6 floors · 48 apartments · 46,101 sq ft · built 1923 · class D7 · owner of record: 6015 Woodside Ave
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 46 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 62 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 46,101 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 167 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 167 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 290 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1142 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-08 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 6, 2021 | Construction CLASS - 2 TEMPORARY CONSTRUCTION EQUIPMENT ONSITE EXPIRED PERMIT.AT TIME OF INSPECTION ON AN INACTIVE 6 STORY ALT CONSTRUCTION OF FACADE RESTORATION WHERE AN INCIDENT OF A MTA BUS DRIVING INTO THE SIDEWALK SHED AT 60-15 #35552825H | Aug 10, 2021 IN VIOLATION | $0 |
| Mar 6, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN SIDEWALK SHED AS PER CODE AT TIME OF INSPECTION AN INACTIVE 16 STORY ALT CONSTRUCTION AT FACADE RESTORATION NOTICE THAT THE CONTRACTOR FAILED TO BUILD/MAINTAIN THE SIDEWALK SHED ON SITE AS P #35552826J | Aug 10, 2021 IN VIOLATION | $0 |
| Mar 19, 2020 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#39015614J ISSUED ON 01/11/20 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. WORK AFTER HOURS W/O AHV PERMIT. REMEDY: COMPLY W/C #35518577Z | Jun 2, 2020 IN VIOLATION | $0 |
| Mar 5, 2020 | Construction CLASS - 2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT-NOTE:AT THE TIME OF MY INSPECTION I OBSERVED A SIDEWALK SHED ERECTED AT EXPOSURE 1 AND 4.UPON REVIEW OF THE DEPARTMENT RECORDS IT REVEALS THAT THE SIDEWAL #35480626P | Nov 17, 2020 IN VIOLATION | $0 |
| Mar 5, 2020 | Construction CLASS - 2 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS.NOTE:AT THE TIME OF MY INSPECTION,I OBSERVED SIDEWALK SHED ERECTED AT EXPOSURE ONE AND 4.I ALSO OBSERVED THAT THE SHED AT EXPOSURE 4 WAS LEANING WITH THE #35480627R | Dec 1, 2020 IN VIOLATION | $0 |
| Jan 11, 2020 | Construction CLASS - 1 OBSERVED THE INSTALLATION OF A SIDEWALK SHED WITHOUT AN AFTER HOUR VARIANCE., OBTAIN AFTER HOURS VARIANCE; OBTAIN AN AFTER HOUR VARIANCE. #39015614J | Apr 7, 2020 IN VIOLATION | $0 |
| Apr 6, 2015 | Construction CLASS - 2 WORK DOES NOT CONFORM TO APPROVED CONST DOCS &/OR APPROVED AMENDMENTS.ON 04/5/15 DURING PHYSICAL INSO I OBSERVED 1 NEW SHOWER BODY,1 NEW LEAD BEND,HOT & COLS WATER LINES,GAS PIPING & NEW GAS VALVE INSTALLED IN #35115741P | Aug 11, 2015 WRITTEN OFF | $0 |
| Apr 6, 2015 | Construction CLASS - 2 WORK DOES NOT CONFORM TO APPROVED CONST DOCS &/OR APPROVED AMENDMENTS.ON 4/6/15 DURING PHSYICAL INSP I OBSERVED/NEW SHOWER BODY NEW HOT & COLD PIPING & VALVES NEW GAS VALVE & PIPING INSTALLED IN APT #4A ON THE #35115743Z | Aug 11, 2015 WRITTEN OFF | $0 |
| Oct 12, 2010 | Construction CLASS - 2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENTS. INSP DWG 02-17-10 PC ALT 410226330, EXP 08-04-09 NOTE:@ TIME OF INSP FOUND;ELEVATION PLAN PG 2OF12 FOR STRUCTURAL WORK APPLICATI #34885552K | Dec 7, 2010 STIPULATION/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #12391 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #05105 | DOB VIOLATION - ACTIVE |
| Nov 14, 2016 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST #07072 | DOB VIOLATION - ACTIVE |
| May 28, 2015 | CONSTRUCTION #C0205DM | DOB VIOLATION - ACTIVE |
| May 16, 2015 | CONSTRUCTION #C0206GR | DOB VIOLATION - ACTIVE |
| Feb 5, 1990 | PUBLIC ASSEMBLY #02AP01 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 29, 2026 | B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL, 1st STORY | Dec 3, 2026 |
| Oct 29, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1st STORY | Feb 1, 2027 |
| Oct 29, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 1st STORY | Dec 3, 2026 |
| Mar 26, 2026 | A | §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMA | Jun 29, 2026 |
| Dec 13, 2018 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY | Mar 18, 2019 |
| Dec 13, 2018 | B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR FIRE RETARDANT MATERIAL AT CEILING 12 SQ FT AT PUBLIC HALL, 1st STORY | Jan 17, 2019 |
| Dec 13, 2018 | B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL, 1st STORY | Jan 17, 2019 |
| Dec 13, 2018 | A | § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING AT PUBLIC HALL, 1st STORY | Mar 18, 2019 |
| Dec 13, 2018 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Mar 18, 2019 |
| Dec 13, 2018 | A | § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY | Mar 18, 2019 |
| Dec 13, 2018 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR SECURE TO WALL AT PUBLIC HALL, 1st STORY | Mar 18, 2019 |
| Dec 13, 2018 | A | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CHILD SAFETY COVERS/CAPS AT ELECTRICAL OUTLET (FOUR TOTAL) AT PUBLIC HALL, 1st STORY | Mar 18, 2019 |
| Jun 12, 2008 | B | Apt 2D · SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE GROUT AROUND BATHTUB 2 STY APT 2D BATHROOM. LOCATED AT APT 2D | Jul 17, 2008 |
| Jun 12, 2008 | B | Apt 5J · SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INOPERABLE BATHTUB STOPPER 5 STY APT 5J BATHROOM. LOCATED AT APT 5J | Jul 17, 2008 |
| Jun 12, 2008 | B | Apt 6C · D26-10.01 ADM CODE PROVIDE WINDOW STOPS ALL WINDOWS 6 STY APT 6C. LOCATED AT APT 6C | Jul 17, 2008 |
| Jun 12, 2008 | A | SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED CEILING CELLAR EAST. | Sep 15, 2008 |
| Jan 8, 2008 | B | Apt 4B · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 12, 2008 |
| Jan 8, 2008 | B | Apt 4B · SECTION 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 12, 2008 |
| Jan 8, 2008 | B | Apt 4B · SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CONCEALED CEILING LEAK IN THE 1st ROOM FROM EAST LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 12, 2008 |
| Jan 8, 2008 | B | Apt 4B · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING AT BATHROOM ENTRANCE IN THE 1st PRIVATE HALLWAY FROM EAST LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 12, 2008 |
| Jan 8, 2008 | A | Apt 4B · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 12, 2008 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL, 1st STORY | Open |
| Oct 29, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1st STORY | Open |
| Oct 29, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 1st STORY | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 8:46 AM ET. BBL 4012930001.