5 floors · 12 apartments · 12,239 sq ft · built 1901 · class C7 · owner of record: Checo 200 West 14th Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 65 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-06-10 (Accepted). Agency page | Dec 31, 2026 in 65 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 81 days | Annual |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1161 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 21, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION I OBSERVED SIDEWALK SHED INSTALLED ON EXPOSURE #1 AND 2 WITH INOPERABLE LIGHT BULBS AT UNDERSIDE THE SHED TO BRING ILLUMINATION FAILURE TO PROVIDE LIGHTING CREATES UNSAFE AND MUGGING CONDI #39553224M | May 25, 2027 DEFAULT | $5,000 |
| Mar 25, 2026 | Unknown CLASS - 1 FAILURE TO COMPLY AND MAINTAIN AS PER CODE SPECIFICATIONS. OBSERVED SUPPORTED SCAFFOLD WITH LOSE NETTING BY ADJACENT BUILDING AND MISSING TOE BOARDS ON SEVERAL LEVELS WERE NOT COMPLYING WITH THE REQUIRED SAFETY #39552195H | Mar 11, 2027 | $5,000 |
| Dec 26, 2025 | Construction CLASS - 1 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER VIO#111725PI10202ZT CONTROL #350372 DATED 11/17/2025. NO COMPLIANCE ON FILE FOR CORRECTIVE ACTION PLAN. REMEDY: COMPLY WITH THE COMMISSIONER'S ORDER. #35718806J | May 4, 2027 PENDING | $6,250 |
| Issued | Violation | Status |
|---|---|---|
| Nov 17, 2025 | CONSTRUCTION FTC W/COMMISSIONER'S ORDER#341490 VIO#071025PI10201SB DATED 07/10/25 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 08/10/25&START BLDG REPAIRS UNDER PERMIT BY 09/10/2025&COMPL/SIGNED OFF BY 10/10/2025 AS OF 11/17/25 A REVISED CAP WAS NOT SUBMITTED FOLLOWING DOB REJECTION IMMED COMPLY W/COMM #PI10202ZT | DOB VIOLATION - ACTIVE |
| Jul 10, 2025 | CONSTRUCTION EMERGENCY WORK ORDER REQ'D-OBSVD @ EXP1&2 HAZ CONDITIONS SUCH AS SPALLING/CRACKED MASONRY @ MULT LOCATIONS. OWNER TO IMMED PROVIDE SAFETY MEASURES TO SECURE/PROTECT PUBLIC @ EXP1 W. 14 ST AND EXP2 7 AVE. INSTALL S/W FULL S/W FRONAGE @ 14 ST AND 7 AVE #PI10202SB | DOB VIOLATION - ACTIVE |
| Jul 10, 2025 | CONSTRUCTION CORRECTIVE ACTION PLAN REQ'D-OBSVD @ EXP 1&2 HAZ CONDITIONS SUCH AS SPALLING/CRACKED MASONRY @ MULT LICATIONS. @ EXP1 ON TOP OF MAIN ENTRANCE OBSVD SPALLED OFF MASONRY @ DECORATIVE STONE LOOSE MASONRY @ WATERTABLE. OWNER TO IMMED RETAIN A REG DESIGN PROF TO EVAL ENTIRE BLD & SUBMIT A CORRECTIVE ACTI #PI10201SB | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Apr 29, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 2, 2026 |
| Sep 13, 2022 | B | Apt 3N · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT EAST WALL 1. SQ FT INSIDE CLOSET IN THE 3rd ROOM FROM EAST LOCATED AT APT 3N, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 15152751 ISSUED 13-MAY-22 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATI | Oct 18, 2022 |
| May 26, 2022 | B | Apt 3S · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH 10 SQ FT AND EAST 5 SQ FT WALLS IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 3S, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 30, 2022 |
| May 26, 2022 | C | Apt 3S · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING 40 SQ FT, NORTH WALL 20 SQ FT AND SOUTH WALL 15 SQ FT IN THE KITCHEN LOCATED AT APT 3S, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 21, 2022 |
| May 26, 2022 | C | Apt 3S · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT EAST 20 SQ FT, NORTH 20 SQ FT AND SOUTH 20 SQ FT WALLS IN THE BATHROOM LOCATED AT APT 3S, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 21, 2022 |
| May 20, 2022 | B | Apt 3S · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 20 SQ FEET AT CEILING IN THE BATHROOM LOCATED AT APT 3S, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 24, 2022 |
| May 20, 2022 | B | Apt 3S · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 25 SQ FEET AT CEILING AND NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3S, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 24, 2022 |
| May 20, 2022 | C | Apt 3S · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPPROX 30 SQ AT ALL WALLS AND CEILING IN THE KITCHEN LOCATED AT APT 3S, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 15, 2022 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 2:26 PM ET. BBL 1006180032.