Queens · Block 1202 · Lot 9 · 11377

64-07 Broadway

2 floors · 1 apartments · 2,350 sq ft · built 1931 · class S1 · owner of record: 64-07 Broadway Realty Llc

11open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
70dto Annual boiler inspection (1 boiler)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 70 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-07-14 (Accepted). Agency page

Dec 31, 2026
in 70 days
1 of 1 without an accepted 2026 report yet
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 314 days
Required only if the owner doesn't live there
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1166 days
Next cycle year 2029

Open violations

ECB / OATH (3)
IssuedViolationHearingBalance
Aug 30, 2010Boilers CLASS - 2
254/16/36/48A/50A/50B/50C/50D/50E/50F/50G/50A-HARTFORD LOOP DEFECTIVEROTTED/50B-PIPE DOWN RELIEF VALVE TO BE 8" OFF FLR.50C-PIPE DOWN BACKFLOW PREVENTOR TO BE 8'OFF FLR/50D-PRESSURE GAUGE MUST BE ON FERRIS PIG
#32069484J
Apr 19, 2011
IN VIOLATION
$0
Aug 30, 2010Construction CLASS - 1
B101/51/WORK W/O A PERMIT.WEIL MCLAIN EG55,200,000 BTUS/DO NOT OPERATEBOILER UNTIL ALL HAZARDOUS CONDITIONS ARE IMMEDIATELY CORRECTED AND DOB IS NOTIFIED TO REINSPECT TO LIFT CEASE USE ORDER
#32069483H
Apr 19, 2011
IN VIOLATION
$0
Sep 28, 1989Public Assembly Non-Hazardous
EMERGENCY LIGHTING IS INOPERATIVE OR DEFECTIVE 3 FIXTURES VARIOUS LOCATION REMEDY REPAIR DEFECTIVE FIXTURES
#30016824P
Nov 14, 1989
WRITTEN OFF
$0
DOB (4)
IssuedViolationStatus
Mar 3, 2015LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
#15604
DOB VIOLATION - ACTIVE
Dec 13, 2011LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
#18232
DOB VIOLATION - ACTIVE
Dec 2, 2010FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#01746
DOB VIOLATION - ACTIVE
Jan 1, 2009LOCAL LAW 62/91 - BOILERS

#25568
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Mar 3, 2015Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
Active
Dec 13, 2011Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
Active
Dec 2, 2010AEUHAZ FTC-AEU-HAZ
Active
Jan 1, 2009Boiler LL6291
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 22, 2026, 6:49 AM ET. BBL 4012020009.

Look up another building