Brooklyn · Block 4080 · Lot 1 · 11207

635 Ashford Street

3 floors · 2 apartments · 3,743 sq ft · built 1930 · class S9 · owner of record: Frias Digna Ubiera

73open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
1156dto Gas piping inspection (2029 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 60 days
Keep the report on file (not filed with DOB)
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 304 days
Required only if the owner doesn't live there
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1156 days
Next cycle year 2029

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Dec 24, 2008Unknown CLASS - 3
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER: NOTED: CELLAR WOOD JOIST (5PCS IN THE (MISLE)AREA ARE ROTTEN AND SINKING (TEMPORARY SUPPORT WITH 4'X4' IS IN PLACE) REM: OBTAIN APPLICABLE PERMITS WITH D
#34739488J
Mar 2, 2009
IN VIOLATION
$0
Dec 24, 2008Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER: NO FIRE STOPPING PER BC712.3,27.345. NOTED: IN BOILER ROOM AND THROUGHOUT THE CELLAR THERE ARE HOLES AND EXPOSED WOOD JOIST ON CEILING AND WALLS. CELLAR S
#34739489L
Mar 2, 2009
IN VIOLATION
$0
DOB (16)
IssuedViolationStatus
Nov 14, 2025HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
#00416
DOB VIOLATION - ACTIVE
Nov 14, 2025HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
#01237
DOB VIOLATION - ACTIVE
Sep 23, 2024HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
#00437
DOB VIOLATION - ACTIVE
Sep 23, 2024HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
#01313
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
#00734
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
#01887
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
#03092
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
#04223
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
#04350
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
#00794
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
#02004
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
#03207
DOB VIOLATION - ACTIVE
Apr 25, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
#01823
DOB VIOLATION - ACTIVE
Apr 25, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
#00689
DOB VIOLATION - ACTIVE
Mar 16, 2020HIGH PRESSURE BOILER
VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
#00748
DOB VIOLATION - ACTIVE
Mar 16, 2020HIGH PRESSURE BOILER
VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
#00787
DOB VIOLATION - ACTIVE
DOB NOW Safety (20)
IssuedViolationStatus
Nov 14, 2025Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
Active
Nov 14, 2025Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
Active
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 5)
Active
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 5)
Active
Sep 23, 2024Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
Active
Sep 23, 2024Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
Active
Apr 25, 2023Boiler HBLVIO
VIOLATION ISSUED - FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE BOILER INSPECTION
Active
Apr 25, 2023Boiler HBLVIO
VIOLATION ISSUED - FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE BOILER INSPECTION
Active
Mar 16, 2020Boiler HBLVIO
VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
Active
Mar 16, 2020Boiler HBLVIO
VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
Active
Jun 22, 2018Boiler HBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION
Active
Dec 16, 2016Boiler HBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION
Active
HPD (35) · C 0 · B 28 · A 6
IssuedClassViolationCorrect by
Nov 2, 2016ISECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A V—
Jan 27, 2017BApt 2FL · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTMar 3, 2017
Jan 27, 2017BApt 2FL · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTMar 3, 2017
Jan 25, 2017BApt 2FL · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTMar 1, 2017
Jan 25, 2017B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PLASTER ALL WALLS AND CEILINGS PUBLIC HALL ALL STYSMar 1, 2017
Jan 25, 2017BApt 2FL · § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTMar 1, 2017
Jan 25, 2017BApt 2FL · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTMar 1, 2017
Jan 25, 2017A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS PUBLIC HALL ALL STYSApr 30, 2017
Dec 29, 2016BApt 2FL · § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTFeb 2, 2017
Nov 23, 2016ASECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AT PUBLIC HALL STAIRS, 2nd STORYFeb 26, 2017
Nov 2, 2016BApt 2FL · SECTION 27-2026 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE CONNECTION SHUT OFF VALVE AT RADIATOR IN THE 4th ROOM FROM EAST LOCATED AT APT 2FL, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTDec 7, 2016
Nov 2, 2016BApt 2FL · SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE AIR VALVE AT RADIATOR IN THE 5th ROOM FROM EAST LOCATED AT APT 2FL, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTDec 7, 2016
Nov 2, 2016BApt 2FL · SECTION 27-2026 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE CONNECTION SHUT OFF VALVE AT RADIATOR IN THE 5th ROOM FROM EAST LOCATED AT APT 2FL, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTDec 7, 2016
Nov 2, 2016BApt 2FL · SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE AIR VALVE AT RADIATOR IN THE 4th ROOM FROM EAST LOCATED AT APT 2FL, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTDec 7, 2016
Nov 2, 2016BApt 2FL · SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR AT RADIATOR IN THE 5th ROOM FROM EAST LOCATED AT APT 2FL, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTDec 7, 2016
Apr 13, 2016BApt 2 · SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING SADDLE AT ENTRANCE DOOR IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORYMay 18, 2016
Apr 13, 2016BApt 2 · SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING ELECTRICAL SWITCH COVER AT EAST WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORYMay 18, 2016
Feb 3, 2016BApt 2 · SECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, APARTMENT AT WESTMar 9, 2016
Mar 9, 2009BApt 2 · SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTApr 13, 2009
Mar 9, 2009BApt 2 · SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE SHOWER BODY DIVERTER AT BATH TUB IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTApr 13, 2009
Jun 11, 2008BSECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CELOTEX CEILING FRONT AND CENTER ROOMS AND PRIVATE HALLWAY, 2ND STORY APT.Jul 16, 2008
Jun 11, 2008BSECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING ELECTRICAL LIGHT SWITCH COVER SOUTH WEST ROOM 2ND STORY APT.Jul 16, 2008
Jun 11, 2008BSECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALLS THROUGHOUT 2ND STORY APT.Jul 16, 2008
Jun 11, 2008BSECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILINGS, KITCHEN, NORTH AND SOUTH WEST ROOMS AND PRIVATE HALLWAY , 2ND STORY APTJul 16, 2008
Jun 11, 2008BSECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE REFRIGERATOR GASKET 2ND STORY APTJul 16, 2008
Jun 11, 2008ASECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILES BATHROOM 2ND STORY APT.Sep 14, 2008
Jun 11, 2008ASECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS THROUGHOUT 2ND STORY APT.Sep 14, 2008
Jun 11, 2008ASECTION 27-2005 ADMIN. CODE: REFIT ENTRANCE DOOR NORTH WEST ROOM 2ND STORY APT.Sep 14, 2008
Jun 11, 2008ASECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALLS AND CEILINGS THROUGHOUT 2ND STORY APT # 2 WEST.Sep 14, 2008
Jun 11, 2008BSECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING WALL OUTLETS AND SWITCHES SOUTHWEST ROOM.Jul 16, 2008
Jun 11, 2008BSECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE NORTH WEST ROOM DOOR 2ND STORY APT. 2A.Jul 16, 2008
Jun 11, 2008BSECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF EXPOSED WIRES CEILING PRIVATE HALL 2ND STORY APT. 2A.Jul 16, 2008
Jun 11, 2008BSECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE WALL OUTLET NORTH WEST ROOM.Jul 16, 2008
Jun 11, 2008BSECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF EXPOSED ELECTRICAL WIRES 2ND STORY APT. THROUGHOUT.Jul 16, 2008
Jun 11, 2008BSECTION 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE CEILING LIGHT FRONT ROOM 2ND STORY APT.Jul 16, 2008

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 1, 2026, 5:58 PM ET. BBL 3040800001.

Look up another building