1 floors · 16,500 sq ft · built 1967 · class F1 · owner of record: Sbh
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 68 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 21, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER FOR DOB VIO25-02430 AND VIO25-02429 IN CONNECTION WITH 39165223X. NO ENGINEERS REPORT PROVIDED, NO COMPLIANCE RECORDED FOR ECB39165223X. JOB B01073616 #39204793R | Nov 25, 2026 PENDING | $2,500 |
| Oct 29, 2025 | Construction CLASS - 1 WORK WITHOUT A PERMIT: AT THE TIME OF INSPECTION, OBSERVED AT ROOF, SOLAR PANEL ARRAY INSTALLED. DOB RECORDS INDICATE ISSUED ELECTRICAL PERMIT #B01295052-I1-EL FOR SOLAR GENERATING SYSTEM, INCLUDING 56 MICROINV #39165223X | Jan 14, 2026 DEFAULT | $12,500 |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2025 | CONSTRUCTION WORK WITHOUT A PERMIT: AT THE TIME OF INSPECTION, OBSERVED SOLAR PANELS INSTALLED AT ROOF ELEVATION WITHOUT A PERMIT, NO DESIGN DRAWINGS FILED FOR ATTACHMENT TO ROOF OR CONNECTION OF SOLAR PANELS TO METAL RAILS. #25-02430 | DOB VIOLATION - ACTIVE |
| Oct 29, 2025 | CONSTRUCTION WORK WITHOUT A PERMIT: OBSERVED SOLAR PANELS INSTALL AT ROOF ELEVATION WITH NO PERMIT ON FILE #25-02429 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 21, 2026 | ECB | Construction: UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER FOR DOB VIO25-02430 AND VIO25-02429 IN CONNECTION WITH 39165223X. NO ENGINEERS REPORT PROVIDED, NO COMPLIANCE RECORDED FOR ECB39165223X. JOB B01073616 | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 10:47 AM ET. BBL 3004650001.