Bronx · Block 5933 · Lot 230 · 10471

5961 Palisade Avenue

8 floors · 137 apartments · 125,976 sq ft · built 1980 · class D9 · owner of record: Hebrw Home Hous Dev

33open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 50 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 50 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 50 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 66 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 125,976 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 171 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 171 days
Annual filing
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $203,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2029
in 833 days
Filing window not open yet
Energy audit and retro-commissioning (2033) Likely applies
Local Law 87 · Calendar year 2033
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5933). Agency page

Dec 31, 2033
in 2607 days
Next due 2033
Annual boiler inspection (5 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-27 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
May 22, 2013Construction CLASS - 2
ALTERED/CHANGED BLDG W/O A VALID C/O. NOTED: UPON INSPECTION TCO 200759795T002 HAS EXPD ON 9.19.11. REMEDY: OBTAIN VALID C/O.
#35015256N
Jul 19, 2013
STIPULATION/IN-VIO
$0
DOB (10)
IssuedViolationStatus
Aug 3, 2024FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00077
DOB VIOLATION - ACTIVE
May 3, 2024FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00388
DOB VIOLATION - ACTIVE
Feb 23, 2024FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00028
DOB VIOLATION - ACTIVE
Nov 3, 2023FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00042
DOB VIOLATION - ACTIVE
Aug 3, 2023FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00065
DOB VIOLATION - ACTIVE
May 3, 2023FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00295
DOB VIOLATION - ACTIVE
Dec 1, 2022FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2200995
DOB VIOLATION - ACTIVE
May 20, 2009CONSTRUCTION
WORK WITH OUT A PERMIT AT THE REAR OF THE NURSING HOME FACING THE MTA RAILROAD THERE WAS A LARGE AMOUNT OF SOIL INSTALLED TO SUPPORT THE EXI STING EARTH SLOPE APPROXIMTELY 100 LINEAR FT WIDE 75 FT HIGH AND AT AN ANGLE OF APPROXIMATELY 50-60 DEGREES REMEDY: OBTAIN PERMIT ABOUT ALL NECESARY FILINGS CA
#ID09MG
DOB VIOLATION - ACTIVE
May 20, 2009CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER THE REAR OF TH E PROPERTY FACING THE RIVER IS FAIRLY NEW & IS APPROXIMATELY 75FT ABOV E THE RAILROAD TRACKS AND WITH ANANGLE OR REPOSE APPROXIMATELY 55 TO 6 0 DEGRESS AND THERE IS SOME SPIDER CRACKING IN THE EARTH MAKING THE ST RUCTURAL REMEDY:
#ID04MG
DOB VIOLATION - ACTIVE
May 18, 2009CONSTRUCTION

#0801AS
DOB VIOLATION - ACTIVE
DOB NOW Safety (16)
IssuedViolationStatus
Sep 25, 2026Benchmarking - LL84 DQ-EN-BENCH
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Active
Feb 28, 2025Benchmarking - LL84 DQ-EN-BENCH
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Active
Dec 2, 2024Benchmarking - LL84 DQ-EN-BENCH
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Active
Aug 3, 2024Benchmarking - LL84 FTF-EN-BENCH
Active
May 3, 2024Benchmarking - LL84 FTF-EN-BENCH
Active
Feb 23, 2024Benchmarking - LL84 FTF-EN-BENCH
Active
Nov 3, 2023Benchmarking - LL84 FTF-EN-BENCH
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Aug 3, 2023Benchmarking - LL84 FTF-EN-BENCH
Active
May 3, 2023Benchmarking - LL84 FTF-EN-BENCH
Active
Dec 1, 2022Energy Grade - LL33 FTP-EN-EGRDEA
Active
Apr 30, 2019Facades FISPNRF
FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019
Active
HPD (6) · C 0 · B 0 · A 6
IssuedClassViolationCorrect by
Apr 30, 2026A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Aug 3, 2026
Jun 5, 2025A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Sep 8, 2025
Apr 3, 2024A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Jul 7, 2024
Mar 17, 2023A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Jun 20, 2023
Feb 18, 2022A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.May 24, 2022
Apr 5, 2021A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Jul 9, 2021

Issued in the last 120 days

DateSourceWhatNow
Sep 25, 2026DOB SafetyBenchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 11, 2026, 4:58 PM ET. BBL 2059330230.

Look up another building