2 floors · 1 apartments · 2,350 sq ft · built 1931 · class S1 · owner of record: 64-07 Broadway Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-07-14 (Accepted). Agency page | Dec 31, 2026 in 70 days | 1 of 1 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 314 days | Required only if the owner doesn't live there |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1166 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 30, 2010 | Boilers CLASS - 2 254/16/36/48A/50A/50B/50C/50D/50E/50F/50G/50A-HARTFORD LOOP DEFECTIVEROTTED/50B-PIPE DOWN RELIEF VALVE TO BE 8" OFF FLR.50C-PIPE DOWN BACKFLOW PREVENTOR TO BE 8'OFF FLR/50D-PRESSURE GAUGE MUST BE ON FERRIS PIG #32069484J | Apr 19, 2011 IN VIOLATION | $0 |
| Aug 30, 2010 | Construction CLASS - 1 B101/51/WORK W/O A PERMIT.WEIL MCLAIN EG55,200,000 BTUS/DO NOT OPERATEBOILER UNTIL ALL HAZARDOUS CONDITIONS ARE IMMEDIATELY CORRECTED AND DOB IS NOTIFIED TO REINSPECT TO LIFT CEASE USE ORDER #32069483H | Apr 19, 2011 IN VIOLATION | $0 |
| Sep 28, 1989 | Public Assembly Non-Hazardous EMERGENCY LIGHTING IS INOPERATIVE OR DEFECTIVE 3 FIXTURES VARIOUS LOCATION REMEDY REPAIR DEFECTIVE FIXTURES #30016824P | Nov 14, 1989 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Mar 3, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT #15604 | DOB VIOLATION - ACTIVE |
| Dec 13, 2011 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT #18232 | DOB VIOLATION - ACTIVE |
| Dec 2, 2010 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #01746 | DOB VIOLATION - ACTIVE |
| Jan 1, 2009 | LOCAL LAW 62/91 - BOILERS #25568 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| Dec 13, 2011 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT | Active |
| Dec 2, 2010 | AEUHAZ FTC-AEU-HAZ | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 6:49 AM ET. BBL 4012020009.