1 floors · 19,000 sq ft · built 1927 · class E2 · owner of record: Dssr Realty Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 67 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 22, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. 1-STORY WAREHOUSE BUILDING WITH BRICK FACADE. EXP 1 IS ON PRESIDENT ST AND EXP 3 ASWELL AS SEVERAL STEP CRACKS AND CRACKED MORTAR AT EXP 1 AND EXP 3. THI #35718697J | Dec 2, 2026 PENDING | $2,500 |
| Sep 14, 2026 | Unknown CLASS - 1 FAILURE TO MAINTAIN PARKING STRUCTURE IN SAFE CONDITION. AS NOTED AT TIME OF INSPECTION ON ACTIVE OCCUPIED PARKING STRUCTURE CONSISTING OF CELLAR LEVEL, OBSERVED SPALLED/CRACKED CONCRETE AT BEAMS, SLABS AND COL #35730973Z | Nov 18, 2026 PENDING | $2,500 |
| Jun 19, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN. AT TIME OF INSPECTION OBSERVED FACADE IN STATE OFDISREPAIR WALL ABOVE GATE AT EXP #1 BULGING, BRICKS DISPLACED AND MATERIAL LINTEL SAGGING. ALSO CRACKS AT EXP #1 WALL AT MULTIPLE LOCATIONS. #35685889X | Aug 26, 2026 DEFAULT | $12,500 |
| Issued | Violation | Status |
|---|---|---|
| Sep 22, 2026 | CONSTRUCTION CORRECTIVE ACTION PLAN REQ'D-OBSVD SEVERAL CRACKS IN MASONRY THROUGHOUT BLDG AT EXP1 AND EXP3, LARGE CRACK & SEPARATION OBSVD AT EXP1/2 CORNER. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB & NYS TO EVAL ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN BY 10/22/2026 #PI30601TC | DOB VIOLATION - ACTIVE |
| Sep 22, 2026 | CONSTRUCTION EMERGENCY WORK ORDER-BLDG IS IN STATE OF DISREPAIR WITH VARIOUS CRACKS THROUGHOUT INCL LARGE CRACKS AND SEPARATION AT EXP1/2 CORNER THE BLDG WALLS ARE UNSTABLE AND AT RISK OF COLLAPSE. OWNER TO IMMED RETAIN DOB REG CONTRACTOR TO INSTALL S/W FENCE THE ENTIRE LENGTH OF EXP1 ON PRESIDENT ST, START WORK #PI30602TC | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #10131 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #31923 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 6) | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 22, 2026 | DOB | CONSTRUCTION: CORRECTIVE ACTION PLAN REQ'D-OBSVD SEVERAL CRACKS IN MASONRY THROUGHOUT BLDG AT EXP1 AND EXP3, LARGE CRACK & SEPARATION OBSVD AT EXP1/2 CORNER. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB & NYS TO EVAL ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN BY 10/22/2026 | Open |
| Sep 22, 2026 | DOB | CONSTRUCTION: EMERGENCY WORK ORDER-BLDG IS IN STATE OF DISREPAIR WITH VARIOUS CRACKS THROUGHOUT INCL LARGE CRACKS AND SEPARATION AT EXP1/2 CORNER THE BLDG WALLS ARE UNSTABLE AND AT RISK OF COLLAPSE. OWNER TO IMMED RETAIN DOB REG CONTRACTOR TO INSTALL S/W FENCE THE ENTIRE LENGTH OF EXP1 ON PRESIDENT ST, START WORK | Open |
| Sep 22, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. 1-STORY WAREHOUSE BUILDING WITH BRICK FACADE. EXP 1 IS ON PRESIDENT ST AND EXP 3 ASWELL AS SEVERAL STEP CRACKS AND CRACKED MORTAR AT EXP 1 AND EXP 3. THI | Open |
| Sep 14, 2026 | ECB | Unknown: FAILURE TO MAINTAIN PARKING STRUCTURE IN SAFE CONDITION. AS NOTED AT TIME OF INSPECTION ON ACTIVE OCCUPIED PARKING STRUCTURE CONSISTING OF CELLAR LEVEL, OBSERVED SPALLED/CRACKED CONCRETE AT BEAMS, SLABS AND COL | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 5:53 AM ET. BBL 3004410024.