4 floors · 2 apartments · 3,288 sq ft · built 1930 · class K4 · owner of record: Vkc Partners Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 66 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 310 days | Required only if the owner doesn't live there |
None open.
| Issued | Violation | Status |
|---|---|---|
| Aug 16, 2021 | CONSTRUCTION FAILURE TO COMPLY WITH COMMISSIONER'S ORDER# 356977(040621FEU10603PN) DATED 04/06/21 REQ OWNR TO PERMANENTLY REPAIR BLDG UNDR PERMIT STRTING BY 06/01/21.AS OF 08/16/21 NO REPAIR PLANS HAVE BEEN FILED WITH DOB AND NO REPAIR WORK HAS STARTED.IMMEDIATELY COMPLY WITH COMMISH ORDER# 356977(040621FEU10603 #FEU10602PN | DOB VIOLATION - ACTIVE |
| Aug 16, 2021 | CONSTRUCTION EMERG WORK ORDER:EXP1 MASN FACADE HAS VARIOUS STEP CRACKS EMANATING FRM WINDW LINTLS.BRICKS BULG OUT.LINTLS INADQ SUPPRT'D @ CRACK/SHIFTED LOCAT'S.EXP3 SIM CONDNS.CONDNS POSE A DNGR TO PBLC.OWNR RETN NYSPE LIC CONTR TO IMMD TMP BRACE/STABLZE EXP1&3 MASN FACDE&LINTLS.PE PROV SUPV+ DIRCT.STRT WRK BY 8 #FEU10604PN | DOB VIOLATION - ACTIVE |
| Apr 6, 2021 | CONSTRUCTION FTM BLDG SAFE COND:DUE TO NEARBY CONST @ 609 2 AVE,IT APPEARS 617 BLDG RACKD TWRDS 609 CONST SITE.AT 619,FLR SEPART@2ND&3RD FLRING/EXP2 PARTY WALL APROX 1 IN WIDE NEAR EXP 2/3CRNR.INTR CRACKS 2/3CRNR.ROOFING TORN BTWN 617/619 NEAR 1/2 CRNR.OWNER RETN NYSPE TO EVALU ENTIRE BLDG &PREP RPR DWGS.BLDG TO #FEU10603PN | DOB VIOLATION - ACTIVE |
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 6:21 AM ET. BBL 1009140034.