
Oct 6, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. I OBSERVED CRACKED AND BULGING STUCCO, ALONG THE PARAPET WALL, APPROX 25-FEET OR MOREAT RISK OF COLLAPSE ONTO THE SIDEWALK, THE AREA IS BETWEEN THE SILVER
#35718730M
Dec 16, 2026
PENDING
$1,250
DOB (3)
IssuedViolationStatus
Apr 18, 2023CONSTRUCTION
STRUCTURE RENDERED NON-COMPLIANT,OWNER'S RESPONSIBLTY.OBSRVD@82CALYER, 4/18,CRACKS/CMU EST WALL,EXP#2,STEEL COLUMN CONCRETE,BRICK ENCASEMENTS @EXP#2,CONCRETE FL SLAB,LEANING BRICK PARAPET WALL@EXP#2 REMEDY:OWNER 2 HIRE LIC.P.E. 2 EVALUATE BLDG&PROVIDE STABILITY RPRT TO CEU BY MAY 12,2023 & FILE REPA
#CEU30101DA
DOB VIOLATION - ACTIVE
Dec 1, 2022CONSTRUCTION
AT TIME OF INSPECTION OBSERVED CRACKS ON THE CONCRETE FLOOR AT MULTIPLE LOCATIONS. CRACKS ON 2 COLUMNS.
#22-04303
DOB VIOLATION - ACTIVE
Jul 5, 2022CONSTRUCTION
AT TIME OF INSPECTION OBSERVED CRACK LINES ON CONCRETE FLOOR AND MASONRY CINDER BLOCK WALL ALONG EXPO # 02. A PERMITTED NB CONSTRUCTION SITE ( 82 CALYER STREET ) IN PROGRESS AT SAME EXPOSURE. UNABLE TO DETERMINE THE CAUSE OF CRACK AT TIME OF INSPECTION.
#22-02072
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 6, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. I OBSERVED CRACKED AND BULGING STUCCO, ALONG THE PARAPET WALL, APPROX 25-FEET OR MOREAT RISK OF COLLAPSE ONTO THE SIDEWALK, THE AREA IS BETWEEN THE SILVEROpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 25, 2026, 2:45 PM ET. BBL 3025890005.

Look up another building