Manhattan · Block 940 · Lot 1 · 10016

622 2 Avenue

3 floors · 44,500 sq ft · built 1966 · class M1 · owner of record: Dioc Armenian Church

5open violations
$2,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
67dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 67 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 67 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 44,500 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 188 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 188 days
Annual filing

Open violations

ECB / OATH (1) · $2,500 owed
IssuedViolationHearingBalance
Feb 16, 2026Construction CLASS - 1
FAILURE TO MAINTAIN. AT EXPOSURE #2 THERE IS A SLAB OF SNOW THAT HAS FROZEN OVER AND TURNED INTO ICE WITH THE POSSIBILITY OF COLLAPSING TO GROUND LEVEL AND INJURING SOMEBODY, REPAIR AND/REPLACE
#39177360K
Nov 20, 2026
$2,500
DOB (4)
IssuedViolationStatus
Feb 25, 2026CONSTRUCTION
STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED EXCESSIVE SNOW/ICE BUILDING UP ON ROOF IN DANGER OF COLLAPSING ONTO PUBLIC SIDEWALK. FDNY WAS REQUESTED TO REMOVE SNOW/ICE.
#26-00596
DOB VIOLATION - ACTIVE
May 14, 1990PUBLIC ASSEMBLY

#603CG
DOB VIOLATION - ACTIVE
Apr 25, 1989PUBLIC ASSEMBLY

#602CG
DOB VIOLATION - ACTIVE
Apr 25, 1989PUBLIC ASSEMBLY

#603CG
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 6)
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 25, 2026, 11:32 AM ET. BBL 1009400001.

Look up another building