2 floors · 1 apartments · 1,822 sq ft · built 1899 · class S1 · owner of record: Mazzella Richard
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2018-10-10 (Accepted). Agency page | Dec 31, 2026 in 66 days | 1 of 1 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 310 days | Required only if the owner doesn't live there |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 797 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 16, 2024 | Boilers CLASS - 2 FAILURE TO FILE REQUIRED ANNUAL BOILER INSPECTION REPORTS FOR LOW-PRESSURE BOILER 20000058208Y0001 IN ACCORDANCE WITH THE RULES OF THE DEPARTMENT. 1RCNY 103-01(D)(1) REQUIRES THAT AN ANNUAL INSPECTION REPORT FO #37031816P | Mar 21, 2025 DEFAULT | $3,125 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #05675 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #05474 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #29973 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #09659 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #30371 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #08239 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #04228 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #05661 | DOB VIOLATION - ACTIVE |
| Oct 1, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT #03950 | DOB VIOLATION - ACTIVE |
| Mar 3, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT #05617 | DOB VIOLATION - ACTIVE |
| May 15, 2014 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT #07220 | DOB VIOLATION - ACTIVE |
| Mar 1, 2013 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT #03801 | DOB VIOLATION - ACTIVE |
| Feb 13, 2004 | LOCAL LAW 62/91 - BOILERS #08801 | DOB VIOLATION - ACTIVE |
| Mar 19, 2003 | LOCAL LAW 62/91 - BOILERS #08693 | DOB VIOLATION - ACTIVE |
| Feb 27, 2001 | LOCAL LAW 62/91 - BOILERS #09004 | DOB VIOLATION - ACTIVE |
| Sep 16, 1997 | LOCAL LAW 62/91 - BOILERS #197779 | DOB VIOLATION - ACTIVE |
| Jun 9, 1994 | LOCAL LAW 62/91 - BOILERS #01959 | DOB VIOLATION - ACTIVE |
| May 17, 1993 | LOCAL LAW 62/91 - BOILERS #02286 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Oct 1, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| May 15, 2014 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Active |
| Mar 1, 2013 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT | Active |
| Feb 13, 2004 | Boiler LL6291 | Active |
| Mar 19, 2003 | Boiler LL6291 | Active |
| Feb 27, 2001 | Boiler LL6291 | Active |
| Sep 16, 1997 | Boiler LL6291 | Active |
| Jun 9, 1994 | Boiler LL6291 | Active |
| May 17, 1993 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 26, 2024 | I | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R | — |
| Aug 26, 2024 | A | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. | Nov 29, 2024 |
| Aug 26, 2024 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED | Nov 29, 2024 |
| Aug 26, 2024 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. | Nov 29, 2024 |
| Aug 26, 2024 | B | Apt 2FLOOR · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER SASH WINDOW PANE AT WEST 1 WINDOW IN THE 3rd ROOM FROM EAST LOCATED AT APT 2FLOOR, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 30, 2024 |
| Aug 26, 2024 | C | Apt 2FLOOR · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CRACKED CERAMIC TILES AT FLOOR IN THE KITCHEN LOCATED AT APT 2FLOOR, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 1, 2024 |
| Aug 26, 2024 | B | Apt 2FLOOR · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ERODED WOOD SINK BASE CABINET IN THE KITCHEN LOCATED AT APT 2FLOOR, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 30, 2024 |
| Aug 26, 2024 | B | Apt 2FLOOR · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2FLOOR, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 30, 2024 |
| Aug 26, 2024 | B | Apt 2FLOOR · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT WEST WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 2FLOOR, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 30, 2024 |
| Aug 26, 2024 | B | Apt 2FLOOR · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 2FLOOR, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 30, 2024 |
| Aug 26, 2024 | B | Apt 2FLOOR · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SPLINTING WOOD STOOL AT EAST 1 WINDOW IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 2FLOOR, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 30, 2024 |
| Aug 26, 2024 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME READILY ACCESSIBLE FOR SIGNATURE, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR AT FRAME MISSING | Nov 29, 2024 |
| Aug 26, 2024 | B | Apt 2FLOOR · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 2FLOOR, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 30, 2024 |
| Aug 26, 2024 | B | Apt 2FLOOR · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER SASH WINDOW PANE AT EAST 1 WINDOW IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 2FLOOR, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 30, 2024 |
| Aug 26, 2024 | C | § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING KICKSTAND INSTALLED AT DOOR AT STREET LEADING PUBLIC HALL ,1ST STORY | Sep 9, 2024 |
| Aug 16, 2024 | A | Apt 2 · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 19, 2024 |
| Aug 16, 2024 | A | Apt 2 · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED CEILING IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 19, 2024 |
| Aug 15, 2024 | B | Apt 2ND · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH AT EAST WALL IN THE KITCHEN LOCATED AT APT 2ND, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 19, 2024 |
| Aug 15, 2024 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 19, 2024 |
| Aug 15, 2024 | B | Apt 2 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 19, 2024 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 4:34 AM ET. BBL 2024110009.