Brooklyn · Block 6549 · Lot 1 · 11204

6001 Bay Parkway

4 floors · 90,877 sq ft · built 1960 · class W2 · owner of record: Rocklyn Ecclesiastical Corp.

13open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
61dto Annual boiler inspection (3 boilers)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 61 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (3 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-13 (Accepted). Agency page

Dec 31, 2026
in 61 days
1 of 3 without an accepted 2026 report yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 90,877 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 182 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 182 days
Annual filing
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 426 days
Next cycle year 2027
Energy audit and retro-commissioning (2029) Likely applies
Local Law 87 · Calendar year 2029
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 6549). Agency page

Dec 31, 2029
in 1157 days
Next due 2029

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Feb 26, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION, STAIRCASE "D" DOORS ON THE 1ST, 2ND AND 3RD FLOORS WERE NOT SELF-CLOSING. REMEDY: REPAIR AND/OR REPLACE.
#35722148Z
Apr 10, 2026
POP/IN-VIO
$0
Feb 26, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. AT THE TIME OF INSPECTION, THERE WAS NO ROOF EDGE PROTECTION(PARAPET/RAILINGS) ON ROOF AT EXPOSURES 2 AND 3. REMEDY: MAINTAIN EXTERIOR BUILDING WALL.
#35722149K
Apr 10, 2026
POP/IN-VIO
$0
DOB (2)
IssuedViolationStatus
Jun 16, 2026CONSTRUCTION
STRUCTURE RENDERED NON-COMPLIANT DUE TO PROPERTY BEING IN THE POTENTIAL DEBRIS COLLAPSE ZONE DUE TO LOOSE AND DISLODGED SIDING AT 2239 61 STREET.
#26-01590
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#21195
DOB VIOLATION - ACTIVE
DOB NOW Safety (9)
IssuedViolationStatus
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Aug 29, 2025Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
Active
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 12)
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 31, 2026, 12:27 PM ET. BBL 3065490001.