| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 66 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 39,780 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 187 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 187 days | Annual filing |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $180,000 in late-filing or failure-to-file penalties. Agency page | On file | Cycle 10 filing on record: SAFE (2026-07-16) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 11, 2026 | Construction CLASS - 1 ATOI OBSERVED A WATER HEATER INSTALLED WITHOUT ANY PERMITS FILE ON BIS OR DOBNOW CONTRARY TO PC 106.1 PLUMBING WORK INCLUDING WATER HEATER INSTALLATIONS AND PLUMBING SYSTEM ALTERATIONS, REQUIRES PERMITS., OBTAI #39203871Z | Nov 25, 2026 PENDING | $2,500 |
| Sep 11, 2026 | Construction CLASS - 1 ATOI OBSERVED GAS METER BEING HOUSED IN THE FIRE PUMP ROOM WHICH IS CONTRARY TO BC 913.2.1 GAS PIPING, GAS CONSUMPTION DEVICES, GAS METERS OR ANY OTHER GAS EQUIPMENT AND FUEL STORAGE OR FUEL CONSUMING APPLIANCE #39203872K | Nov 25, 2026 PENDING | $2,500 |
| Sep 16, 2025 | Construction CLASS - 2 OBSERVED ON 9TH FLOOR STANDPIPE VALVE USING A PLASTIC CAP, SPRINKLER HEAD PAINTED, AND THROUGHOUT THE BUILDING SPRINKLER HEAD CAPS PAINTED TO CEILING. ON 5TH FLOOR RAN OUT MULTIPLE HOSES FOR WASHING MACHINE AND #39160576Z | Nov 26, 2025 DEFAULT | $0 |
| Sep 16, 2025 | Construction CLASS - 2 OBSERVED IN THE BASEMENT EJECTOR PUMP IMPROPERLY INSTALLED USING FERNCO COUPLING AND NO COVER PLATE. ALSO FIRE PUMP IS IN THE SAME ROOM AS THE GAS LINE WHICH IS CONTRARY TO CODE SECTIONS PC 605.9 AND FGC 404.3 #39160577K | Nov 26, 2025 DEFAULT | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 14, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 14, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 6) | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 14, 2026 | DOB Safety | AEUHAZ: | Open |
| Oct 14, 2026 | DOB Safety | AEUHAZ: | Open |
| Sep 11, 2026 | ECB | Construction: ATOI OBSERVED A WATER HEATER INSTALLED WITHOUT ANY PERMITS FILE ON BIS OR DOBNOW CONTRARY TO PC 106.1 PLUMBING WORK INCLUDING WATER HEATER INSTALLATIONS AND PLUMBING SYSTEM ALTERATIONS, REQUIRES PERMITS., OBTAI | Open |
| Sep 11, 2026 | ECB | Construction: ATOI OBSERVED GAS METER BEING HOUSED IN THE FIRE PUMP ROOM WHICH IS CONTRARY TO BC 913.2.1 GAS PIPING, GAS CONSUMPTION DEVICES, GAS METERS OR ANY OTHER GAS EQUIPMENT AND FUEL STORAGE OR FUEL CONSUMING APPLIANCE | Open |