5 floors · 14 apartments · 9,064 sq ft · built 1892 · class C5 · owner of record: 6 West 75th Street, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 58 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 74 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 302 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1154 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-04 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 11, 2020 | Unknown CLASS - 2 ONGOING CONSTRUCTION ACTIVITY CONTRARY TO GOVERNOR'S EXECUTIVE ORDER #202.6,202.8,202.11,202.13 & GUIDANCE PUBLISHED BY THE EMPIRE STATE DEVELOPMENT CORPORATION PURSUANT TO SAME.NOTED:AT TIME OF INSPECTION I #35487109Z | Jun 17, 2021 DEFAULT | $5,000 |
| Feb 18, 2020 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING WALLS OR APPURTENANCES. AT TIME OF INSPECTION OBSERVED LARGE SECTIONS OF PLASTER SEPARATING FROM BUILDING AND FALLING ONTO ADJACENT PROPERTIES SERVICE ENTRANCE AT EXPOSURE #2. ALSO #39017749X | Jan 5, 2023 IN VIOLATION | $2,500 |
| Sep 13, 2019 | Construction CLASS - 1 FAILURE TO MAINTAIN FIRE STOPPING. NOTE: DURING TIME OF INSPECTION, OBSERVED FIRE STOPPING REMOVED WITHOUT BEING REPLACED AND NO FIREGUARD ON-SITE FOR MISSING FIRE STOPPING IN BATHROOM CEILING OF APARTMENT 4A #39009501M | Jan 30, 2020 IN VIOLATION | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Feb 27, 2020 | CONSTRUCTION FTM:AT EXP1,FACE BRICK WAS CRACK@LINTEL ENDS&BULG OUT ABOVE LINTELS.AT EXP1/2 CRNR,VERT CRACKS@VARIOUS PORTIONS OF HEIGHT.AT EXP2/3 CRNR WAS MORE VERTICAL CRACKS.STUCCO@EXP2&3 WAS LOOSE,DELAMINATING&FALLING INTO ADJ YARDS.OWNER TO RETAIN NYS-LIC PE TO EVALU&DEVLP REPR PLNS FOR ALL EXTR'WALLS.FILE BY #FEU10701IK | DOB VIOLATION - ACTIVE |
| Feb 27, 2020 | CONSTRUCTION EMERG WRK:OWNERS PERSUANT TO DOB# 022720FEU10702IK STEEL LINTELS @EXP1 SEVERE DETERIOR CAUSED FACE BRICK TO PROBE OUT CRCK&SPALL.BRICK HEADER COURSES TYING FACE BRICK TO BACK UP WALL INCONSISTENT&NOT ALWYS PROPER ATTCH.NO WTR PROOF MEMBRN.OWNR RETN NYS LIC PE&CONT IMMD SHORE LINTELS &STABL EXP1 FACD #FEU10702IK | DOB VIOLATION - ACTIVE |
| Feb 18, 2020 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING WALLS OR APPURTENANCES. AT TIME OF INSPECTION OBSERVED LARGE SECTIONS OF PLASTER SEPARATING FROM BUILDING AND FALLING ONTO ADJACENT PROPERTIES SERVICE ENTRANCE AT EXPOSURE #2. ALSO AT EXP #1 OBSERVED WHITE FACADE BRICK IS UNSUPPORTED ABOVE MULTIPLE WINDOWS WITH CRACKING #20-00316 | DOB VIOLATION - ACTIVE |
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 13, 2022 | B | Apt 5A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 15205241 ISSUED 14-JUN-22 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017 | Nov 17, 2022 |
| Jun 16, 2022 | B | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE FIRE EXIT DOOR AT 1st PUBLIC HALL BULKHEAD FROM NORTH | Jul 21, 2022 |
| Jun 16, 2022 | B | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL WIRES AT EAST WALL AT 1st PUBLIC HALL BULKHEAD FROM NORTH | Jul 21, 2022 |
| Jun 15, 2022 | C | Apt 5A · § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ... IN THE ENTRANCE LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 11, 2022 |
| Jun 15, 2022 | B | Apt 5A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE FOYER LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 20, 2022 |
| Jun 15, 2022 | B | Apt 5A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 20, 2022 |
| Jun 15, 2022 | B | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING COVERS OR CAPS AT ELECTRICAL OUTLET AT PUBLIC HALL | Jul 20, 2022 |
| Nov 12, 2019 | C | Apt 5A · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 10, 2019 |
| Nov 12, 2019 | C | Apt 5A · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 10, 2019 |
| Sep 16, 2019 | C | Apt 5B · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING FIRE STOPPING MATERIALS AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST | Sep 24, 2019 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 3, 2026, 11:37 PM ET. BBL 1011270039.