7 floors · 78,000 sq ft · built 1912 · class E1 · owner of record: 72 West Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 78,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 187 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 187 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 797 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2035) Likely applies Local Law 87 · Calendar year 2035 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2565). Agency page | Dec 31, 2035 in 3353 days | Next due 2035 |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $425,000 in late-filing or failure-to-file penalties. Agency page | On file | Cycle 10 filing on record: SAFE (2025-11-20) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 28, 2025 | Construction CLASS - 2 FAILURE TO SIGN OFF PERMITTED JOB AS REQUIRED BY DEPARTMENT OF BUILDING. AT TIME OF INSPECTION, JOBS #301889071 NOT SIGNED OFF. PERMITS #301889071-EW-MH EXPIRED ON 04/01/2007.; 28-116.4, COMPLY WITH CODE #39143154Y | Jun 4, 2025 IN VIOLATION | $0 |
| Dec 2, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#909610.REM:SUBMIT ACCEPTABLE REQUIRED T #37023936J | Sep 18, 2023 IN VIOLATION | $0 |
| May 19, 2012 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG WALLS, DEFECT NOTED AT EXP 1 MISSING BRICK & LOOSE BRICK AROUND GARAGE DOORS. 2 X 4 SECTION OF BRICK MISSING AT FLRS 3-7 THROUGHOUT EXP 1,2 AND 3, UPPER WINDOWS WERE BOARDED UP. MISSING #34955226X | Nov 5, 2012 IN VIOLATION | $0 |
| Dec 10, 2010 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG EXTERIOR WALL. DEFECT NOTED: AT EXP #4 WALL PORTION OF MASONRY WALLS BREAKING/BROKEN OFF FALLEN ONTO PUBLIC PLAYGROUND (AMERICAN PLAYGROUND) BROKEN & LOOSE MASONRY MATERIALS AT #34881375K | Jan 31, 2011 DEFAULT | $0 |
| Apr 13, 2005 | Construction Hazardous FAILURE TO MAINTAIN EXTERIOR BUILDING WALL:N/E DEFECT IS:WALL & FLOOR WINDOW OPENING ARE CRACKED BROKEN DEFECTIVE & OUT OF PLUMB AT VARIOUS LOCATIONS BY PARK PLAYGROUND AREA.REMEDY:SUBMIT ENGINEERS LETTER OF ST #34473954M | Oct 10, 2005 IN VIOLATION | $0 |
| Mar 26, 2005 | Construction Hazardous FAILURE TO MAINTAIN EXTERIOR BUILDING WALL.NOTE:AT VARIOUS LOCATIONS,IT WAS OBSERVED THAT THE BRICKWORK HAS VERTICAL CRACKS AND THAT THE CONCRETE WORK AT THE ENTRANCE HAS BROKEN AWAY.SEVERAL BRICKS ARE ALSO MIS #34468810R | Aug 8, 2005 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #01110 | DOB VIOLATION - ACTIVE |
| Sep 8, 2021 | CONSTRUCTION FTM BLDG EXTERIOR WALLS/FACADE AND APPURTENANCES. AT TIME OF INSP VIEW AT EXP1 EAST ELEVATION CRACK LINTELS, DAMAGED STONE AT ENTRANCE CANOPY ABD SPALLING. EXP2 DAMAGED AT WINDOW LINTELS AND SPALLING EXP 4 DAMAGED LINTELS EXPOSIRE 3 DAMAGE LINTELS. REMEDY: REPAIR DEFECTIVE CONDITIONS #LL0101NS | DOB VIOLATION - ACTIVE |
| Aug 26, 2021 | CONSTRUCTION AT TIME OF INSPECTION OBSERVED EXISTING STEEL WATER TOWER WITH CROSS BRACING HAS BEEN REMOVED APPROXIMATELY 25" DIAMETER X 20'LONG ALONG WITH CORROTIONAT ALL AREAS #CER04DE | DOB VIOLATION - ACTIVE |
| Aug 13, 2021 | CONSTRUCTION FAILURE TO COMPLY WITH COMMISSIONER'S ORDER AC 28-201.1. BUILDING OWNER-FAILURE TO COMPLY WITH COMMISSIONER'S ORDER 092719CLL0101PR ISSUED ON 09/27/2019. AS OF 08/13/2021 OWNER HAS NOT COMPLIED WITH IMMEDIATE CURE ORDER. REMEDY: IMMED COMPLY WITH CODE AND COMMISSIONER'S ORDERS #LL0114VG | DOB VIOLATION - ACTIVE |
| Sep 27, 2019 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING EXTERIOR WALLS/FACADES AND APPURTENANCES EXPOSURE 1. WEST ELEVATION: PARAPET WALL-SPALLED STONE REMEDY:MAINTAIN BUILDING EXTERIOR WALLS/FACADE AND APPURTENANCES REPAIR,MAKE SAFE,PROVIDE ADEQUATE SAFETY MEAURES AS PER 1RCNY 103-04 #LL0101PR | DOB VIOLATION - ACTIVE |
| Jan 31, 2013 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012 #01266 | DOB VIOLATION - ACTIVE |
| May 3, 2012 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #02065 | DOB VIOLATION - ACTIVE |
| Jan 1, 2012 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #01843 | DOB VIOLATION - ACTIVE |
| Mar 9, 2011 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00414 | DOB VIOLATION - ACTIVE |
| Nov 30, 2007 | LOCAL LAW 11/98 - FACADE #NRF45702 | DOB VIOLATION - ACTIVE |
| Jun 25, 1998 | IMMEDIATE EMERGENCY #149/97A | DOB VIOLATION - ACTIVE |
| Dec 29, 1997 | CONSTRUCTION WORK WITHOUT A PERMIT WORK NOTED: SIDEWALLK SHED ERECTED AT EAST SIDE OF BUILDING ADJACENT TO PLAY GROUND (SHED IS ENTIRE LENGTH TOPPED BY BARBWIRE) REMEDY: OBTAIN ALL NECESSARY PERMITS. REMOVE BARBWIRE #01G01 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Jun 12, 1997 | IMMEDIATE EMERGENCY #149/97 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #24766 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Jan 31, 2013 | Facades FISPNRF FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012 | Active |
| May 3, 2012 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Jan 1, 2012 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Mar 9, 2011 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 30, 2007 | Facades LL1198 CYCLE 6 NO REPORT FILED | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 11:17 PM ET. BBL 3025650001.