6 floors · 12 apartments · 9,000 sq ft · built 2020 · class C1 · owner of record: Metropolitan Units Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 64 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 80 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 308 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 795 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 8, 2026 | Construction CLASS - 1 WORK WITHOUT A PERMIT: AT THE TIME OF INSPECTION, OBSERVED AT UNIT 6A AND 6B MEZZANINE. AREAS IDENTIFIED ON NB PLANS AS 'OPEN TO BELOW" HAVE BEEN INFILLED IN BOTH UNIT CREATING ADDITIONAL SQUARE FOOTAGE FOR ADD #39207512P | Dec 16, 2026 PENDING | $2,500 |
| Mar 23, 2022 | Construction CLASS - 2 FAIL TO INSTITUTE&MAINTAIN SAFETY MEASURE DURING CONST OP.NOTE:ATO MY INSP OF 6STYB ACTIVE CONST SITE.I OBSERVED STYROFOAM PARTICLES ON SW,YD&SUPPORTED SCF.FLYING AROUND EVERYWHERE WHICH CREATE UNSAFE&HAZARDOUS #35646177X | Mar 17, 2023 IN VIOLATION | $5,000 |
| Dec 16, 2021 | Construction CLASS - 1 BC3314.1 SUPPORTED SCF NOT MAINTAINED OR ERECTED PER CODE.ATO MY INSP ON 6STYNB I OBSERVED ACTIVE SITE W/COMPETENT PERSON PRESENT UPON INSP WAS FOUND SUPPORT SCF HAS BEEN ERECTED ON EXP1,4-UP TO 5FL LEVEL.ALSO #35641690Y | Dec 1, 2022 IN VIOLATION | $2,500 |
| Nov 4, 2021 | Construction CLASS - 1 BC3301.2 SAFETY MEASURES NOT IN PLACE. AT TIME OF INSPECTION OF 6 STORY PROPOSED NEW BUILDING ACTIVE JOBSITE OBSEREVED NO PROTECTION IN PLACE AND NO CAZ FOR ADJOINING PROPERTY AT EXP #2 REAR TERRACE WITH TABLE #35632875X | Nov 15, 2022 IN VIOLATION | $625 |
| Issued | Violation | Status |
|---|---|---|
| Oct 9, 2026 | CONSTRUCTION WWP: AT THE TIME OF INSPECTION, OBSERVED AT UNIT 6A AND 6B MEZZANINE. AREAS IDENTIFIED ON NB PLANS AS 'OPEN TO BELOW" HAVE BEEN INFILLED IN BOTH UNIT CREATING ADDITIONAL SQUARE FOOTAGE FOR ADDITIONAL BEDROOMS AND LIVING AREAS TO EACH UNIT. DOB RECORDS INDICATE NO PERMIT ON FILE FOR STRUCTURAL FRAMIN #26-02376 | DOB VIOLATION - ACTIVE |
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 9, 2026 | DOB | CONSTRUCTION: WWP: AT THE TIME OF INSPECTION, OBSERVED AT UNIT 6A AND 6B MEZZANINE. AREAS IDENTIFIED ON NB PLANS AS 'OPEN TO BELOW" HAVE BEEN INFILLED IN BOTH UNIT CREATING ADDITIONAL SQUARE FOOTAGE FOR ADDITIONAL BEDROOMS AND LIVING AREAS TO EACH UNIT. DOB RECORDS INDICATE NO PERMIT ON FILE FOR STRUCTURAL FRAMIN | Open |
| Oct 8, 2026 | ECB | Construction: WORK WITHOUT A PERMIT: AT THE TIME OF INSPECTION, OBSERVED AT UNIT 6A AND 6B MEZZANINE. AREAS IDENTIFIED ON NB PLANS AS 'OPEN TO BELOW" HAVE BEEN INFILLED IN BOTH UNIT CREATING ADDITIONAL SQUARE FOOTAGE FOR ADD | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 3:54 PM ET. BBL 3027620005.