Brooklyn · Block 2781 · Lot 36 · 11211

639 Grand Street

1 floors · 9,496 sq ft · built 1920 · class K1 · owner of record: 639 Grand Street Realty Llc

0open violations
$20,000ECB/OATH penalties owed
0HPD class C (immediately hazardous)
775dto Gas piping inspection (2028 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 775 days
Next cycle year 2028

Open violations

ECB / OATH (5) · $20,000 owed
IssuedViolationHearingBalance
Jul 28, 2026Unknown CLASS - 2
AT TIME OF INSPECTION, JERSEY BARRIERS PROTECTING THE WORK/STORAGE AREA WERE NOT MAINTAINED IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS, CONTRARY TO BC 3301.6.1. BARRIERS WERE NOT INTERCONNECTED AND CO
#39557199H
Dec 9, 2026
$2,500
Jul 8, 2026Unknown CLASS - 2
AT THE TIME OF MY INSPECTION I OBSERVED NEW BUIDING APPROX. 16 FEET HIGH (FORM WORK)-AND NO ADJ PROPERTY PROTECTION/CONTROL ACCESS ZONE/OVERHEAD PROTECTION PROVIDED FOR YARD/PROPERTY AT EXP#3 -STOP ALL WORK 20
#39556343Z
May 20, 2027
$5,000
Jul 8, 2026Construction CLASS - 2
AT THE TIME OF MY INSPECTION UPON CHECKING DOB RECORDS PAA WAS FILLED (B01248951-P1)-TO CHANGE FROM 6 STORY TO 11 STORY NEW BUILDING - NO APPROVED SITE SAFETY PLAN AVAILABLE ON SITE AS REQUIRED BY CODE-(SSP FOR
#39556341P
May 20, 2027
$1,250
Jul 8, 2026Construction CLASS - 1
AT THE TIME OF MY INSPECTION OF ACTIVE SITE -UPON REVIEW OF DOB RECORDS PAA WAS FILLED (B01248951-P1) TO CHANGE FROM 6 STORY TO 11 STORY BUILDING-AND NO SITE SAFETY COORDINATOR/SITE SAFETY MANAGER DESIGNATION W
#39556340N
May 20, 2027
$10,000
Jun 30, 2026Construction CLASS - 2
NO EN DRAWING APPROVED FROM DOB PROVIDED ON THE JOB SITE AT THE TIME OF INSPECTION., MAINTAIN/DISPLAY REQUIRED DOCUMENTS; CONTACT VIA EMAIL: ENERGYCODEINSPECTIONS@BUILDINGS.NYC.GOV
#39194241M
Jan 6, 2027
$1,250
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Aug 12, 2026DOB SafetyAEUHAZ: Closed
Jul 28, 2026ECBConstruction: AT TIME OF INSPECTION, ACTIVE CONSTRUCTION WORK WAS IN PROGRESS. NO OVERHEAD PROTECTION WAS PROVIDED AT THE CORNER OF EXPOSURES 2 AND 3, CONTRARY TO THE APPROVED SITE SAFETY PLAN. STOP ALL WORK WITHIN 20 FEETClosed
Jul 28, 2026ECBUnknown: AT TIME OF INSPECTION, JERSEY BARRIERS PROTECTING THE WORK/STORAGE AREA WERE NOT MAINTAINED IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS, CONTRARY TO BC 3301.6.1. BARRIERS WERE NOT INTERCONNECTED AND COClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 8:07 PM ET. BBL 3027810036.

Look up another building