Brooklyn · Block 5741 · Lot 5 · 11219

6315 14 Avenue

1 sq ft · class W1 · owner of record: Nyc School Construction Authority

2open violations
$7,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
429dto Gas piping inspection (2027 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 64 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 429 days
Next cycle year 2027

Open violations

ECB / OATH (2) · $7,500 owed
IssuedViolationHearingBalance
Jun 9, 2026Construction CLASS - 2
RESPONDING TO AN INCIDENT WHERE THE SHORING SYSTEM SUPPORTING A NEWLY POURED CONCRETE STAIR BETWEEN THE 2ND AND 3RD FLOORS FAILED AFTER CONCRETE PLACEMENT DUE TO INADEQUATE SUPPORT, CREATING A HAZARDOUS CONDITI
#39555284N
Nov 4, 2026
$5,000
Jun 9, 2026Construction CLASS - 1
FAILURE TO PROVIDE SITE-SPECIFIC FORMWORK DESIGN DRAWINGS. AS NOTED: AT TIME OF INSPECTION, WHILE RESPONDING TO A FORM FAILURE INCIDENT OBSERVED AT THE NORTHWEST CORNER, STAIRCASE "C" FORMWORK HAD COLLAPSED BET
#35729981K
Nov 4, 2026
$2,500
DOB (0)

None open.

DOB NOW Safety (2)
IssuedViolationStatus
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 11)
Active
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 11)
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 28, 2026, 4:36 PM ET. BBL 3057410005.

Look up another building