5 floors · 72,200 sq ft · built 1940 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-18 (Accepted). Agency page | Dec 31, 2026 in 43 days | 1 of 3 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 72,200 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 164 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 164 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 774 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2034) Likely applies Local Law 87 · Calendar year 2034 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 394). Agency page | Dec 31, 2034 in 2965 days | Next due 2034 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 5, 2026 | Construction CLASS - 2 REISSUE#35693257H FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:THROUGHOUT THE SCHOOL,THERE ARE SEVERAL BROKEN OR CRACKED GLASS PANELS INCLUDING STAIRWAY PARTITIONS.REM:REPAIR/REPLACE. #35734575L | Aug 20, 2026 POP/IN-VIO | $0 |
| Aug 5, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:LOCATED AND MAIN ENTRANCE EXIT#1 THE STEEL DOOR FRAMES AND MULLIOAS ARE SEVERELYRUSTED AND DETERIORATING.THIS CONDITION EFFECTS THE OPERATION OF THE E #35734578R | Aug 20, 2026 POP/IN-VIO | $0 |
| Aug 5, 2026 | Construction CLASS - 2 REISSUE#35693252Z FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT SEVERAL LOCATIONS THROUGHOUT THE SCHOOL,THERE IS CRACKING,PEELING AND FLAKING ON WALLS AND CEILINGS UE TO WATER PENETRATIONS.AT A #35734577P | Aug 20, 2026 POP/IN-VIO | $0 |
| Aug 5, 2026 | Construction CLASS - 2 REISSUE#35693253K FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:THE STAIRWAY WALLS AND CEILINGS AT THE BULKHEADS ARE PEELING FLAKING AND CRACKING DUE TO WATER PENETRATION.REM:REPAIR/REPLACE. #35734576N | Aug 20, 2026 POP/IN-VIO | $0 |
| Aug 13, 2025 | Construction CLASS - 2 RE-ISSUE #35688925H. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT VARUIOUS LOCATIONS 5TH FL, 3RD FL, AUDITORIUM, CRACKING, PEELING WITH SIGNS OF WATER PENETRATION. REMEDY: REPAIR/REPLACE. #35693252Z | Sep 10, 2025 POP/IN-VIO | $0 |
| Aug 13, 2025 | Construction CLASS - 2 RE-ISSUE #35688924X. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANENR. NOTED: AT BULKHEAD STAIRWAYS, CRACKING, PEELING, AND FLAKING WALLS AND CEILINGS FROM HUMIDITY AND WATER. REMEDY: REPAIR/REPLACE. #35693253K | Sep 10, 2025 POP/IN-VIO | $0 |
| Aug 13, 2025 | Construction CLASS - 2 RE-ISSUE #35688926J. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: THERE ARE SEVERAL BROKEN AND/OR CRACKED GLASS PANELS/WINDOWS THROUGHOUT THE SCHOOL. MANY IN STAIRWAY WALLS. REMEDY: REPAIR/REPL #35693257H | Sep 10, 2025 POP/IN-VIO | $0 |
| Sep 18, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.OBSERVED AT BULKHEADS STAIRS A,C & E CRACKS AND SPALLING.REM:REPAIR AND/OR REPLACE. #35688924X | Dec 5, 2024 POP/IN-VIO | $0 |
| Sep 18, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.OBSERVED AT ROOM507 GLASS MISSING OWN DOORWAY AND THROUGHOUT BUILDING 25 BROKEN GLASS PANELS THROUGHOUT STAIRWELLS.REM:REPAIR AND/OR REPLACE. #35688926J | Dec 5, 2024 POP/IN-VIO | $0 |
| Sep 18, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.OBSERVED AT 5 FLOOR CEILINGS STAIR G,BOYS BATHROOM CRACKS & SPALLING,3 FL 306 CEILING IS SPALLING AND CRACKS WATER PENETRATION 1 FL AUDITORIUM STAGE LEFT EX #35688925H | Dec 5, 2024 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jan 9, 2026 | CONSTRUCTION PARTIAL VACATE ISSUED FOR SCHOOL'S EAST PLAY YARD, DUE TO DEFECTIVE EXTERIOR WALL AT ADJACENT PROPERTY 638 EAST 12 ST. HAVING POTENTIAL HAZARD OF MATERIAL PIECES FALLING ONTO SCHOOL'S PLAY YARD. MAINTAIN 30FT FROM ADJACENT PROPERTY WALL BY WIDTH OF THE LOT AREA (ENTIRE RUNNING TRACK) CLEAR WITH PROT #26-00108 | DOB VIOLATION - ACTIVE |
| Jan 7, 2024 | CONSTRUCTION DUE TO DEBRIS IN FOAM OF AMSONRY PARGING FALLING OFF EXPOSURE 4 WALL O F 638 EAST 12TH STRET. EXPOSURE 2 SIDE OF SCHOOL YARD FOR CHILDREN BY TRACK UNSAFE TO OCCUPY #CER01JM | DOB VIOLATION - ACTIVE |
| May 20, 2020 | ELEVATOR #9027/682045 | DOB VIOLATION - ACTIVE |
| Apr 5, 2019 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST #04371 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Report | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Aug 29, 2025 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | Active |
| Aug 29, 2025 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Sep 11, 2024 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Report | Active |
| Apr 5, 2019 | Elevators EVCAT1 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Report | Open |
| Aug 5, 2026 | ECB | Construction: REISSUE#35693257H FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:THROUGHOUT THE SCHOOL,THERE ARE SEVERAL BROKEN OR CRACKED GLASS PANELS INCLUDING STAIRWAY PARTITIONS.REM:REPAIR/REPLACE. | Open |
| Aug 5, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:LOCATED AND MAIN ENTRANCE EXIT#1 THE STEEL DOOR FRAMES AND MULLIOAS ARE SEVERELYRUSTED AND DETERIORATING.THIS CONDITION EFFECTS THE OPERATION OF THE E | Open |
| Aug 5, 2026 | ECB | Construction: REISSUE#35693252Z FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT SEVERAL LOCATIONS THROUGHOUT THE SCHOOL,THERE IS CRACKING,PEELING AND FLAKING ON WALLS AND CEILINGS UE TO WATER PENETRATIONS.AT A | Open |
| Aug 5, 2026 | ECB | Construction: REISSUE#35693253K FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:THE STAIRWAY WALLS AND CEILINGS AT THE BULKHEADS ARE PEELING FLAKING AND CRACKING DUE TO WATER PENETRATION.REM:REPAIR/REPLACE. | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 18, 2026, 9:55 AM ET. BBL 1003940012.