6 floors · 48 apartments · 41,963 sq ft · built 1932 · class D1 · owner of record: R.M.R. Realty
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-15 (Accepted). Agency page | Dec 31, 2026 in 47 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 41,963 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 412 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 25, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39149834P. AS OF 9/25/2026., FILE A CERTIFICATE #39205592P | Dec 2, 2026 PENDING | $1,250 |
| Jul 24, 2026 | Elevators CLASS - 1 CEASE USE ITEM: MISSING SELECTOR TAPE SWITCH (APPENDIX K3). CLASS 2 ITEMS: ADJUST FLOOR STOPS. INOPERATIVE CAB LIGHT. PHONE DIALS PREVIOUS CONTRACTOR(2.27.1.1.3.). BRAKE PADS RUBBING (2.24.8.). UNREADABLE MAIN #39197562R | Oct 7, 2026 IN VIOLATION | $1,250 |
| Jul 22, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSION ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDING FOR NOTICE OF VIOLATION # 39149834P ISSUED ON 06/03/2025 PURSUANT TO 28-204.4, FILE A CERTIFICATE #39197159R | Oct 7, 2026 IN VIOLATION | $1,250 |
| May 26, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT EXPOSURE 3(BACK) AT 3RD FLOOR FIRE ESCAPE STEPS, 1 STAIR IS MISSING, AT EXPO 1(FRONT) 1ST FLOOR, LEFT & RIGHT SIDES FIRE #39189842L | Mar 5, 2027 PENDING | $12,500 |
| Jun 23, 2025 | Boilers CLASS - 3 FAILURE TO MAINTAIN THIS BUILDINGS WATER SYSTEM AT THE TIME OF INSPECTION IN APT F7 RUNNING THE COLD WATER IN THE BATHROOM TUBE I OBSERVED BROWN DISCOLORED WATER, MAINTAIN BOILER; CORRECT VIOLATION AND SUBMIT C #39151647M | Aug 27, 2025 IN VIOLATION | $500 |
| Jun 3, 2025 | Construction CLASS - 1 OBSERVE EXIT PATHWAY TO STREET FROM REAR FIRE ESCAPE IS OBSTRUCTED BY WRONG HARDWARE ON EXIT DOOR. DOOR IS NOT OPENING., REPAIR AND/REPLACE; REPLACE DOOR HARDWARE. #39149834P | Sep 22, 2025 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 31, 2018 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 #00647 | DOB VIOLATION - ACTIVE |
| Jan 31, 2013 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012 #01321 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| May 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Active |
| Jan 31, 2013 | Facades FISPNRF FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 12, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT BULKHEAD DOOR , 6th STORY | Nov 26, 2026 |
| Sep 10, 2026 | C | Apt F7 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 6, 2026 |
| Aug 14, 2026 | C | Apt A1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT A1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 9, 2026 |
| Jun 12, 2026 | C | Apt F7 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 8, 2026 |
| Apr 30, 2026 | C | § 27-2005 ADM CODE FIRE ESCAPE DEFECTIVE. PROPERLY SECURE 3RD TREAD FROM BOTTOM AT 2ND STORY BALCONY AT 1ST FIRE ESCAPE FROM NORTH AT EAST AT BUILDING FRONT AT FIRE ESCAPE | May 6, 2026 |
| Mar 30, 2026 | C | Apt A3 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT A3, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 25, 2026 |
| Mar 30, 2026 | C | Apt A3 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT DOOR IN THE ENTRANCE LOCATED AT APT A3, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 13, 2026 |
| Mar 3, 2026 | B | Apt A1 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT SOUTH AND WEST WALLS AND CEILING IN THE BATHROOM LOCATED AT APT A1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 18336837 ISSUED 31-OCT-25 HAS BEEN UPGRADED TO CLASS B PER ADM | Apr 7, 2026 |
| Jan 8, 2026 | B | Apt F7 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH AT SOUTH WALL IN THE KITCHEN LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 12, 2026 |
| Nov 18, 2025 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED | Feb 21, 2026 |
| Nov 13, 2025 | B | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES FLOWER POTS AT 2ND STACK FROM NORTH AT WEST AT FIRE ESCAPE, 6th STORY | Dec 18, 2025 |
| Nov 5, 2025 | C | Apt 2B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 1, 2025 |
| Nov 3, 2025 | B | Apt A1 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE OF LOWER SASH OF WINDOW AT WEST WALL IN THE KITCHEN LOCATED AT APT A1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 8, 2025 |
| Nov 3, 2025 | C | Apt A1 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL, 2nd WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 3rd ROOM FROM EAST AT NORT | Nov 27, 2025 |
| Nov 3, 2025 | B | Apt A1 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE OF LOWER SASH OF 1ST WINDOW FROM SOUTH AT WEST IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT A1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 8, 2025 |
| Nov 3, 2025 | A | Apt A1 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 3rd ROOM FROM EAST AT SOUTH, THE KITCHEN LOCATED AT APT A1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 6, 2026 |
| Nov 3, 2025 | A | Apt A1 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT A1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 6, 2026 |
| Nov 3, 2025 | A | Apt A1 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT A1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 6, 2026 |
| Nov 3, 2025 | A | Apt A1 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT A1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 6, 2026 |
| Nov 3, 2025 | A | Apt A1 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL, SOUTH WALL IN THE BATHROOM LOCATED AT APT A1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 6, 2026 |
| Nov 3, 2025 | C | Apt A1 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT A1, 1st STORY, 1 | Nov 27, 2025 |
| Nov 3, 2025 | B | Apt A1 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE OF LOWER SASH OF WINDOW AT SOUTH WALL IN THE BATHROOM LOCATED AT APT A1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 8, 2025 |
| Oct 29, 2025 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT COMPACTOR CLOSET DOOR AT PUBLIC HALL, 6th STORY | Dec 3, 2025 |
| Oct 29, 2025 | B | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PLEXIGLASS AT THE BUILDING ENTRANCE DOORS | Dec 3, 2025 |
| Oct 29, 2025 | B | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PLEXIGLASS INSTALLED AT THE VESTIBULE DOORS AT PUBLIC HALL, 1st STORY | Dec 3, 2025 |
| Oct 29, 2025 | C | Apt 8F · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCES AT LOWER WINDOW SASH. 1ST WINDOW FROM EAST AT SOUTH IN THE 4th ROOM FROM NORTH LOCATED AT APT 8F, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Nov 4, 2025 |
| Oct 29, 2025 | C | Apt 8F · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 8F, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Nov 12, 2025 |
| Oct 8, 2025 | B | Apt F7 · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 12, 2025 |
| Oct 8, 2025 | B | Apt F7 · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 12, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2005 HMC: REFIT UPPER AND LOWER SASHS WINDOWS 1ST FROM SOUTH AT WEST IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 14, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER SASH WINDOW 1ST FROM SOUTH AT WEST, IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 14, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2005 HMC: REFIT UPPER AND LOWER SASHS WINDOWS 1ST FROM SOUTH AT WEST, IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 14, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2005 HMC: REFIT UPPER SASH WINDOW 1ST FROM EAST AT SOUTH IN THE KITCHEN LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 14, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2005 HMC: REFIT CAULKING MATERIALS BETWERN FROM WALLS,FLOOR TO ALL EDGES OF THE WOOD BASEBOARD MOLDING 1ST FROM EAST AT SOUTH, IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 14, 2025 |
| Sep 9, 2025 | C | Apt F7 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 5, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE GROUTS JOINTS OF THE CERAMIC FLOOR TILES, IN THE KITCHEN LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 14, 2025 |
| Sep 9, 2025 | A | Apt F7 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE RADIATOR 1ST FROM EAST AT SOUTH, IN THE KITCHEN LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 13, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL, IN THE KITCHEN LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 14, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES, IN THE BATHROOM LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 14, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2005 HMC: REFIT UPPER AND LOWER SASHS WINDOWS 2ND FROM SOUTH AT WEST, IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 14, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING MATERIALS BETWERN FROM WALLS TO ALL EDGES OF THE WOOD WINDOW CASING, JAMBS, APORON 1ST FROM SOUTH AT WEST, IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 14, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING MATERIALS BETWERN FROM WALLS,FLOOR TO ALL EDGES OF THE WOOD BASEBOARD MOLDING 1ST FROM SUOTH AT WEST, IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 14, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING MATERIALS BETWERN FROM WALL TO TOP EDGES OF THE PICTURE MOLDING AT NORTH, EAST, SOUTH AND WEST WALLS, IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 14, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER SASH WINDOW 2ND FROM SOUTH AT WEST. IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 14, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SREWS SEALED UPPER SASH WINDOW 2ND FROM SOUTH AT WEST, IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 14, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL, IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 14, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FILLER AND WOOD FLOOR TILES, IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 14, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE SINK WITH CABINET , COLD AND HOT WATER FIXTURES AT SOUTH WALL, IN THE KITCHEN LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 14, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE AND MISSING BASE CABINETS 1ST FROM WEST AT NORTH, IN THE KITCHEN LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 14, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING MATERIALS BETWERN FROM WALL SURFACE TO ALL EDGES OF THE INTERIOR AND EXTERIOR SIDE DOOR FRAMES ,IN THE CLOSET 1ST FROM NORTH AT EAST, IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT F7, 6th STORY, 1st APARTME | Oct 14, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOIR TILES ,IN THE CLOSET 1ST FROM NORTH AT EAST, IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 14, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD HEADER FAME AT INTERIOR SIDE ,IN THE CLOSET 1ST FROM NORTH AT EAST, IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 14, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING MATERIALS BETWERN FROM WALL SURFACE TO ALL EDGES OF THE WOOD WINDOW CASING, JAMBS,,HEADER AND APORON 2ND FROM SOUTH AT WEST, . IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM | Oct 14, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER SASH WINDOW 1ST FROM SOUTH AT WEST, IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 14, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2005 HMC: REFIT UPPER AND LOWER SASHS WINDOWS 2ND FROM SOUTH AT WEST IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 14, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING MATERIALS BETWERN FROM WALL SURFACE TO ALL EDGES OF THE .INTERIOR AND EXTERIOR SIDE WOOD DOOR FRAME ,.AT THE ROOM ENTRANCE 1ST FROM NORTH AT EAST, IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT F7, 6th STORY | Oct 14, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING MATERIALS BETWEEN FROM SOUTH WALL TO EAST EXTERIOR PANEL OF THE WASHBASIN CABINET 1ST FROM EAST AT SOUTH, IN THE BATHROOM LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 14, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BARREL LEVEL STOPPER OF THE BATHTUB DRAINAGE, IN THE BATHROOM LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 14, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD DOOR JAMBS AT THE ROOM ENTRANCE, IN THE BATHROOM LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 14, 2025 |
| Sep 9, 2025 | B | Apt F7 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING, IN THE BATHROOM LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 14, 2025 |
Showing 60 of 111. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Nov 12, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT BULKHEAD DOOR , 6th STORY | Open |
| Sep 25, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39149834P. AS OF 9/25/2026., FILE A CERTIFICATE | Open |
| Sep 10, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT F7, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Aug 14, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT A1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Jul 24, 2026 | ECB | Elevators: CEASE USE ITEM: MISSING SELECTOR TAPE SWITCH (APPENDIX K3). CLASS 2 ITEMS: ADJUST FLOOR STOPS. INOPERATIVE CAB LIGHT. PHONE DIALS PREVIOUS CONTRACTOR(2.27.1.1.3.). BRAKE PADS RUBBING (2.24.8.). UNREADABLE MAIN | Open |
| Jul 22, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSION ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDING FOR NOTICE OF VIOLATION # 39149834P ISSUED ON 06/03/2025 PURSUANT TO 28-204.4, FILE A CERTIFICATE | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 3:00 AM ET. BBL 3053890067.