6 floors · 10 apartments · 10,575 sq ft · built 2025 · class C1 · owner of record: Hlp Mazza 632 Metropolitan, L.P.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 56 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 56 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 72 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 787 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 14, 2026 | Unknown CLASS - 2 TEMP CONSTRUCTION EQUIPMENT INSTALLATION ONSITE EXPIRED PERMIT SHED-ASNOTED AT THE TIME OF INSPECTION OF AN ACTIVE SITE,6 STORY NEW BUILDINGI OBSERVED SIDEWALK SHED IN PLACE AT EXP#1,UPON REVIEW OF DEPARTMENT R #35729993H | Sep 17, 2026 DEFAULT | $1,280 |
| Jun 4, 2026 | Construction CLASS - 2 ATOI I OBSERVED SUPPORTED SCAFFOLD INSTALLED AT EXP#1 CONTRARY TO PLANS-2 OUTRIGGER PLATFORMS INSTALLED-SHALL BE 1 ,MISSING GUARDRAIL/END RAIL SYSTEM ON PLATFORMS,USING ALUMINIUM PLATFORM-PLANKS TO BE USED,6TH #39555065N | Aug 12, 2026 DEFAULT | $6,250 |
| Jun 4, 2026 | Construction CLASS - 1 ATOI - OBSERVED COLD FORM STEEL INSTALLED AT 6 FLOORS CONTRARY TO PLANS-MISSING STRAP ON TOP OF BLOCKING,BOTTOM STRAPS NOT UNDER BLOCKING APPROX. 2-4 INCHES AWAY FROM BLOCKING,MISSING BLOCKING IN MULTIPLE PLACE #39555064L | Aug 12, 2026 DEFAULT | $12,500 |
| Jun 4, 2026 | Construction CLASS - 2 //WORK CONTRARY TO SITE SAFETY PLAN-OBSERVED INADEQUATE ADJOINING PROPERTY PROTECTION AT EXP#2 (BC 3309.1)-MISSING PROTECTION OF SKYLIGHT,ACCESS HATCH,PARAPET WALL -AS PER SSP ADJ PROPERTY HAVE TO BE PROTECTED #39555066P | Aug 12, 2026 DEFAULT | $6,250 |
| Dec 1, 2025 | Construction CLASS - 2 OBSERVED C JOIST INSTALLED THROUGHOUT JOBSITE. UPON REQUEST FOR THE MANUFACTURE SPECIFICATIONS FROM ONSITE PERSONNEL, NONE WERE PROVIDED AT THE TIME OF INSPECTION. STOP ALL STRUCTURAL WORK ONSITE. PROVIDE/MAINT #39547496P | Feb 4, 2026 DEFAULT | $6,250 |
| Dec 1, 2025 | Construction CLASS - 2 OBSERVED C JOIST INSTALLED THROUGHOUT JOBSITE FROM CELLAR TO 6TH FLOOR. W/OUT STRAPS INSTALLED AS PER APPROVED PLANS. NEEDLE BEAMS INSTALLED EXPO 2 & 4 CONTRARY, INSTALLED ON 5TH FL PLANS STATES 4TH FL. PIPE SC #39547495N | Feb 4, 2026 DEFAULT | $3,125 |
| Dec 1, 2025 | Construction CLASS - 2 OBSERVED SIDEWALK SHED INSTALLED AT EXPO 1 OF JOBSITE WITH SUPPORTED SCAFFOLDING SEATED ON TOP AND SCAFFOLDING SEATED ON CANTILEVER PLATFORMS @ EXPO 2&4. UPON REQUEST FOR LOADS IMPOSED LETTER AND 6 MONTH INSPEC #39547523L | Feb 11, 2026 DEFAULT | $6,250 |
| Dec 1, 2025 | Unknown CLASS - 2 3307.6.4.2.2- OBSERVED SIDEWALK SHED INSTALLED @ EXPO 1 OF JOBSITE APPROXIMATELY 10 FT IN HEIGHT. THE SHED HAS LARGE AMOUNT OF CONSTRUCTION MATERIALS STORED ON TOP CONSISTING OF PIPE SCAFFOLDING MATERIALS. UPON #39547522J | Feb 11, 2026 DEFAULT | $10,000 |
| Nov 24, 2025 | Unknown CLASS - 2 OBSERVED AT EXPOSE 4 OF THE ADJOINING BUILD ROOF. MISSING AND INADEQUATE ROOF PROTECTION AS PER B.C 3309.10 THE REAR OF THE BUILDING MISSING THE PROTECTION COMPLETELY. THE FRONT OF THE BUILDING MISSING ALL THE #39547271Y | Jan 28, 2026 DEFAULT | $5,000 |
| Nov 24, 2025 | Unknown CLASS - 2 OBSERVED PIPE SCAFFOLDING INSTALLED WITH MISSING DEBRIS NETTING B.C 3314.8.2 AND SCAFFOLDING IS NOT INSTALLED PAST THE WORKING FLOOR AREA OF WORK. B.C 3308.6.1.4 CREATING UNSAFE CONDITIONS FOR ADJOINING BUILDIN #39547272X | Jan 28, 2026 DEFAULT | $5,000 |
| Nov 24, 2025 | Unknown CLASS - 2 OBSERVED ADJOINING BUILDING BALCONY AND NEIGHBOR PROPERTY NOT PROTECTED FROM CONSTRUCTION ACTIVITIES TAKING PLACE NEXT DOOR. NO OVER HEAD PROTECTION INSTALLED B.C 3309.13 OR CONTROL ACCESS ZONE INSTALLED TO PRE #39547273H | Jan 28, 2026 DEFAULT | $5,000 |
| Oct 9, 2025 | Unknown CLASS - 2 3301.2 AT THE TIME OF MY INSPECTION OF A PROPOSED SIX-STORY BUILDING AT THE 5FL-ROOF LEVEL, I OBSERVED OPEN EDGES WITHOUT AN ADEQUATE GUARDRAIL SYSTEM. WORKERS WERE OBSERVED ON THE 5 FL ROOF WITH NO GUARDRAIL P #39545781P | Mar 25, 2027 | $2,500 |
| Oct 9, 2025 | Unknown CLASS - 2 AT THE TIME OF MY INSPECTION OF A PROPOSED SIX-STORY BUILDING CURRENTLY AT THE 5TH-FLOOR LEVEL, I OBSERVED AT EXPOSURE #4, AT THE REAR ADJACENT PROPERTY, THAT THE SUNROOF AND AC UNIT WERE COVERED WITH CEMENT RE #39545782R | Mar 25, 2027 | $5,000 |
| Sep 19, 2025 | Construction CLASS - 2 SITE CURRENTLY UP TO THE 5TH FLOOR PERFORMING STRUCTURAL CMU WORK. UPON REQUEST FOR APPROVED STRUCTURAL DRAWINGS STAMPED WITH THE DOB SEAL. NONE WAS PROVIDED OR PRESENT ON SITE DURING INSPECTION. STOP ALL STRU #39545103X | Jan 28, 2027 DEFAULT | $3,125 |
| Issued | Violation | Status |
|---|---|---|
| Sep 3, 2026 | CONSTRUCTION BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDERPERMIT #B01256207-I1 ON 9/3/26. APPLICANT WITHDRAWAL #26-02156 | DOB VIOLATION - ACTIVE |
| Sep 3, 2026 | CONSTRUCTION BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDERPERMIT #B01280356-I1 ON 9/3/26. APPLICANT WITHDRAWAL #26-02155 | DOB VIOLATION - ACTIVE |
| Jul 12, 2023 | EMERGENCY FULLY DEMOLISH THE 632 METROPOLITAN BUILDING AND 1 STORY REAR SHED DEMOLISH BUILDING PER DEP CONTROLLED DEMOLITION. GRADE AND FENCE SITE #17732 | DOB VIOLATION - ACTIVE |
| Jul 5, 2023 | CONSTRUCTION REAR WALL HAS COLLAPSED. REAR ROOF HAS PARTIALLY COLLAPSED. ENTIRE LEFT WALL IS BULGING. BUILDING IS IN STATE OF COLLAPSE. #23-01990 | DOB VIOLATION - ACTIVE |
| Jul 5, 2023 | IMMEDIATE EMERGENCY ERECT APPROXIMATELY 25' OF CONSTRUCTION FENCE AT EXPOSURE#1 OF THE PROPERTY TO SAFEGUARD THE PUBLIC #17720 | DOB VIOLATION - ACTIVE |
| Jul 5, 2023 | CONSTRUCTION REAR WALL HAS COLLAPSED. REAR ROOF HAS PARTIALLY COLLAPSED. ENTIRE LEFT WALL IS BULGING. BUILDING IS IN STATE OF COLLAPSE. AT 632 METROPOLITAN AVE - REAR WALL HAS COLLAPSED. REAR ROOF HAS PARTIALLY COLLAPSED. ENTIRE LEFT WALL IS BULGING. BUILDING IS IN STATE OF COLLAPSE. #23-01991 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jul 8, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 3, 2026 | DOB | CONSTRUCTION: BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDERPERMIT #B01256207-I1 ON 9/3/26. APPLICANT WITHDRAWAL | Open |
| Sep 3, 2026 | DOB | CONSTRUCTION: BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDERPERMIT #B01280356-I1 ON 9/3/26. APPLICANT WITHDRAWAL | Open |
| Jul 14, 2026 | ECB | Unknown: TEMP CONSTRUCTION EQUIPMENT INSTALLATION ONSITE EXPIRED PERMIT SHED-ASNOTED AT THE TIME OF INSPECTION OF AN ACTIVE SITE,6 STORY NEW BUILDINGI OBSERVED SIDEWALK SHED IN PLACE AT EXP#1,UPON REVIEW OF DEPARTMENT R | Open |