Bronx · Block 2546 · Lot 19 · 10454

600 Bruckner Boulevard

2 floors · 31,700 sq ft · built 1924 · class E9 · owner of record: Bruckner Boulevard Associates

16open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
185dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 64 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 31,700 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 185 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 185 days
Annual filing
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 795 days
Next cycle year 2028

Open violations

ECB / OATH (0)

None open.

DOB (6)
IssuedViolationStatus
Dec 1, 2024FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2400615
DOB VIOLATION - ACTIVE
Dec 1, 2022FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2200617
DOB VIOLATION - ACTIVE
Dec 1, 2021FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2101370
DOB VIOLATION - ACTIVE
Nov 2, 2021FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00256
DOB VIOLATION - ACTIVE
Jun 9, 1994LOCAL LAW 62/91 - BOILERS

#03300
DOB VIOLATION - ACTIVE
May 17, 1993LOCAL LAW 62/91 - BOILERS

#02873
DOB VIOLATION - ACTIVE
DOB NOW Safety (10)
IssuedViolationStatus
Jun 22, 2026Benchmarking - LL84 FTF-EN-BENCH
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Active
Mar 6, 2026Benchmarking - LL84 FTF-EN-BENCH
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Active
Dec 3, 2025Benchmarking - LL84 FTF-EN-BENCH
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Active
Sep 26, 2025Benchmarking - LL84 FTF-EN-BENCH
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Active
Dec 1, 2024Energy Grade - LL33 FTP-EN-EGRDEA
Active
Dec 1, 2022Energy Grade - LL33 FTP-EN-EGRDEA
Active
Dec 1, 2021Energy Grade - LL33 FTP-EN-EGRDEA
Active
Nov 2, 2021Benchmarking - LL84 FTF-EN-BENCH
Active
Jun 9, 1994Boiler LL6291
Active
May 17, 1993Boiler LL6291
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 28, 2026, 9:59 AM ET. BBL 2025460019.

Look up another building