2 floors · 15,605 sq ft · built 1950 · class W6 · owner of record: Wagner Lutheran Colle
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 775 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-25 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 5, 2022 | Construction CLASS - 2 AT THE TIME OF INSPECTION OF ACTIVE CONSTRUCTION SITE AT 2ND STORY FRAMING OBSERVED CHAINLINK CONSTRUCTION FENCE AROUND THE JOBSITE CONTRARY TO CODE REQUIREMENTS THAT SPECIFY CONSTRUCTION FENCES TO BE BUILT SOL #39509980J | Feb 15, 2023 IN VIOLATION | $0 |
| Dec 5, 2022 | Construction CLASS - 2 FAILURE TO MAINTAIN/DISPLAY ONSITE DOCUMENTS REQUIRED BY BC CHAPTER 33AT THE TIME OF INSPECTION AT ACTIVE JOBSITE OF 2ND STORY FRAMING,OBSERVED TEMPORARY WALL BRACING IN PLACE ALONG EXP1 AND 3 CONSISTING OF MAT #39510010R | Apr 5, 2023 DEFAULT | $3,125 |
| Dec 5, 2022 | Construction CLASS - 1 3301.13.5 AT THE TIME OF INSPECTION AT CONSTRUCTION SITE OF A 2ND STORY FRAMING,OBSERVED APPROX 10 WORKERS PERFORMING INTERIOR AND EXTERIOR WORK.UPON REVIEW OF PROVIDED DOCUMENTS WAS FOUND THAT THE DESIGNATED C #39510012K | Apr 5, 2023 DEFAULT | $6,250 |
| Dec 5, 2022 | Site Safety CLASS - 1 FAILURE TO DESIGNATE AND/OR HAVE A CONSTRUCTION SUPER PRESENT AT SITE AS REQUIRED.AT THE TIME OF INSPECTION AT AN ACTIVE CONSTRUCTION SITE OF A 2ND STORY FRAMING,OBSERVED APPROX 10 WORKERS PERFORMING INTERIOR A #39510011Z | Apr 5, 2023 DEFAULT | $12,500 |
| Dec 5, 2022 | Construction CLASS - 1 3301.13.1 AT THE TIME OF INSPECTION AT AN ACTIVE CONSTRUCTION SITE OF A 2 STORY FRAMING,OBSERVED APPROX 10 WORKERS PERFORMING INTERIOR AND EXTERIOR WORK.UPON REQUEST OF A REQUIRED SITE SAFETY PLAN FOR ABOVE JOB #39510009J | Apr 5, 2023 DEFAULT | $6,250 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Aug 29, 2025 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 10:25 PM ET. BBL 5005970065.