3 floors · 2 apartments · 3,730 sq ft · built 1910 · class S2 · owner of record: 637 Bay Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-09-30 (Accepted). Agency page | Dec 31, 2026 in 44 days | 1 of 1 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 288 days | Required only if the owner doesn't live there |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 775 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Nov 14, 2016 | Unknown CLASS - 2 ELECTRICAL WORK W/O A PERMIT. OBSERVED AT 11:10AM NEW INSTALLATION OF NEW MAIN SERVICE IN THE MAIN HALLWAY OF THE BLDG/3 NEW METER BANKS, NEW DISCONNECT SWITCHES END LINE BOX AND PIPE AND WIRES.ALSO THE WORK #35201763R | Jan 4, 2017 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Mar 3, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.EXP1 WAS DEMOLISHED UNDER PREVIOUS EMERGENCY WORK ORDER.BLDG OPEN TO THE ELEMENTS & WILL BE TEMP WEATHERPROOFED UNDER EWO.OWNR TO RTAIN NYSPE TO FILE RPAIR DWGS W/DOB BLDG TO BE PERM REPAIRED UNDER PERMT STRTNG BY 3/30/26&CMPLTD/SGND OFF BY 4/30 #FEU50101PN | DOB VIOLATION - ACTIVE |
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 3:36 PM ET. BBL 5004940070.