6 floors · 108 apartments · 124,174 sq ft · built 1936 · class D7 · owner of record: 600 West 218th Street Associates, L.L.C.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 46 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 62 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 124,174 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 167 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 167 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 290 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 411 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2250). Agency page | Dec 31, 2030 in 1507 days | Next due 2030 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-27 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 30, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED THAT PLYWOOD AND STUD ERECTED FAR FROM ELECTRIC STOVE HOWEVER FAILURE TO SUBMIT CERTIFICATE OF CORRECTION FOR VIOLATION #39180460P ISSUED ON 03-14-2026, FILE A CERTIFICATE OF CORR #39210117M | Jan 7, 2027 PENDING | $1,250 |
| Sep 1, 2026 | Construction CLASS - 2 B263 FAILURE TO COMPLY WITH THE COMMISSIONER ORDER TO FILE A CERT.OF CORRECTION WITH THE DEPT.OF BUILDINGS FOR VIOLATION #039153799K, FILE A CERTIFICATE OF CORRECTION; FILE A CERT,OF CORRECTION #39202531H | Nov 5, 2026 DEFAULT | $1,280 |
| Jul 16, 2025 | Plumbing CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. EXHAUST DISCHARGE MUST BE NO CLOSER THAN 10' FROM BUILDING OPENINGS AS PER MC 501.2 AND RS 13-1 SEC. 2-2.1.4. NOTED: KITCHEN EXHAUST VENT FOR GROUND FLR RE #39153799K | Sep 25, 2025 IN VIOLATION | $0 |
| Jul 16, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED: AT TIME OF INSPECTION - WOOD PLYWOOD & STUDS OBSERVED ERECTED AT KITCHEN STOVE AREA CREATING A FIRE HAZARD CONDITION., REPAIR AND/REPLACE #39153798Z | Dec 11, 2026 PENDING | $2,500 |
| Dec 2, 2024 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONERS ORDER TO FILE A CERT OF CORRECTION WITH DOB. NO CERT OF CORRECTION FILED FOR ECB VIO #39071572R ISSUED 10/06/2022 AND HEARING DATE PASSED. ISSUED AT AGG II DUE TO CONTINUED #39131742M | Mar 6, 2025 IN VIOLATION | $6,250 |
| Apr 15, 2024 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONERS ORDER TO FILE A CERT OF CORRECTION WITH DOB. NO CERT OF CORRECTION FILED FOR ECB VIO #39071572R ISSUED 10/06/2022 AND HEARING DATE PASSED. ISSUED AT AGG I DUE TO CONTINUED N #39111675N | Jun 20, 2024 IN VIOLATION | $3,125 |
| Dec 29, 2023 | Plumbing CLASS - 2 FAILURE TO MAINTAIN. BUILDING IN CODE COMPLIANT MANNER. EXHAUST DISCHARGE MUST BE NO CLOSER THAN 10 FEET FROM BUILDING OPENINGS AS PER MC 501.2 AND RS 13-1 SEC. 2-2.1.4. NOTED: AT EXPOSURE #2 EXHAUST DISCHARGE #39102455R | Mar 7, 2024 IN VIOLATION | $0 |
| Jun 29, 2023 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONERS ORDER TO FILE A CERT OF CORRECTION FOR ECB #39071572R. NOTED NO CERT OF CORRECTION FILED FOR ECB VIOLATION #39071572R ISSUED 10/06/2022 WITH HEARING DATE PASSED AND EXHAUST #39089410J | Sep 7, 2023 IN VIOLATION | $1,250 |
| Oct 6, 2022 | Plumbing CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. EXHAUST DISCHARGE MUST BE NO CLOSER THAN 10 FEET FROM BUILDING OPENINGS PER MC 501.2, MC 401.5.2. GROUND FLOOR RESTAURANT "INWOOD FARM" HAS KITCHEN EXHAUST SYS #39071572R | May 4, 2023 IN VIOLATION | $0 |
| Nov 6, 2020 | Construction CLASS - 2 OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY OR BUILDINGS DEPARTMENT RECORDS. EATING AND DRINKING ESTABLISHMENT WITH FULL BAR AND KITCHEN AND SEATING FOR APPROX 25 PERSONS LOCATED ON GROUN #39031668P | Jun 17, 2021 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 1, 1991 | ELEVATOR DEVICE #1P20389 #0252C01 | VIOLATION UNSERVED ECB-ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 17, 2025 | C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CANOPY OBSTRUCTING DROP LADDER TO FULLY EXTEND TO GROUND AT BUILDING FRONT AT FIRE ESCAPE | Jul 23, 2025 |
| Aug 10, 2023 | B | Apt 6D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6D, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION '' | Sep 14, 2023 |
| Aug 10, 2023 | B | Apt 1B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION '' | Sep 14, 2023 |
| Aug 10, 2023 | B | Apt 6P · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6P, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION '' | Sep 14, 2023 |
| Aug 10, 2023 | B | Apt 5N · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 14, 2023 |
| Aug 10, 2023 | B | Apt 3J · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3J, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION '' | Sep 14, 2023 |
| Aug 10, 2023 | B | Apt 1A · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION '' | Sep 14, 2023 |
| Aug 10, 2023 | B | Apt 6R · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6R, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION '' | Sep 14, 2023 |
| Aug 10, 2023 | B | Apt 6C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION '' | Sep 14, 2023 |
| Aug 10, 2023 | B | Apt LN · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT BSMT-APT LN, 2nd BSMT-APT FROM SOUTH AT WEST | Sep 14, 2023 |
| Aug 10, 2023 | B | Apt LO · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT BSMT-APT LO, 1st BSMT-APT FROM SOUTH AT WEST , SECTION ''600'', | Sep 14, 2023 |
| Aug 10, 2023 | B | Apt 1N · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1N, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 14, 2023 |
| Aug 10, 2023 | B | Apt 4B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION '' | Sep 14, 2023 |
| Aug 10, 2023 | B | Apt 4E · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION '' | Sep 14, 2023 |
| Aug 10, 2023 | B | Apt 3N · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3N, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION '' | Sep 14, 2023 |
| Aug 10, 2023 | B | Apt 2N · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2N, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 14, 2023 |
| Aug 10, 2023 | B | Apt 5J · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5J, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION '' | Sep 14, 2023 |
| Aug 10, 2023 | B | Apt 5A · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION '' | Sep 14, 2023 |
| Aug 10, 2023 | B | Apt 3H · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION '' | Sep 14, 2023 |
| Aug 3, 2023 | C | § 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Aug 7, 2023 |
| Aug 3, 2023 | C | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Aug 7, 2023 |
| Oct 12, 2021 | C | Apt 2M · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2M, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 7, 2021 |
| Aug 23, 2021 | C | Apt 2O · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 2O, 2nd STORY, 1st APARTM | Sep 16, 2021 |
| Aug 23, 2021 | B | Apt 6E · § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6E, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 27, 2021 |
| Aug 23, 2021 | B | Apt 3J · § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3J, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Sep 27, 2021 |
| Aug 23, 2021 | B | Apt 1N · § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1N, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 27, 2021 |
| Aug 23, 2021 | B | Apt 2J · § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2J, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Sep 27, 2021 |
| Aug 23, 2021 | B | Apt 6J · § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6J, 6th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Sep 27, 2021 |
| Aug 12, 2021 | B | Apt LO · § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT BSMT-APT LO, 1st BSMT-APT FROM WEST AT NORTH | Sep 16, 2021 |
| Aug 12, 2021 | B | Apt LN · § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT BSMT-APT LN, 2nd BSMT-APT FROM SOUTH AT WEST | Sep 16, 2021 |
| Aug 10, 2021 | B | Apt 3H · § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 14, 2021 |
| Aug 10, 2021 | B | Apt 4K · § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4K, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Sep 14, 2021 |
| Aug 10, 2021 | B | Apt 4J · § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4J, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Sep 14, 2021 |
| Aug 10, 2021 | B | Apt 4E · § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 14, 2021 |
| Aug 10, 2021 | B | Apt 6B · § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST | Sep 14, 2021 |
| Aug 10, 2021 | B | Apt 2B · § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Sep 14, 2021 |
| Jul 6, 2021 | B | Apt 5N · § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 10, 2021 |
| Jul 2, 2021 | B | Apt 6N · § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6N, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 6, 2021 |
| Jul 2, 2021 | B | Apt 2M · § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2M, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 6, 2021 |
| Jul 2, 2021 | B | Apt 6P · § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6P, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 6, 2021 |
| Jul 2, 2021 | B | Apt 2N · § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2N, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 6, 2021 |
| Jul 2, 2021 | B | Apt 2P · § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2P, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 6, 2021 |
| Jul 2, 2021 | B | Apt 5L · § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5L, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Aug 6, 2021 |
| Jul 2, 2021 | B | Apt 3N · § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3N, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 6, 2021 |
| Jul 2, 2021 | B | Apt 3O · § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3O, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 6, 2021 |
| Jun 25, 2021 | C | Apt GR · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Jun 29, 2021 |
| May 2, 2018 | B | Apt 5K · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... ON THE CEILING IN THE BATHROOM LOCATED AT APT 5K, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jun 6, 2018 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 30, 2026 | ECB | Construction: AT TIME OF INSPECTION OBSERVED THAT PLYWOOD AND STUD ERECTED FAR FROM ELECTRIC STOVE HOWEVER FAILURE TO SUBMIT CERTIFICATE OF CORRECTION FOR VIOLATION #39180460P ISSUED ON 03-14-2026, FILE A CERTIFICATE OF CORR | Open |
| Sep 1, 2026 | ECB | Construction: B263 FAILURE TO COMPLY WITH THE COMMISSIONER ORDER TO FILE A CERT.OF CORRECTION WITH THE DEPT.OF BUILDINGS FOR VIOLATION #039153799K, FILE A CERTIFICATE OF CORRECTION; FILE A CERT,OF CORRECTION | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 1:07 AM ET. BBL 1022500058.