4 floors · 53,030 sq ft · built 1912 · class K2 · owner of record: The Jane H. Goldman Residuary Trust Numb Er 1
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 42 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 53,030 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 163 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 163 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1138 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 819). Agency page | Dec 31, 2029 in 1138 days | Next due 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-27 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 19, 2026 | Construction CLASS - 2 FTM: AT THE TIME OF INSPECTION, OBSERVED AT EXPOSURE 1 OF PROPERTY, SIDEWALK CURB CUT APPROXIMATELY 21 FEET IN WIDTH LOCATED DIRECTLY IN FRONT OF DOUBLE DOORS APPEARING TO PROVIDE DELIVERY ACCESS. CURB CUT NO L #39208382K | Feb 4, 2027 PENDING | $1,250 |
| Oct 5, 2019 | Elevators CLASS - 2 (93M7/76B7/100R77)(93)PROVIDE CEILING INTERSECTION GUARD FOR UNDERSIDEOF ADJACENT UNIT(96)UPDATE CAUTION SINGAGE AT TOP END.(100)NO ZIP SCREWS ON ESCALATORS.REMOVE FROM AREA OF LOWER LEFT HANDRAIL ENTRY.REMEDY: #38271604M | Dec 12, 2019 STIPULATION/IN-VIO | $315 |
| Oct 5, 2019 | Elevators CLASS - 2 (88I11/100M7/100R11)LEFT HANDRAIL CRACKED,REPLACE.(100)HANDRAIL MISSING FOR DECKING IN LEFT SIDE,PROVIDE(100)NO ZIP SCREW ON ELEVATORS.REMOVE FOR ALTER OF APPROX LEFT HANDRAIL ENTRY. #38271603K | Dec 12, 2019 STIPULATION/IN-VIO | $315 |
| Issued | Violation | Status |
|---|---|---|
| May 3, 2012 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00311 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #00596 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| May 3, 2012 | Benchmarking - LL84 FTF-EN-BENCH | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 19, 2026 | ECB | Construction: FTM: AT THE TIME OF INSPECTION, OBSERVED AT EXPOSURE 1 OF PROPERTY, SIDEWALK CURB CUT APPROXIMATELY 21 FEET IN WIDTH LOCATED DIRECTLY IN FRONT OF DOUBLE DOORS APPEARING TO PROVIDE DELIVERY ACCESS. CURB CUT NO L | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 19, 2026, 2:33 PM ET. BBL 1008190077.