2 floors · 1 apartments · 2,890 sq ft · built 2001 · class K2 · owner of record: Triple D Development
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 288 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1140 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 14, 2018 | Construction CLASS - 3 WORK WITHOUT A PERMIT.NOTE:AT INSPECTION 1ST FLOOR FULL HEIGHT PARTITION WALL ERECTED.APPROX 15'H X 8'2 CONSTRUCTED WITH SHEETROCK AND WOOD 2'X4'S!REM:OBTAIN ALL REQUIRED PERMITS. #35330783P | Jul 18, 2018 IN VIOLATION | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 2) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Mar 20, 2013 | B | Apt 2FL · SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT WEST WALL IN THE TERRACE LOCATED AT APT 2FL, 2nd STORY | Apr 24, 2013 |
| Mar 20, 2013 | B | Apt 2FL · SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE WATER CLOSET COVER IN THE BATHROOM LOCATED AT APT 2FL, 2nd STORY | Apr 24, 2013 |
| Mar 20, 2013 | B | Apt 2FL · SECTION 27-2026 ADMIN. CODE: REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET BOWL IN THE BATHROOM LOCATED AT APT 2FL, 2nd STORY | Apr 24, 2013 |
| Sep 13, 2010 | B | Apt 2FL · SECTION 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE WATER TANK COVER AT TOILET IN THE BATHROOM LOCATED AT APT 2FL, 2nd STORY | Oct 18, 2010 |
| Sep 13, 2010 | B | Apt 2FL · SECTION 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET .. IN THE BATHROOM LOCATED AT APT 2FL, 2nd STORY | Oct 18, 2010 |
| Sep 13, 2010 | A | Apt 2FL · SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED ACCOUSTIC CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 2FL, 2nd STORY | Dec 17, 2010 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 9:59 AM ET. BBL 5038160022.