5 floors · 64 apartments · 52,921 sq ft · built 1924 · class D7 · owner of record: Royal Charter Properties, Inc.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 46 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 62 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 52,921 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 167 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 167 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 290 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 411 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2028) Likely applies Local Law 87 · Calendar year 2028 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2138). Agency page | Dec 31, 2028 in 777 days | Next due 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-14 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 30, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT VESTIBULE DOOR , 1st STORY, SECTION ''EAST'' | Nov 13, 2026 |
| May 19, 2025 | B | Apt 3L · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING ENTRANCE TO INTERCOM PANEL AT EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west'' | Jun 23, 2025 |
| May 19, 2025 | B | Apt 3L · § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION THE WASTELINE AT WASHBASIN IN THE BATHROOM LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west'' | Jun 23, 2025 |
| May 19, 2025 | B | Apt 3L · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west'' | Jun 23, 2025 |
| May 19, 2025 | B | Apt 3L · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE DEFECTIVE, LOWER SASH AT 1ST WINDOW FROM NORTH AT EAST IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west'' | Jun 23, 2025 |
| Feb 18, 2025 | C | Apt 3L · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE PRESUMED LEAD PAINT THAT IS XRF TESTED INCONCLUSIVE AT 0.5 MG/CM2 (28 RCNY §11-07(B)) FROM REQUIRED WINDOW AND/O | Mar 14, 2025 |
| Feb 14, 2025 | C | Apt 3L · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) BAS | Mar 10, 2025 |
| Feb 14, 2025 | C | Apt 3L · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL, EAST WALL, 2nd WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM E | Mar 10, 2025 |
| Feb 14, 2025 | A | Apt 3L · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST | May 20, 2025 |
| Feb 14, 2025 | B | Apt 3L · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST | Mar 21, 2025 |
| Feb 14, 2025 | B | Apt 3L · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOOD BASE CABINET UNDER THE SINK IN THE KITCHEN LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST | Mar 21, 2025 |
| Feb 14, 2025 | C | Apt 3L · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL, SOUTH WALL IN THE FOYER LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM E | Mar 10, 2025 |
| Feb 14, 2025 | C | Apt 3L · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1st | Mar 10, 2025 |
| Feb 14, 2025 | C | Apt 3L · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL, EAST WALL, WEST WALL IN THE KITCHEN LOCATED AT APT 3L, 3rd STORY, 1st APAR | Mar 10, 2025 |
| Feb 14, 2025 | A | Apt 3L · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, SOUTH WALL, WEST WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST | May 20, 2025 |
| Feb 14, 2025 | A | Apt 3L · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM SOUTH AT WEST WALL DOOR FRAME, 1st CLOSET FROM SOUTH AT WEST WALL DOOR, 1st CLOSET FROM NORTH AT EAST WALL DOOR, 1st CLOSET FROM SOUTH AT WEST WALL WALL, 1st CLOSET FROM NORTH AT EAST WALL DO | May 20, 2025 |
| Feb 14, 2025 | A | Apt 3L · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE KITCHEN LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST | May 20, 2025 |
| Feb 14, 2025 | A | Apt 3L · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM WEST AT NORTH WALL IN THE KITCHEN LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST | May 20, 2025 |
| Feb 14, 2025 | C | Apt 3L · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) NOR | Mar 10, 2025 |
| Feb 14, 2025 | C | Apt 3L · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) EAS | Mar 10, 2025 |
| Feb 14, 2025 | C | Apt 3L · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT A | Mar 10, 2025 |
| Feb 14, 2025 | A | Apt 3L · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST | May 20, 2025 |
| Feb 14, 2025 | A | Apt 3L · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST | May 20, 2025 |
| Feb 14, 2025 | A | Apt 3L · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST | May 20, 2025 |
| Feb 14, 2025 | A | Apt 3L · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM NORTH AT EAST WALL DOOR, 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME, WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST | May 20, 2025 |
| Feb 10, 2025 | B | Apt 1F · § 27-2005 HMC: REFIT WINDOW AT FIRE ESCAPE IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 1F, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTH | Mar 17, 2025 |
| Jan 24, 2025 | B | Apt 1F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL UNDER BASE CABINET IN THE KITCHEN LOCATED AT APT 1F, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Feb 28, 2025 |
| Aug 13, 2024 | B | Apt 1F · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 4 SQ.FT AT CEILING IN THE BATHROOM LOCATED AT APT 1F, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 16853438 ISSUED 13-APR-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2 | Sep 17, 2024 |
| Jul 5, 2024 | B | Apt 1F · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 2SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 1F, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 16720096 ISSUED 05-MAR-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-20 | Aug 9, 2024 |
| May 7, 2024 | B | Apt 3L · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN GLAZE AT BATH TUB IN THE BATHROOM LOCATED AT APT 3L, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 11, 2024 |
| May 7, 2024 | C | Apt 3L · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1st | May 31, 2024 |
| May 7, 2024 | A | Apt 3L · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM EAST AT SOUTH, THE 1st ROOM FROM EAST AT SOUTH, THE FOYER , THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3L, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 10, 2024 |
| May 7, 2024 | A | Apt 3L · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE FOYER LOCATED AT APT 3L, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 10, 2024 |
| May 7, 2024 | A | Apt 3L · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM NORTH AT EAST WALL DOOR IN THE PRIVATE HALLWAY LOCATED AT APT 3L, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 10, 2024 |
| May 7, 2024 | B | Apt 3L · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 3L, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 11, 2024 |
| May 7, 2024 | A | Apt 3L · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3L, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 10, 2024 |
| Apr 29, 2024 | A | Apt 1F · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT SWITCH AT SOUTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1F, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Aug 2, 2024 |
| Apr 29, 2024 | C | Apt 1F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1F, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST | May 25, 2024 |
| Apr 15, 2024 | B | Apt 1F · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RUBBER GASKET AT LOWER REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 1F, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH | May 20, 2024 |
| Apr 15, 2024 | B | Apt 1F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, WEST AND EAST WALLS IN THE BATHROOM LOCATED AT APT 1F, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH | May 20, 2024 |
| Mar 21, 2024 | B | Apt 3L · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE REGLAZED BATHTUB SURFACE IN THE BATHROOM LOCATED AT APT 3L, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Apr 25, 2024 |
| Mar 21, 2024 | B | Apt 3L · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR KNOB IN THE BATHROOM LOCATED AT APT 3L, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Apr 25, 2024 |
| Mar 20, 2024 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND WEST WALL AT PUBLIC HALL, 4th STORY | Apr 24, 2024 |
| Mar 6, 2024 | B | Apt 1F · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1F, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTH | Apr 10, 2024 |
| Mar 6, 2024 | B | Apt 1F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, SOUTH AND EAST WALL IN THE BATHROOM LOCATED AT APT 1F, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTH | Apr 10, 2024 |
| Feb 15, 2024 | C | Apt 3L · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1st | Mar 10, 2024 |
| Feb 15, 2024 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT INTERMIDATE LANDING AT WEST WALL. AT PUBLIC HALL, 5th STORY | Mar 21, 2024 |
| Feb 15, 2024 | A | Apt 3L · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 3L, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | May 20, 2024 |
| Feb 15, 2024 | C | Apt 3L · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME IN THE PRIVATE HALLWAY LOCATED AT APT 3L | Mar 10, 2024 |
| Feb 15, 2024 | C | Apt 3L · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 3L, 5th STORY, 1 | Mar 10, 2024 |
| Jun 1, 2023 | C | Apt 3L · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1st | Jun 25, 2023 |
| Jun 1, 2023 | C | Apt 3L · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1st | Jun 25, 2023 |
| Jun 1, 2023 | A | Apt 3L · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE KITCHEN , THE FOYER LOCATED AT APT 3L, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 4, 2023 |
| Jun 1, 2023 | C | Apt 3L · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT A | Jun 25, 2023 |
| Jun 1, 2023 | A | Apt 3L · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st DOOR FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 3L, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 4, 2023 |
| Jun 1, 2023 | B | Apt 3L · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK INSTALLED AT ROOM DOOR LEADING TO FIRE ESCAPE WINDOW. IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3L, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 6, 2023 |
| Mar 29, 2023 | B | Apt 1F · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 5 SQ. FT. AT AT NORTH WINDOW STOOL IN THE BATHROOM LOCATED AT APT 1F, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 15581172 ISSUED 28-NOV-22 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE | May 3, 2023 |
| Mar 7, 2023 | B | Apt 1F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN FLOOR IN THE KITCHEN LOCATED AT APT 1F, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTH | Apr 11, 2023 |
| Mar 7, 2023 | B | Apt 1F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN FLOOR IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 1F, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTH | Apr 11, 2023 |
| Mar 7, 2023 | B | Apt 1F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN FLOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 1F, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTH | Apr 11, 2023 |
Showing 60 of 68. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 30, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT VESTIBULE DOOR , 1st STORY, SECTION ''EAST'' | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 8:47 PM ET. BBL 1021380147.