Bronx · Block 4026 · Lot 46 · 10460

601 Baker Avenue

3 floors · 3 apartments · 3,780 sq ft · built 1920 · class C0 · owner of record: 601 Baker Avenue Realty Llc

24open violations
$0ECB/OATH penalties owed
4HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 68 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 68 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 84 days
Annual
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 433 days
Next cycle year 2027

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Sep 6, 2024Unknown CLASS - 2
SUPPORTED SCAFFOLD BC 3314.1.@3 STORY BUILDING IN EXTERIOR FINISH REMOVAL PHASE UP TO 3RD FL OBSERVE UNSAFE 2-3FRAME HIGH SUPPORTED SCAFFOLD IN PLACE FROM CORNER OF EXPOSURE#1 THRU #2 TO FACILITATE EXTERIOR WOR
#39532142X
Nov 15, 2024
IN VIOLATION
$0
Aug 4, 2018Construction CLASS - 3
WORK W/OUT A PERMIT.NOTE.@TIME OF INSP A SECTION OF METAL FENCE ERECTED @EXP#2 IS APPROX 20'L X 8'H.REM:OBTAIN A PERMIT IF FEASIBLE OR RESTORE TO PRIOR LEGAL CONDITION.
#35344225H
Oct 5, 2018
DEFAULT
$0
DOB (0)

None open.

DOB NOW Safety (2)
IssuedViolationStatus
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 11)
Active
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 11)
Active
HPD (20) · C 4 · B 8 · A 8
IssuedClassViolationCorrect by
Nov 30, 2021C§ 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM AT PUBLIC HALL, 1st STORYDec 6, 2021
Nov 30, 2021A§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORYMar 5, 2022
Nov 30, 2021A§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR AT PUBLIC HALL, 1st STORYMar 5, 2022
Nov 30, 2021A§ 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING.Mar 5, 2022
Nov 30, 2021A§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALLMar 5, 2022
Nov 30, 2021A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 3rd STORYMar 5, 2022
Nov 30, 2021B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK VENEER AT THE BUILDING SOUTH EXTERIOR WALLJan 4, 2022
Nov 30, 2021B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT PUBLIC HALL, 3rd STORYJan 4, 2022
Nov 30, 2021A§ 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX AT PUBLIC HALL, 1st STORYMar 5, 2022
Nov 29, 2021CApt 3RDFL · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 3RDFL, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTDec 5, 2021
Nov 29, 2021CApt 3RDFL · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 3RDFL, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTDec 5, 2021
Nov 29, 2021BApt 3RDFL · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 3RDFL, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJan 3, 2022
Nov 29, 2021BApt 3RDFL · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 3RDFL, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJan 3, 2022
Feb 26, 2015AApt 2 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHJun 1, 2015
Feb 26, 2015BApt 2 · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... 20 SQ, FT EAST WALL, NORTH WALL, SOUTH WALL, WEST WALL, CEILING IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHApr 2, 2015
Feb 26, 2015BApt 2 · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF BEDBUGS LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHApr 2, 2015
Feb 21, 2012B§ 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE ,, AT BASEMENTMar 27, 2012
Feb 21, 2012BApt 1 · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... .. CEILING IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTMar 27, 2012
Feb 21, 2012CApt 1 · § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF RODENTS RATS IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTFeb 27, 2012
Feb 21, 2012AApt 1 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTMay 26, 2012

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 24, 2026, 3:32 PM ET. BBL 2040260046.

Look up another building