1 floors · 6,400 sq ft · built 1930 · class E9 · owner of record: 61st Street Land And Buildings Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 60 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1156 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 5, 2026 | Construction CLASS - 1 FACADE AT THREE EXPOSURES 60ST, 38AVE, 61ST ALL IN DISREPAIR. SPALLING/FLAKING MASONRY PRESENT, ALONG WITH MISSING MORTAR, STAIR AND STRESS CRACKS. CORNERS OF 61ST AND 38 AVE HAS SECTION OF WALL DETACHED FROM S #39199348P | Dec 8, 2026 PENDING | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION #00648 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION #01801 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION #03124 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION #04267 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Aug 5, 2026 | DOB | IMMEDIATE EMERGENCY: REMEDY; INSTALL CONSTRUCTION FENCE | Closed |
| Aug 5, 2026 | ECB | Construction: FACADE AT THREE EXPOSURES 60ST, 38AVE, 61ST ALL IN DISREPAIR. SPALLING/FLAKING MASONRY PRESENT, ALONG WITH MISSING MORTAR, STAIR AND STRESS CRACKS. CORNERS OF 61ST AND 38 AVE HAS SECTION OF WALL DETACHED FROM S | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 1, 2026, 1:49 AM ET. BBL 4012150011.