6 floors · 13 apartments · 8,558 sq ft · built 2025 · class D6 · owner of record: 6 Havemeyer Street Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 68 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 84 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 799 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 19, 2026 | Construction CLASS - 1 UPON INSPECTION OF A ACTIVE 6 STORY NB CONSTRUCTION SITE I OBSERVED INADEQUATE AND HAZARDOUS HOUSEKEEPING PRACTICES ON ALL FLOOR. LARGE PILES OF ACCUMULATED COMBUSTIBLE DEBRIS AND MATERIAL THROUGHOUT BUILDING #39560799Z | Jan 6, 2027 PENDING | $2,500 |
| Oct 19, 2026 | Construction CLASS - 1 PIPE SCAFFOLD IN USE INSTALLED AT EXPOS 1,2 & 3 CONTRARY TO DRAWINGS. NO INSTALL DETAILS FOR SF INSTALLED AT EXPOS 3. USE OF 2FT FRAMES AT EXPOS 3 NOT DETAILED. NETTING DOES NOT FULLY ENCLOSE THE SF AT EXPOS 1 #39560790M | Jan 6, 2027 PENDING | $2,500 |
| Oct 19, 2026 | Unknown CLASS - 1 UPON INSPECTION OF AN ACTIVE 6 STORY NB CONSTRUCTION SITE I OBSERVED A WINDOW ON THE ADJOINING PROPERTY AT EXPOS 3. THE WINDOW WAS UNPROTECTED WITH ON GOING CONSTRUCTION WORK AND EQUIPMENT INSTALLED IN VERY CLO #39560798R | Jan 6, 2027 PENDING | $5,000 |
| Oct 19, 2026 | Site Safety CLASS - 1 UPON INSPECTION OF AN ACTIVE 6 STORY NB I OBSERVED EMBEDDED SAFETY STRAPS IS USE INSTALLED ON ALL FLOORS. UPON REQUEST TO SEE THE INSTALLATION AND MAINTENANCE LOG BOOK (DOCUMENTS TO BE KEPT AND MAINTAINED IN SI #39560796N | Jan 6, 2027 PENDING | $2,500 |
| Oct 19, 2026 | Construction CLASS - 1 UPON INSPECTION OF AN ACTIVE 6 STORY NB CONSTRUCTION SITE I OBSERVED 3 LOCATIONS (6TH FLOOR & ON 4TH & 2ND FLOOR BALCONIES) WITH A MISSING OR INADEQUATE GUARDRAILS SYSTEM PROVIDED. NOT INSTALLING A GUARDRAIL SY #39560803M | Jan 6, 2027 PENDING | $5,000 |
| Oct 19, 2026 | Construction CLASS - 2 UPON INSPECTION I OBSERVED A FENCE INSTALLED AT EXPOS 1 WITH AN INADEQUATE PROJECT INFO PANEL INSTALLED. MISSING CONTENT REQUIRED BY 3301.9.1.1 PROJECT INFORMATION PANEL CONTENT. NO CONTACT NUMBERS PROVIDED FOR #39560800R | Jan 6, 2027 PENDING | $1,250 |
| Sep 23, 2026 | Construction CLASS - 2 NO EN DRAWING APPROVED FROM DOB PROVIDED ON THE JOB SITE AT THE TIME OF INSPECTION., MAINTAIN/DISPLAY REQUIRED DOCUMENTS; PLEASE CALL FOR REINSPECTION TO ENERGYCODEINSPECTIONS@BUILDINGS.NYC.GOV #39205228Z | Dec 2, 2026 PENDING | $1,250 |
| Aug 21, 2025 | Construction CLASS - 2 I OBSERVED THAT THE CONSTRUCTION FENCE PANELS AT 1 NOT PROPERLY MAINTAINED PURSUANT TO SUBSECTION ACCORDING TO BC 3307.7. FENCE PANELS COVERED WITH MULTIPLY GRATIFY POSTER ADVERTISING, UNRELATED TO THE JOBSITE #39543933X | Jan 15, 2027 | $1,000 |
| Apr 1, 2025 | Construction CLASS - 1 WORK WITHOUT A PERMIT, AT TIME OF INSPECTION, OBSERVED AT SITE, AN ONGOING 6-STORY NEW BUILDING, INCLUDING CONCRETE STRUCTURAL FRAME AND MISCELLANEOUS WORK. THE ONGOING CONSTRUCTION WORK (NEW BUILDING) HAS REAC #39143431N | Feb 1, 2027 | $2,500 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 19, 2026 | ECB | Construction: UPON INSPECTION OF A ACTIVE 6 STORY NB CONSTRUCTION SITE I OBSERVED INADEQUATE AND HAZARDOUS HOUSEKEEPING PRACTICES ON ALL FLOOR. LARGE PILES OF ACCUMULATED COMBUSTIBLE DEBRIS AND MATERIAL THROUGHOUT BUILDING | Open |
| Oct 19, 2026 | ECB | Construction: PIPE SCAFFOLD IN USE INSTALLED AT EXPOS 1,2 & 3 CONTRARY TO DRAWINGS. NO INSTALL DETAILS FOR SF INSTALLED AT EXPOS 3. USE OF 2FT FRAMES AT EXPOS 3 NOT DETAILED. NETTING DOES NOT FULLY ENCLOSE THE SF AT EXPOS 1 | Open |
| Oct 19, 2026 | ECB | Unknown: UPON INSPECTION OF AN ACTIVE 6 STORY NB CONSTRUCTION SITE I OBSERVED A WINDOW ON THE ADJOINING PROPERTY AT EXPOS 3. THE WINDOW WAS UNPROTECTED WITH ON GOING CONSTRUCTION WORK AND EQUIPMENT INSTALLED IN VERY CLO | Open |
| Oct 19, 2026 | ECB | Site Safety: UPON INSPECTION OF AN ACTIVE 6 STORY NB I OBSERVED EMBEDDED SAFETY STRAPS IS USE INSTALLED ON ALL FLOORS. UPON REQUEST TO SEE THE INSTALLATION AND MAINTENANCE LOG BOOK (DOCUMENTS TO BE KEPT AND MAINTAINED IN SI | Open |
| Oct 19, 2026 | ECB | Construction: UPON INSPECTION OF AN ACTIVE 6 STORY NB CONSTRUCTION SITE I OBSERVED 3 LOCATIONS (6TH FLOOR & ON 4TH & 2ND FLOOR BALCONIES) WITH A MISSING OR INADEQUATE GUARDRAILS SYSTEM PROVIDED. NOT INSTALLING A GUARDRAIL SY | Open |
| Oct 19, 2026 | ECB | Construction: UPON INSPECTION I OBSERVED A FENCE INSTALLED AT EXPOS 1 WITH AN INADEQUATE PROJECT INFO PANEL INSTALLED. MISSING CONTENT REQUIRED BY 3301.9.1.1 PROJECT INFORMATION PANEL CONTENT. NO CONTACT NUMBERS PROVIDED FOR | Open |
| Sep 23, 2026 | ECB | Construction: NO EN DRAWING APPROVED FROM DOB PROVIDED ON THE JOB SITE AT THE TIME OF INSPECTION., MAINTAIN/DISPLAY REQUIRED DOCUMENTS; PLEASE CALL FOR REINSPECTION TO ENERGYCODEINSPECTIONS@BUILDINGS.NYC.GOV | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 3:21 PM ET. BBL 3023140022.