2 floors · 1 apartments · 4,300 sq ft · built 1930 · class G9 · owner of record: Three Two Bergen Stop Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 61 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 305 days | Required only if the owner doesn't live there |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-23 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Nov 12, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING & PARTS THEREOF IN A CODE-COMPLIANT MANNER. ATOI, OBSERVED SIDEWALK CURBCUT AT FRONT OF THE PROPERTY ILLEGALLY CUT & LOWERED ENABLING VEHICLE TO DRIVE UNTO THE LOT. CURBCUT APPROX. #39166773P | Dec 7, 2026 DEFAULT | $1,280 |
| Sep 30, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT 2ND FLOOR ERECTED PARTITION WALLS WITH COMBUSTIBLE MATERIAL,NOT FIRE RATED AS PLYWOOD AND STAIRS.REM:REPAIR AND/OR REPLACE. #35719319R | Dec 3, 2026 DEFAULT | $2,530 |
| Sep 30, 2025 | Construction CLASS - 2 WORK WITHOUT A PERMIT.WORK NOTED:AT THE 2ND FLOOR REAR ERECTED FULL HIGH PARTITION WALL FOR CREATING ROOMS/BEDROOMS.REM:OBTAIN PERMITS. #35719318P | Dec 3, 2026 DEFAULT | $1,280 |
| Issued | Violation | Status |
|---|---|---|
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #32224 | DOB VIOLATION - ACTIVE |
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 8:29 AM ET. BBL 3011370059.