8 floors · 283,833 sq ft · built 1934 · class I6 · owner of record: Light Property Holdings Associates Llc

65open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
60dto Annual boiler inspection (6 boilers)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 60 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (6 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-16 (Accepted). Agency page

Dec 31, 2026
in 60 days
6 of 6 without an accepted 2026 report yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 283,833 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 181 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 181 days
Annual filing
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 425 days
Next cycle year 2027
Energy audit and retro-commissioning (2027) Likely applies
Local Law 87 · Calendar year 2027
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 4427). Agency page

Dec 31, 2027
in 425 days
Next due 2027
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $226,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 477 days
No Cycle 10 report on record yet

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Apr 11, 2024Local Law CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #908652. REMEDY: SUBMIT ACCEPTABLE REQU
#37027983K
Aug 2, 2024
IN VIOLATION
$0
DOB (25)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#07128
DOB VIOLATION - ACTIVE
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#07129
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#22134
DOB VIOLATION - ACTIVE
Feb 22, 2023NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
#00943
DOB VIOLATION - ACTIVE
Sep 6, 2019(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
#04128
DOB VIOLATION - ACTIVE
Sep 6, 2019(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
#04130
DOB VIOLATION - ACTIVE
Sep 6, 2019(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
#04129
DOB VIOLATION - ACTIVE
Jan 26, 2018(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
#04989
DOB VIOLATION - ACTIVE
Jan 26, 2018(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
#04988
DOB VIOLATION - ACTIVE
Jan 26, 2018(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
#04990
DOB VIOLATION - ACTIVE
Jan 26, 2018(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
#04991
DOB VIOLATION - ACTIVE
Jan 26, 2018(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
#04992
DOB VIOLATION - ACTIVE
Jan 26, 2018(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
#04993
DOB VIOLATION - ACTIVE
Jan 26, 2018(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
#04994
DOB VIOLATION - ACTIVE
Jan 3, 2017(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
#05151
DOB VIOLATION - ACTIVE
Jan 3, 2017(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
#05152
DOB VIOLATION - ACTIVE
Jan 3, 2017(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
#05150
DOB VIOLATION - ACTIVE
Nov 14, 2016(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
#05739
DOB VIOLATION - ACTIVE
Nov 14, 2016(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
#05745
DOB VIOLATION - ACTIVE
Nov 14, 2016(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
#05744
DOB VIOLATION - ACTIVE
Nov 14, 2016(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
#05743
DOB VIOLATION - ACTIVE
Nov 14, 2016(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
#05741
DOB VIOLATION - ACTIVE
Nov 14, 2016(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
#05740
DOB VIOLATION - ACTIVE
Nov 14, 2016(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
#05742
DOB VIOLATION - ACTIVE
Dec 1, 2009ELEVATOR

#9027/319264
DOB VIOLATION - ACTIVE
DOB NOW Safety (39)
IssuedViolationStatus
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 11)
Active
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 11)
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Report
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
Feb 22, 2023Facades FISPNRF
CYCLE 9B NO REPORT FILED
Active
Sep 6, 2019Elevators ACC1
Active
Sep 6, 2019Elevators ACC1
Active
Sep 6, 2019Elevators ACC1
Active
Jul 31, 2018Facades FISPNRF
FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
Active
Jan 26, 2018Elevators ACC1
Active
Jan 26, 2018Elevators ACC1
Active
Jan 26, 2018Elevators ACC1
Active
Jan 26, 2018Elevators ACC1
Active
Jan 26, 2018Elevators ACC1
Active
Jan 26, 2018Elevators ACC1
Active
Jan 26, 2018Elevators ACC1
Active
Jan 3, 2017Elevators ACC1
Active
Jan 3, 2017Elevators ACC1
Active
Jan 3, 2017Elevators ACC1
Active
Nov 14, 2016Elevators ACC1
Active
Nov 14, 2016Elevators ACC1
Active
Nov 14, 2016Elevators ACC1
Active
Nov 14, 2016Elevators ACC1
Active
Nov 14, 2016Elevators ACC1
Active
Nov 14, 2016Elevators ACC1
Active
Nov 14, 2016Elevators ACC1
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 1, 2026, 9:04 AM ET. BBL 2044270029.

Look up another building