Manhattan · Block 1075 · Lot 1 · 10036

636 11 Avenue

11 floors · 530,130 sq ft · built 1917 · class O3 · owner of record: Plaza West Associates, Llc

8open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
61dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 61 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 61 days
Keep the report on file (not filed with DOB)
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $252,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2027
in 113 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 530,130 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 182 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 182 days
Annual filing
Energy audit and retro-commissioning (2035) Likely applies
Local Law 87 · Calendar year 2035
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1075). Agency page

Dec 31, 2035
in 3348 days
Next due 2035
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-16 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (7)
IssuedViolationStatus
Feb 3, 2026CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AS NOTED AT THE TIME OF INSPECTION,OBSERVED ON EXP1,2,&4,MISSING BRICKS AT MULTIPLE LO CATIONS.EXPOSURE 3 EAST ELEVATION,SPALLING & CRACK,STUCCO BRICKS AT SE VERAL LOCATIONS.ROOF:CRACKS & SPALLING MASONRY IN BULKHEAD BRICKWORK.R EMEDY:REPAIR AND/
#SR0401RF
DOB VIOLATION - ACTIVE
Sep 20, 2024CONSTRUCTION
FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER:EXP1 (WEST ELEV) WINDOW SILL BTWN 3 & 6FL & MULTIPLE CRACKS AT APPROXIMATELY BTWN 6FL & ROOF AROUND (WEST/SOUTH CORNER.) AT EXPOSURE 3 (EAST ELEV) SPALLING BRICKS & STUCCO AT MULTIPLE LOCATIONS WAS OBSERVED AS WELL AS CRACKED BRICK. REMEDY: REPAIR AN
#SR10401MA
DOB VIOLATION - ACTIVE
Mar 21, 2024CONSTRUCTION
FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT. ON EXP 1 (W ELEV) SPALLING BRICKS ON 11FL WINDOW EXPOSURE; DAMAGED SPALLING DECORATIVE STONES ON PARAPET. EXP2(N ELEV) DAMAGE SPALLING DECOR STONES ON PARAPET.EXP3(E ELE) SPALLING BRKS.EXP4(S ELE) & SEV LOC. EXP4(S ELE) SPALL STONES REMEDY:MAINTAIN BLDG IN
#SR0401RF
DOB VIOLATION - ACTIVE
Mar 20, 2024CONSTRUCTION
.FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.OBSRVED,ON EXPO #1 WEST ELEV.SPALLING BRICKS ON 11TH FLR WINDOW ENCLOSURE DAMAGE SPALLING DECORATIVE STONE EXPO#2 NORTH ELEV.DAMAGE DECORATIVE STONE EXPO#3 EAST ELEV.SPALLING BRICKS &STUCCO@SEVERAL LOCATION.EXPO#4SOUTH ELEV SPALLING STONES @PARA
#SR0401RF
DOB VIOLATION - ACTIVE
Aug 22, 2023CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER:OBSERVED CRACK WINDOWS SILL AT 3 FLOOR EXPOSURE#1 MULTIPLE OPEN STONE JOINTS AT 1ST FLOOR ALL EXPOSURE,WITH CRACKS AT EXPOSURE 4 AROUND DRIVE WAY AREA REMEDY:MAINTAIN BUILDING REPAIR AND OR REPLACE
#SR0402NS
DOB VIOLATION - ACTIVE
Jul 16, 2008ELEVATOR

#9011/269332
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#00900
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 4)
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 31, 2026, 12:27 AM ET. BBL 1010750001.

Look up another building