4 floors · 37,499 sq ft · built 1929 · class W9 · owner of record: 11 Bartlett Owner, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (4 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-17 (Accepted). Agency page | Dec 31, 2026 in 68 days | 2 of 4 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 37,499 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 189 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 189 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 799 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 11, 2023 | Construction CLASS - 1 RE-ISSUE#35553873R FAILURE TO MAINTAIN BUILDING WALL(S)OR APPURTENANCES.NOTE:OBSERVED AT ROOF LEVEL,THE TOWER HAS SEVERAL STEP CRACKS,BRICKSTHAT HAVE SHIFTED AND ON THE CORNER EXP#2 & #3 OF THE TOWER.THERE IS A #35665133H | Mar 22, 2023 IN VIOLATION | $2,500 |
| Jan 11, 2023 | Construction CLASS - 2 REISSUE#35643269J FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTE:OBSERVED AT STAIR "A" BULKHEAD.THE SKYLIGHT HAS SEVERAL CRACKEDGLASS WINDOW PANELS OVERHEAD WHICH HAVE ALLOWED WATER PENETRATION TO A #35665132X | Mar 22, 2023 IN VIOLATION | $625 |
| Issued | Violation | Status |
|---|---|---|
| Aug 21, 2026 | CONSTRUCTION FTM. OBSRVD ON EXP 1 S.ELEV: MISSING MORTAR JOINTS @ 4TH FLLINTEL & PARPET; CRACKS IN LINTELS, OPEN MORTAR JOINTS IN SILL ON 4TH FL. EXP 2 W.ELEV: CRACK IN BRICK WORK @ 4TH FL LINTEL HEIGHT; CRACK IN MORTAR JOINT @ CONCRTE LINTEL; CRACK IN STUCCO, ERODING BRICK @ PARPET. EXP 3 N.ELEV: CRACK IN 3RD F #SR0101RF | DOB VIOLATION - ACTIVE |
| Aug 21, 2026 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO SEVERLY CRACKED STONE LINTEL @4FL, OPEN MORTAR JOINTS/SHIFTED STONE & 4FL LINTEL/EYEBROW, OPEN MORTAR JOINTS, DAMAGED/LEANING CANOPY EXP1 SOUTH. REMEDY: IMMEDIATELY INSTALL SIDEWALK SHED ALONG EXPOSURE 1 SOUTH (BARTLETT ST) UNDER DIRECTION OF A LICENSED PROFESSIONAL #SR30709RF | DOB VIOLATION - ACTIVE |
| Jan 1, 2012 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #01795 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #02878 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #19014 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 1, 2012 | Benchmarking - LL84 FTF-EN-BENCH | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 21, 2026 | DOB | CONSTRUCTION: FTM. OBSRVD ON EXP 1 S.ELEV: MISSING MORTAR JOINTS @ 4TH FLLINTEL & PARPET; CRACKS IN LINTELS, OPEN MORTAR JOINTS IN SILL ON 4TH FL. EXP 2 W.ELEV: CRACK IN BRICK WORK @ 4TH FL LINTEL HEIGHT; CRACK IN MORTAR JOINT @ CONCRTE LINTEL; CRACK IN STUCCO, ERODING BRICK @ PARPET. EXP 3 N.ELEV: CRACK IN 3RD F | Open |
| Aug 21, 2026 | DOB | CONSTRUCTION: EMERGENCY WORK ORDER DUE TO SEVERLY CRACKED STONE LINTEL @4FL, OPEN MORTAR JOINTS/SHIFTED STONE & 4FL LINTEL/EYEBROW, OPEN MORTAR JOINTS, DAMAGED/LEANING CANOPY EXP1 SOUTH. REMEDY: IMMEDIATELY INSTALL SIDEWALK SHED ALONG EXPOSURE 1 SOUTH (BARTLETT ST) UNDER DIRECTION OF A LICENSED PROFESSIONAL | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 7:05 AM ET. BBL 3022680001.