Queens · Block 6507 · Lot 1 · 11367

63-25 Main Street

2 floors · 521,944 sq ft · built 1952 · class W1 · owner of record: Nyc Department Of Education

45open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
67dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 67 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 67 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (9 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-19 (Accepted). Agency page

Dec 31, 2026
in 67 days
7 of 9 without an accepted 2026 report yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 521,944 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 188 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 188 days
Annual filing
Energy audit and retro-commissioning (2027) Likely applies
Local Law 87 · Calendar year 2027
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 6507). Agency page

Dec 31, 2027
in 432 days
Next due 2027

Open violations

ECB / OATH (16)
IssuedViolationHearingBalance
Sep 17, 2026Construction CLASS - 1
GUARDRAIL SYSTEM AND VERTICAL NETTING CONTRARY TO CODE MISSING NETTING AND TOE BOARDS AT MULTIPLE LOCATIONS. COMPLY WITH CODE BC 3301.2 & 27-1009(A). MAINTAIN GUARDRAIL SYSTEM AS REQUIRED AND PROTECT THE PUBLIC
#39559312J
Dec 1, 2026
ADMIT/IN-VIO
$0
May 18, 2026Construction CLASS - 2
REISSUED ECB #35719634R. FAILURE TOM MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED EMERGENCY LIGHTS NOT WORKING AT: CAFETE
#35732873K
Jun 18, 2026
POP/IN-VIO
$0
May 18, 2026Construction CLASS - 2
REISSUED ECB #35719635Z. REISSUED ECB #35719635Z. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED BROKEN GLASS DOOR PANELS AT: 2ND FLOOR BY STAIR B, D; 1ST FLOOR BY EXIT #4. REMEDY: REPAIR AND/OR R
#35732872Z
Jun 18, 2026
POP/IN-VIO
$0
May 18, 2026Construction CLASS - 2
REISSUED ECB #35719633P. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED EXIT DOORS NOT SELF-CLOSING AT: EXIT #3, #4, #5-6, #12, #15. REMEDY: REPAIR/REPLACE DOOR.
#35732874M
Jun 18, 2026
POP/IN-VIO
$0
May 18, 2026Construction CLASS - 2
28-301.1. UNLAWFUL PLACEMENT OF FURNISHINGS, DECORATIONS OR OTHER OBJECTS AT EXITS, THAT OBSTRUCT ACCESS TO EGRESS FROM OR VISIBILITY THEREOF PER FDNY 2008 CODE; FC 1027.4. NOTED PARTIALLY BLOCKED EGRESS AT EXI
#35731900M
Jun 18, 2026
POP/IN-VIO
$0
Apr 30, 2026Construction CLASS - 2
REISSUE #35719632N. DATE OF ISSUE: 05/01/25. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT CELLAR LEVEL GAS METER RM AND ELECTRICAL ROOM EXCESSIVE STORAG
#35722168X
Jun 5, 2026
POP/IN-VIO
$0
Apr 30, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT 3RD FL. STAIRWAY "F" ONE EXIT DOOR, 3RD FL. STAIRWAY "D" ONE EXIT DOOR, 2ND FL. STAIRWAY "F" ONE EXIT DOOR
#35722169H
Jun 5, 2026
POP/IN-VIO
$0
Jun 4, 2025Construction CLASS - 2
NOTED (3) HOLES IN PERMANENT FENCE OF JOHN BOWNE HS/CEDAR GROVE PLAYGROUND, ONE LARGE ENOUGH FOR THE PUBLIC TO GAIN ACCESS, ADJACENT TO WALKWAY, EXP 1 (FRONT RIGHT SIDE)CAUSING A SAFETY CONCERN FOR CHILDREN PLA
#39149957P
Jun 30, 2025
POP/IN-VIO
$0
May 5, 2025Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED AT 1 FLOOR STAIR C, BY 197 AND AUDITORIUM 6 LIGHTS, EMERGENCY LIG
#35719634R
May 29, 2025
POP/IN-VIO
$0
May 5, 2025Construction CLASS - 2
REISSUE #35682650K. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT EXIT 18 DOORS IS RUBBING NOT CLOSING PROPERLY. ALSO ABOVE DOOR EXIT 18 BROKEN GLASS PANEL. REMEDY: REPAIR AND/OR REPLACE.
#35719633P
May 29, 2025
POP/IN-VIO
$0
May 5, 2025Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT STAIR B BULHEAD BROKEN WINDOW, 2FL STAIR A GLASS PANEL AT DOOR, 1 FL EXIT 4 GLASS PANEL ON DOOR BROKEN GLASS. REMEDY: REPAIR AND/OR REPLACE GLASS.
#35719635Z
May 29, 2025
POP/IN-VIO
$0
May 1, 2025Construction CLASS - 2
REISSUE #35682620J. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT CELLAR ROOMS GAS, ELECTRICAL, AND SPRINKLER EXCESSIVE STORAGE INCLUDING ITEMS SUCH AS DESKS, CHAIRS, CABINETS AND CARDBOARD BO
#35719632N
May 29, 2025
POP/IN-VIO
$0
May 14, 2024Construction CLASS - 2
EXIT DOOR NOT SELF-CLOSING.NOTED EXTERIOR EXIT DOORS AT EXIT#18 & 20 NOT OPENING OR CLOSING PROPERLY MENTIONED DOORS HAVE CORRODED FRAME RUBBING OR SADDLE OR CONCRETE.REM:REPAIR/REPLACE DOOR.
#35682650K
Jul 30, 2024
POP/IN-VIO
$0
May 10, 2024Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT CELLAR LEVEL ELECTRICAL,GAS METER & SPRINKLER CONTROL VALVE ROOMS,LARGE AMOUNTS OF STORAGE INCLUDING ITEM SUCH AS DESKS,CHAIRS,CABINETS,CARDBOARD B
#35682620J
Jul 16, 2024
POP/IN-VIO
$0
Jul 29, 2019Boilers CLASS - 2
FEDERAL BOILER MDL# FMA2125. MISSING GLASS IN REAR OBSERVATION PORT. PUMP LEAKING ON CONDENSATE TANK. PUMP LEAKING ON VACUUM TANK. MISSING LADDER AND PLATFORM. CORRECT VIOLATING CONDITIONS AND SUBMIT A CERTIFIC
#39006578R
Aug 12, 2019
POP/IN-VIO
$0
Jul 29, 2019Boilers CLASS - 2
FEDERAL BOILER MDL# FMA2125. MISSING GLASS IN REAR OBSERVATION PORT. PUMP LEAKING ON CONDENSATE TANK. PUMP LEAKING ON VACUUM TANK. MISSING LADDER AND PLATFORM. CORRECT VIOLATING CONDITIONS AND SUBMIT A CERTIFIC
#39006577P
Aug 12, 2019
POP/IN-VIO
$0
DOB (5)
IssuedViolationStatus
Jun 15, 2021ELEVATOR

#9027/702829
DOB VIOLATION - ACTIVE
May 7, 2020ELEVATOR

#9027/679091
DOB VIOLATION - ACTIVE
Jun 1, 2016NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST
FAILURE TO PERFORM CATEGORY 5 INSPECTION
#03333
DOB VIOLATION - ACTIVE
Jun 1, 2016RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST
FAILURE TO PERFORM CATEGORY 5 INSPECTION
#00416
DOB VIOLATION - ACTIVE
Oct 8, 2010ELEVATOR ANNUAL INSPECTION / TEST

#05391
DOB VIOLATION - ACTIVE
DOB NOW Safety (24)
IssuedViolationStatus
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 17, 2026ECBConstruction: GUARDRAIL SYSTEM AND VERTICAL NETTING CONTRARY TO CODE MISSING NETTING AND TOE BOARDS AT MULTIPLE LOCATIONS. COMPLY WITH CODE BC 3301.2 & 27-1009(A). MAINTAIN GUARDRAIL SYSTEM AS REQUIRED AND PROTECT THE PUBLICOpen
Jul 15, 2026ECBConstruction: OBSERVED:FENCE ERECTED ON EXP 1 NOT FULLY PAINTED HUNTER GREEN AS PER CODE REQUIRED /MAINTAIN FENCE /PAINT IT COMPLITELLYClosed
Jul 15, 2026ECBConstruction: OBSERVED: EXCAVATION DONE MORE THEN 6 FEET DEEP AT EXP 1 PARALEL TO REEVES AVE NO 45 DEGREE NO PROTECTION ON EDGE OF EXCAVATION ,NO GUARD RAILS CONTRARY TO BUILDING CODE PROVIDE GUARD RAILS ON EDGE OF EXCAVATIClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 25, 2026, 5:07 PM ET. BBL 4065070001.

Look up another building