6 floors · 151 apartments · 127,152 sq ft · built 1950 · class D1 · owner of record: State Preservation L.P.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 65 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 65 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-02-18 (Accepted). Agency page | Dec 31, 2026 in 65 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 81 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 127,152 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 186 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 186 days | Annual filing |
| Energy audit and retro-commissioning (2035) Likely applies Local Law 87 · Calendar year 2035 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3085). Agency page | Dec 31, 2035 in 3352 days | Next due 2035 |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 5, 2026 | B | Apt B23 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT B23, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST | Nov 9, 2026 |
| Oct 5, 2026 | B | Apt B23 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT B23, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST | Nov 9, 2026 |
| Oct 5, 2026 | B | Apt B23 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT B23, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST | Nov 9, 2026 |
| Oct 5, 2026 | B | Apt B23 · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE MARBLE SADDLE AT FLOOR IN THE BATHROOM LOCATED AT APT B23, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST | Nov 9, 2026 |
| Jul 22, 2026 | C | Apt B23 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT B23, 2nd STORY | Aug 17, 2026 |
| Jul 22, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT PUBLIC HALL, 1st STORY, SECTION AT WEST | Aug 26, 2026 |
| Jul 22, 2026 | B | Apt B23 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CIELING IN THE 2nd ROOM FROM EAST LOCATED AT APT B23, 2nd STORY | Aug 26, 2026 |
| Jul 22, 2026 | A | Apt B23 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT B23, 2nd STORY | Oct 25, 2026 |
| Jul 20, 2026 | B | Apt A9 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE TRIP LEAVER AT BATHTUB IN THE BATHROOM LOCATED AT APT A9, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 24, 2026 |
| Feb 5, 2026 | B | Apt G20 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCKING ASSEMBLY AT DOOR IN THE ENTRANCE LOCATED AT APT G20 LOWER LEVEL, 3rd APARTMENT FROM EAST AT SOUTH | Mar 12, 2026 |
| Dec 17, 2025 | A | Apt B23 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER PIPE IN THE BATHROOM LOCATED AT APT B23, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 22, 2026 |
| Dec 17, 2025 | A | Apt B23 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT B23, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 22, 2026 |
| Dec 17, 2025 | A | Apt B23 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT B23, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 22, 2026 |
| Dec 17, 2025 | A | Apt B23 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT B23, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 22, 2026 |
| Dec 15, 2025 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT PUBLIC HALL, 6th STORY, SECTION ''EAST'' | Jan 19, 2026 |
| Dec 15, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 6th STORY, SECTION ''EAST'' | Jan 19, 2026 |
| Nov 21, 2025 | C | Apt G20 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT CELLAR APT G20, 2nd CELLAR APT FROM SOUTH AT WEST , SECTION ''north'' | Dec 17, 2025 |
| Sep 15, 2025 | A | Apt G24 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT CELLAR APT G24, 1st CELLAR APT FROM WEST AT NORTH | Dec 19, 2025 |
| Aug 5, 2025 | C | Apt G24 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT G24, 1st APARTMENT FROM WEST AT NORTH | Aug 31, 2025 |
| Aug 5, 2025 | C | Apt B11 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT B11, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 31, 2025 |
| Jul 18, 2025 | B | Apt B5 · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT GAS STOVE IN THE KITCHEN LOCATED AT APT B5, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 22, 2025 |
| Jan 6, 2025 | C | Apt G24 · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Jan 30, 2025 |
| Jul 26, 2024 | C | Apt F19 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT F19, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST | Aug 21, 2024 |
| Mar 8, 2023 | C | Apt D10 · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE PRESUMED LEAD PAINT THAT IS XRF TESTED INCONCLUSIVE AT 0.5 MG/CM2 (28 RCNY §11-07(B)) FROM REQUIRED WINDOW AND/O | Apr 1, 2023 |
| Mar 7, 2023 | C | Apt D10 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1st | Mar 31, 2023 |
| Mar 7, 2023 | C | Apt D10 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1st | Mar 31, 2023 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 5, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT B23, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST | Open |
| Oct 5, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT B23, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST | Open |
| Oct 5, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT B23, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST | Open |
| Oct 5, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE MARBLE SADDLE AT FLOOR IN THE BATHROOM LOCATED AT APT B23, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST | Open |
| Jul 22, 2026 | HPD B | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT BATHTUB IN THE BATHROOM LOCATED AT APT B23, 2nd STORY | Closed |
| Jul 22, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT B23, 2nd STORY | Open |
| Jul 22, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT PUBLIC HALL, 1st STORY, SECTION AT WEST | Open |
| Jul 22, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CIELING IN THE 2nd ROOM FROM EAST LOCATED AT APT B23, 2nd STORY | Open |
| Jul 22, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT B23, 2nd STORY | Open |
| Jul 20, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE TRIP LEAVER AT BATHTUB IN THE BATHROOM LOCATED AT APT A9, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 9:25 AM ET. BBL 4030850008.