7 floors · 26 apartments · 19,892 sq ft · built 2024 · class D1 · owner of record: 6408 Wetherole Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 56 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 56 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 56 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 72 days | Annual |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page | Feb 21, 2027 in 108 days | No Cycle 10 report on record yet |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 300 days | Registered through 2027-09-01 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 6, 2026 | Construction CLASS - 1 WORK WITHOUT A PERMIT. NOTE: AT TIME OF INSPECTION, OBSERVED/NOTED - AT EXTERIOR FRONT_ROOF OF ADJ. 2-STORY(64-06 WETHEROLE ST.) - ALTERATION OF CHIMNEY/VENT STACK WITHOUT PERMIT(S)/FILED DOB JOB; (DRAWING SUBM #39176522J | Jan 8, 2027 PENDING | $2,500 |
| May 12, 2025 | Unknown CLASS - 2 AT TIME OF INSPECTION, UPON REVIEWING THE CONSTRUCTION SUPERINTENDENT DANIEL GRINSHTEYN #028883 DAILY ACTIVITIES LOG BOOK, I OBSERVED THE SUPERINTENDENT FAILED TO NOTE VIOLATING CONDITIONS SUCH AS; PIPE SCAFFO #39540144J | Mar 5, 2027 | $5,000 |
| Jan 10, 2025 | Construction CLASS - 1 28-110.2-OBSERVED A 7-STORY BUILDING 74 FEET 11 INCHES W/ ACTIVE CONSTRUCTION OPERATIONS. DURING INSPECTION, OBSERVED THAT HORIZONTAL NETS BC 3308.1.3 WERE NOT INSTALLED @ EXPOSURES 2 & 4, AND NO OTHER ALTERNAT #39535854H | Mar 30, 2027 | $2,500 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jul 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 30, 2026 | DOB Safety | AEUHAZ: | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 5, 2026, 4:22 AM ET. BBL 4030960074.