12 floors · 583 apartments · 638,539 sq ft · built 1949 · class D1 · owner of record: Nyc Housing Authority
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 45 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 45 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 45 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 61 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 638,539 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 166 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 166 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page | Feb 21, 2028 in 462 days | No Cycle 10 report on record yet |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3570). Agency page | Dec 31, 2030 in 1506 days | Next due 2030 |
| Annual boiler inspection (5 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-30 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 23, 2026 | Boilers CLASS - 2 FOUND JOHNSON DUAL FUEL BOILER MODEL# PFTA-600 WITH EXPOSED WIRING, LEAKING GLASS GAUGE, CORRODED WATER COLUMN, HAND HOLES CORRODED, DOG BOLTS MISSING ON ALL DOORS, MAIN CONDENSATE RECIEVING TANK CORRODED AND L #39209150X | Oct 30, 2026 POP/IN-VIO | $0 |
| Oct 23, 2026 | Boilers CLASS - 2 FOUND JOHNSON DUAL FUEL BOILER MODEL # PFTA-600 NOT OPERABLE, EXPOSED WIRING, CAP MISSING ON GAS REGULATOR AT PILOT ASSEMBLY, WATER FEED LINE CORRODED, DOG BOLTS MISSING ON BOILER DOORS. #39209147P | Oct 30, 2026 POP/IN-VIO | $0 |
| Oct 23, 2026 | Boilers CLASS - 2 FOUND JOHNSON DUAL FUEL BOILER MODEL# PFTA-600, WITH EXPOSED WIRES, LEAK ON RETURN LINE,REAR CHAMBER DOR NEEDS TO BE RESEALED AND MISSING BOLTS, CORRODED HANDHOLES, WATER LEAKING FROM STEAM MAIN AND LEAKING ONT #39209146N | Oct 30, 2026 POP/IN-VIO | $0 |
| Oct 23, 2026 | Boilers CLASS - 2 FOUND JOHNSON DUAL FUEL BOILER NOT OPERABLE, EXPOSED WIRING, STEAM LEAK AT CONDENSATE TANK, DIRTY GLASS GAUGE, LIGHT FIXTURES NOT WORKING, #39209148R | Oct 30, 2026 POP/IN-VIO | $0 |
| Oct 23, 2026 | Boilers CLASS - 2 FOUND JOHNSON DUAL FUEL BOILER, MODEL# PFTA -600, WITH EXPOSED WIRING,CAP ON GAS REGULATOR ON PILOT ASSEMBLY MISSING, BURNER IN NEED OF IMMEDIATE SERVICE LOUD MOTOR NOISE. #39209149Z | Oct 30, 2026 POP/IN-VIO | $0 |
| May 16, 2024 | Construction CLASS - 2 AT TIME OF INSPECTION FOR A SIDEWALK SHED REMOVAL, OBSERVED SWS HAS BEING REMOVED ALREADY. NO SWS AT ANY EXPOSURE, UPON REQUESTING SITE SAFETY PLAN NOTICE SWS AT EXP. 1 AND 3 AND AT PAGE ONE ON CLOSE OUT INSTRU #39528676Z | Aug 2, 2024 ADMIT/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 21, 1996 | CONSTRUCTION #STG4 | DOB VIOLATION - ACTIVE |
| Apr 30, 1991 | ELEVATOR DEVICE #2P3176 #1187C03 | VIOLATION UNSERVED ECB-ACTIVE |
| Apr 21, 1982 | CONSTRUCTION #STZ6 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Closed |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Closed |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Closed |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Closed |
| Oct 23, 2026 | ECB | Boilers: FOUND JOHNSON DUAL FUEL BOILER MODEL# PFTA-600 WITH EXPOSED WIRING, LEAKING GLASS GAUGE, CORRODED WATER COLUMN, HAND HOLES CORRODED, DOG BOLTS MISSING ON ALL DOORS, MAIN CONDENSATE RECIEVING TANK CORRODED AND L | Open |
| Oct 23, 2026 | ECB | Boilers: FOUND JOHNSON DUAL FUEL BOILER MODEL # PFTA-600 NOT OPERABLE, EXPOSED WIRING, CAP MISSING ON GAS REGULATOR AT PILOT ASSEMBLY, WATER FEED LINE CORRODED, DOG BOLTS MISSING ON BOILER DOORS. | Open |
| Oct 23, 2026 | ECB | Boilers: FOUND JOHNSON DUAL FUEL BOILER MODEL# PFTA-600, WITH EXPOSED WIRES, LEAK ON RETURN LINE,REAR CHAMBER DOR NEEDS TO BE RESEALED AND MISSING BOLTS, CORRODED HANDHOLES, WATER LEAKING FROM STEAM MAIN AND LEAKING ONT | Open |
| Oct 23, 2026 | ECB | Boilers: FOUND JOHNSON DUAL FUEL BOILER NOT OPERABLE, EXPOSED WIRING, STEAM LEAK AT CONDENSATE TANK, DIRTY GLASS GAUGE, LIGHT FIXTURES NOT WORKING, | Open |
| Oct 23, 2026 | ECB | Boilers: FOUND JOHNSON DUAL FUEL BOILER, MODEL# PFTA -600, WITH EXPOSED WIRING,CAP ON GAS REGULATOR ON PILOT ASSEMBLY MISSING, BURNER IN NEED OF IMMEDIATE SERVICE LOUD MOTOR NOISE. | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 16, 2026, 5:49 AM ET. BBL 2035700001.