6 floors · 31 apartments · 29,860 sq ft · built 1926 · class D1 · owner of record: 630 W 135 St. Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 44 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 44 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 60 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 29,860 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 165 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 165 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 288 days | Registered through 2027-09-01 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-04 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 27, 2006 | Elevators Non-Hazardous 83X10: 83- RETURN TO SERVICE #38162205M | May 2, 2013 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2016 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST #04742 | DOB VIOLATION - ACTIVE |
| May 15, 2014 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT #05622 | DOB VIOLATION - ACTIVE |
| Dec 13, 2011 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT #03683 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #04330 | DOB VIOLATION - ACTIVE |
| Jan 1, 2009 | LOCAL LAW 62/91 - BOILERS #06460 | DOB VIOLATION - ACTIVE |
| Jan 3, 2008 | LOCAL LAW 62/91 - BOILERS #06309 | DOB VIOLATION - ACTIVE |
| Jan 19, 2007 | LOCAL LAW 62/91 - BOILERS #06645 | DOB VIOLATION - ACTIVE |
| Jan 19, 2007 | LOCAL LAW 62/91 - BOILERS #00518 | DOB VIOLATION - ACTIVE |
| Jan 6, 2006 | LOCAL LAW 62/91 - BOILERS #06284 | DOB VIOLATION - ACTIVE |
| Feb 13, 2004 | LOCAL LAW 62/91 - BOILERS #07299 | DOB VIOLATION - ACTIVE |
| Mar 19, 2003 | LOCAL LAW 62/91 - BOILERS #07071 | DOB VIOLATION - ACTIVE |
| Mar 26, 2002 | LOCAL LAW 62/91 - BOILERS #07610 | DOB VIOLATION - ACTIVE |
| Feb 19, 2002 | LOCAL LAW 10/81 - ELEVATOR #01649 | DOB VIOLATION - ACTIVE |
| Mar 12, 1991 | ELEVATOR DEVICE #1P948 #1300C03 | VIOLATION UNSERVED ECB-ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 9) | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| May 15, 2014 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Active |
| Dec 13, 2011 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
| Jan 3, 2008 | Boiler LL6291 | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
| Jan 6, 2006 | Boiler LL6291 | Active |
| Feb 13, 2004 | Boiler LL6291 | Active |
| Mar 19, 2003 | Boiler LL6291 | Active |
| Mar 26, 2002 | Boiler LL6291 | Active |
| Feb 19, 2002 | Elevators LL1081 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 28, 2026 | B | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES HOUSEHOLD STORAGE AT 6TH STORY BALCONY 2ND STACK FROM EAST AT BUILDING FRONT AT FIRE ESCAPE | Dec 2, 2026 |
| Dec 31, 2025 | A | Apt BASEME · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF DRY WALL PARTITION ERECTED FROM FLOOR TO CEILING AND HENCE CREATING ADDITIONAL ROOM AND REDUCING NATURAL LIGHT AND VENTILATIO | Apr 5, 2026 |
| May 24, 2024 | C | Apt 34 · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Jun 17, 2024 |
| May 23, 2024 | A | Apt 34 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WAINSCOTTING AT SOUTH WALL, SOUTH WALL, WEST WALL, 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 34, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 26, 2024 |
| May 23, 2024 | A | Apt 34 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM WEST AT NORTH WALL IN THE KITCHEN LOCATED AT APT 34, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 26, 2024 |
| May 23, 2024 | A | Apt 34 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, NORTH WALL, SOUTH WALL IN THE 5th ROOM FROM NORTH LOCATED AT APT 34, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 26, 2024 |
| May 23, 2024 | A | Apt 34 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM SOUTH AT WEST WALL IN THE 6th ROOM FROM NORTH LOCATED AT APT 34, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 26, 2024 |
| May 23, 2024 | A | Apt 34 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 2nd CLOSET FROM NORTH AT EAST WALL DOOR IN THE 6th ROOM FROM NORTH LOCATED AT APT 34, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 26, 2024 |
| May 23, 2024 | B | Apt 34 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK AT DOOR IN THE ENTRANCE LOCATED AT APT 34, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 27, 2024 |
| May 23, 2024 | A | Apt 34 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 34, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 26, 2024 |
| May 23, 2024 | C | Apt 34 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM NORTH AT EAST WALL DOOR, 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME | Jun 16, 2024 |
| May 23, 2024 | C | Apt 34 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) WAI | Jun 16, 2024 |
| May 23, 2024 | A | Apt 34 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM WEST AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 34, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 26, 2024 |
| May 23, 2024 | A | Apt 34 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL, NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 34, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 26, 2024 |
| May 23, 2024 | C | Apt 34 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) WAINSCOTTING AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 34, 3rd STORY, 1st | Jun 16, 2024 |
| May 23, 2024 | C | Apt 34 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE KITCHEN LOCATED AT APT 34, 3rd STORY, | Jun 16, 2024 |
| May 23, 2024 | C | Apt 34 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 34, 3rd STORY, 1st APARTM | Jun 16, 2024 |
| May 23, 2024 | C | Apt 34 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM NORTH AT EAST WALL DOOR, 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME | Jun 16, 2024 |
| Jan 25, 2024 | C | Apt 34 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 34, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 20, 2024 |
| Aug 30, 2023 | C | Apt 2 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 25, 2023 |
| Apr 17, 2023 | C | Apt 34 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 34, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | May 13, 2023 |
| Apr 17, 2023 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LEADING TO NORTH COURT AT PUBLIC HALL, 1st STORY | May 1, 2023 |
| Apr 17, 2023 | B | § 27-2005 HMC: REFIT DOOR LEADING TO NORTH YARD AT PUBLIC HALL, 1st STORY | May 22, 2023 |
| Mar 27, 2023 | C | Apt 2 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Apr 22, 2023 |
| Feb 21, 2023 | C | Apt 34 · § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 34, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 7, 2023 |
| Feb 21, 2023 | C | Apt 34 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 34, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 19, 2023 |
| Jan 13, 2023 | B | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 15 SQ FEET AT CEILING AT PUBLIC HALL, 1st STORY ORIGINAL VIOLATION 15366260 ISSUED 14-SEP-22 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b). | Feb 17, 2023 |
| Sep 15, 2022 | B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL, 1st STORY | Oct 20, 2022 |
| Sep 15, 2022 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 1st STORY | Oct 20, 2022 |
| Sep 15, 2022 | B | Apt 1 · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING DOORS TO CABINETS AT NORTH WALL IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 20, 2022 |
| Jul 9, 2020 | B | Apt 54 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR at ceiling and west wall IN THE FOYER LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 13, 2020 |
| Jul 9, 2020 | B | Apt 54 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR at ceiling and north wall IN THE BATHROOM LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 13, 2020 |
| Jul 9, 2020 | B | Apt 54 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR at ceiling and east wall IN THE 1st ROOM FROM EAST LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 13, 2020 |
| Jul 9, 2020 | A | Apt 54 · § 27-2005 ADM CODE REFIT apartment entrance door IN THE ENTRANCE LOCATED AT APT 54, 5th STORY | Oct 12, 2020 |
| Jul 9, 2020 | B | Apt 54 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR north wall IN THE 5th ROOM FROM NORTH AT WEST LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 13, 2020 |
| Jul 9, 2020 | B | Apt 54 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE wood floor north corner IN THE 5th ROOM FROM NORTH AT WEST LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 13, 2020 |
| Jul 9, 2020 | A | Apt 54 · § 27-2005 ADM CODE REFIT upper and lower window sash IN THE 5th ROOM FROM EAST LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 12, 2020 |
| Jul 9, 2020 | B | Apt 54 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR west wall IN THE 5th ROOM FROM EAST LOCATED AT APT 54, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 13, 2020 |
| Sep 13, 2018 | B | Apt 1 · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE COUNTERTOP IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 18, 2018 |
| Sep 13, 2018 | B | Apt 1 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 18, 2018 |
| Sep 13, 2018 | B | Apt 1 · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE BASE CABINET IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 18, 2018 |
| Sep 13, 2018 | B | Apt 1 · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE WALL CABINETS AT EAST WALL IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 18, 2018 |
| Sep 13, 2018 | B | Apt 1 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE UPPER SASH WINDOW IN THE 3rd ROOM FROM EAST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 18, 2018 |
| Sep 13, 2018 | B | Apt 1 · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT EAST WALL APPROX 10 SQUARE FEET IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 18, 2018 |
| Sep 12, 2018 | B | Apt 1 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK A WATER LEAK AT THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 17, 2018 |
| Sep 11, 2018 | B | Apt 1 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL WALLS IN THE 2nd ROOM FROM EAST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 16, 2018 |
| May 29, 2018 | B | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF WOOD PANEL AT EAST WALL AT PUBLIC HALL, 1st STORY | Jul 3, 2018 |
| May 29, 2018 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF SHEET ROCK STACKED UNDER PUBLIC HALL STAIRS AT PUBLIC HALL, 1st STORY | Jul 3, 2018 |
| Apr 12, 2018 | B | Apt 43 · § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE WASH BASIN IN THE BATHROOM LOCATED AT APT 43, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | May 17, 2018 |
| Apr 12, 2018 | B | Apt 43 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE PORCELINE ENAMEL GLAZE AT BATHTUB IN THE BATHROOM LOCATED AT APT 43, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | May 17, 2018 |
| Apr 12, 2018 | B | Apt 43 · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE MARBLE SADDLE IN THE BATHROOM LOCATED AT APT 43, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | May 17, 2018 |
| Apr 12, 2018 | B | Apt 43 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR OUT OF PLUMB IN THE 2nd ROOM FROM EAST LOCATED AT APT 43, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | May 17, 2018 |
| Apr 12, 2018 | A | Apt 43 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AT RISER IN THE BATHROOM LOCATED AT APT 43, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 16, 2018 |
| Apr 12, 2018 | A | Apt 43 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AT RISER IN THE KITCHEN LOCATED AT APT 43, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 16, 2018 |
| Apr 10, 2018 | B | Apt 43 · § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS .. IN THE ENTRANCE LOCATED AT APT 43, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | May 15, 2018 |
| Apr 10, 2018 | B | Apt 43 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE FLOORING IN THE BATHROOM LOCATED AT APT 43, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | May 15, 2018 |
| Apr 10, 2018 | B | Apt 43 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOORING IN THE ENTIRE APARTMENT LOCATED AT APT 43, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | May 15, 2018 |
| Feb 12, 2018 | A | Apt 43 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 43, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH | May 18, 2018 |
| Feb 12, 2018 | A | Apt 43 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FOOR TILES IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 43, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH | May 18, 2018 |
| Feb 12, 2018 | A | Apt 43 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 2nd ROOM FROM NORTH LOCATED AT APT 43, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH | May 18, 2018 |
Showing 60 of 73. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
| Oct 28, 2026 | HPD B | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES HOUSEHOLD STORAGE AT 6TH STORY BALCONY 2ND STACK FROM EAST AT BUILDING FRONT AT FIRE ESCAPE | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 2:33 PM ET. BBL 1020010055.