Brooklyn · Block 7116 · Lot 1 · 11223

62 Avenue U

3 floors · 5 apartments · 4,150 sq ft · built 1931 · class S5 · owner of record: L&Z 62 Realty Llc

5open violations
$2,750ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 70 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 70 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 86 days
Annual
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 15 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 435 days
Next cycle year 2027

Open violations

ECB / OATH (3) · $2,750 owed
IssuedViolationHearingBalance
Sep 13, 2026Unknown CLASS - 3
I OBSERVED THREE HVAC UNITS INSTALLED ON THE SIDE OF THE BUILDING WITHOUT AN ELECTRICAL PERMIT ON FILE., OBTAIN PERMIT; OBTAIN ELECTRICAL PERMIT
#39203899K
Nov 25, 2026
PENDING
$250
Sep 2, 2026Construction CLASS - 2
ATOI, OBSERVED HORIZONTAL ENLARGEMENT AT 1ST FLOOR OF BUILDING AT EXPOSURE 1 AND 4. ENCLOSURE WAS INSTALLED APPROX. 5FT INTO PEDESTRIAN SIDEWALK. STRUCTURE WAS ALTERED AT EXPOSURE 4 TO AUGMENT AND FACILITATE TH
#39203004K
Nov 18, 2026
PENDING
$1,250
Sep 2, 2026Construction CLASS - 2
AT TIME OF INSPECTION, OBSERVED 10INCH DUCT WORK FROM COMMERCIAL SPACE TERMINATING ONTO PUBLIC SIDEWALK DIRECTLY BELOW THE FIRE ESCAPE LANDING AND WITHIN 5FT OF OPERATABLE WINDOW., REPAIR AND/OR REPLACE
#39203003Z
Nov 18, 2026
PENDING
$1,250
DOB (0)

None open.

DOB NOW Safety (1)
IssuedViolationStatus
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 15)
Active
HPD (1) · C 0 · B 1 · A 0
IssuedClassViolationCorrect by
Jun 5, 2024B§ 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL. AT PUBLIC HALLJul 10, 2024

Issued in the last 120 days

DateSourceWhatNow
Sep 13, 2026ECBUnknown: I OBSERVED THREE HVAC UNITS INSTALLED ON THE SIDE OF THE BUILDING WITHOUT AN ELECTRICAL PERMIT ON FILE., OBTAIN PERMIT; OBTAIN ELECTRICAL PERMITOpen
Sep 2, 2026ECBConstruction: ATOI, OBSERVED HORIZONTAL ENLARGEMENT AT 1ST FLOOR OF BUILDING AT EXPOSURE 1 AND 4. ENCLOSURE WAS INSTALLED APPROX. 5FT INTO PEDESTRIAN SIDEWALK. STRUCTURE WAS ALTERED AT EXPOSURE 4 TO AUGMENT AND FACILITATE THOpen
Sep 2, 2026ECBConstruction: AT TIME OF INSPECTION, OBSERVED 10INCH DUCT WORK FROM COMMERCIAL SPACE TERMINATING ONTO PUBLIC SIDEWALK DIRECTLY BELOW THE FIRE ESCAPE LANDING AND WITHIN 5FT OF OPERATABLE WINDOW., REPAIR AND/OR REPLACEOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 22, 2026, 5:57 PM ET. BBL 3071160001.

Look up another building