4 floors · 71,200 sq ft · built 1931 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 59 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 59 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 71,200 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 180 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 180 days | Annual filing |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3212). Agency page | Dec 31, 2032 in 2251 days | Next due 2032 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-03 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 30, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION, THE FOLLOWING DOORS WERE NOT SELF-CLOSING:-STAIR "G" ON 4TH FLOOR, STAIR "G" 2ND FLOOR, STAIR "F" ON 1ST FLOOR, EXIT #2 VESTIBUL #35732958J | May 27, 2026 POP/IN-VIO | $0 |
| Apr 30, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION, STAIR "G" AND "F" SWINGS AGAINST THE PATH EGRESSION THE 1ST FLOOR, STORAGE IN ELECTRICAL METER ROOM, CRACKS IN STONE RETAINING W #35732960Z | May 27, 2026 POP/IN-VIO | $0 |
| Apr 30, 2026 | Construction CLASS - 2 STAIR AND/OR FLOOR IDENTIFICATION SIGNS MISSING AND/OR DEFECTIVE:-AT THE TIME OF INSPECTION, THE FOLLOWING EXIT DISCHARGES DOOR DID NOT HAVEDESIGNATION:-#6, #4, #5. REMEDY: INSTALL AND/OR REPAIR SIGNS. #35732961K | May 27, 2026 POP/IN-VIO | $0 |
| Apr 30, 2026 | Construction CLASS - 2 RE-ISSUE 35719729J. AT THE TIME OF INSPECTION, THE FOLLOWING EMERGENCYLIGHTS WERE INOPERABLE:-ILLUMINATED EXIT SIGN AT STAIR "D" ON 4TH FLOOR, A MISSING BULD FROM (2)EMERGENCY LIGHT 3RD FLOOR GYM BOX #15, #16 H #35732959L | May 27, 2026 POP/IN-VIO | $0 |
| May 9, 2025 | Construction CLASS - 2 REISSUE#35677509P FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.OBSERVED AT AUDITORIUM,CAFETERIA AND SEVERAL LOCATION THR #35719729J | Jul 16, 2025 POP/IN-VIO | $0 |
| Apr 29, 2024 | Construction CLASS - 2 REISSUE#35672827H FAILURE TO MINTAIN BUILDING IN CODE-COMPLIANT MANNERILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.AT TIME OF MY INSPECTION I OBSERVED AT THE 1ST FLOOR 17 STA #35677509P | Jul 24, 2024 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 18, 2021 | ELEVATOR #9027/710742 | DOB VIOLATION - ACTIVE |
| Oct 12, 2020 | ELEVATOR #9027/690736 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 2, 2026, 8:39 PM ET. BBL 3032120001.