5 floors · 46 apartments · 40,845 sq ft · built 1920 · class D7 · owner of record: Diego Beekman Mutual Housing Assoc Housi Ng Development Fund Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 45 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 45 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 61 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 40,845 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 166 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 166 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 289 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 776 days | Next cycle year 2028 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-29 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 13, 2026 | Construction CLASS - 1 FACADE IN DISREPAIR, WITH BULGING BRICK, STRESS CRACKS AND MISSING MORTAR ALL THROUGHOUT., REPAIR AND/REPLACE #39177247Z | May 18, 2027 DEFAULT | $25,000 |
| Aug 11, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING WALLS AND APPURTENANCE. NOTED: FACADE IN A STATE OF DISREPAIR AT EXPOSURE # 1WITH VERTICAL AND HORIZONTAL CRACKS AT VARIOUS LOCATIONS. NEAR 5TH FLOOR WINDOWS AND PARAPET LE #39156727P | May 12, 2026 IN VIOLATION | $7,500 |
| Mar 4, 2025 | Construction CLASS - 1 FACADE IN STATE OF DISREPAIR AT EXPOSURE#1 WITH VERTICAL, HORIZONTAL AND STEP CRACKS AT VARIOUS LOCATIONS. MOSTLY NEAR 5 FLOOR WINDOWS AND PARAPET LEVEL., MAINTAIN EXTERIOR BUILDING WALL; REPAIR EXTERIOR WALLS #39140239J | May 16, 2025 IN VIOLATION | $7,445 |
| Apr 11, 2023 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING CODE COMPLIANT. NOTED: THE FRONT FACADE IS IN DISREPAIR WITH NUMEROUS CRACKS IN THE BRICK MASONRY. THERE IS VARIOUS STEP CRACKING WITH A CRACK SHOWING SEPARATION ON THE LEFT SIDE OF #39083542Y | Oct 20, 2023 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Aug 23, 2025 | CONSTRUCTION NOTED SEVERAL AREAS WHERE BRICK IS BULGING AND HAS VERTICAL OR HORIZONTAL CRACKS. #25-02012 | DOB VIOLATION - ACTIVE |
| Mar 4, 2025 | CONSTRUCTION OWNER TO HIRE NYSPE TO SUBMIT REPORT TO ERTINSPECTIONS@BUILDING.NYC.GOV WITH IN 5 DAYS, ADDRESSING ALL CONDITIONS W/PLANS, PHOTOS, RECOMMENDING TIME FRAME AND REPAIRS TO BE COMPLETED. #25-00369 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #28719 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #43035 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #08130 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #08131 | DOB VIOLATION - ACTIVE |
| May 30, 2014 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST #04555 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jul 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| May 30, 2014 | Elevators ACC1 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 26, 2025 | I | § 27-2091(C) ADM CODE THE PROPERTY HAS BEEN ISSUED AN ORDER TO IDENTIFY AND ADDRESS UNDERLYING CONDITIONS AND VIOLATIONS RELATED TO THE ORDER. FAILURE TO COMPLY MAY RESULT IN EXTENSIVE REPAIR WORK TO CORRECT UNDERLYING CONDITIONS AND RELATED VIOLATIONS BY HPD. CHARGES FOR REPAIR WORK DONE PURSUANT T | — |
| Jul 17, 2026 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK AND MORTAR JOINTS EXTERIOR WALL BUILDING FRONT , 4th STORY, SECTION ''EAST'' | Jul 23, 2026 |
| Jul 17, 2026 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK AND MORTAR JOINTS EXTERIOR WALL BUILDING FRONT , 4th STORY, SECTION ''WEST'' | Jul 23, 2026 |
| Jul 17, 2026 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK AND MORTAR JOINTS EXTERIOR WALL BUILDING FRONT , 3rd STORY, SECTION ''EAST'' | Jul 23, 2026 |
| Jul 17, 2026 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK AND MORTAR JOINTS AT EXTERIOR WALL BUILDING FRONT , 5th STORY, SECTION ''EAST '' | Jul 23, 2026 |
| Jul 17, 2026 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK AND MORTAR JOINTS EXTERIOR WALL BUILDING FRONT , 5th STORY, SECTION ''WEST'' | Jul 23, 2026 |
| Jun 10, 2026 | B | Apt 4D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 4D, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH | Jul 15, 2026 |
| Oct 7, 2025 | B | § 27-2005 ADM CODE FIRE ESCAPE DEFECTIVE. REPLACE WITH NEW THE BROKEN, DEFECTIVE AND/OR MISSING WARPED DROP LADDER AT 2nd FIRE ESCAPE FROM EAST AT SOUTH | Nov 11, 2025 |
| Oct 7, 2025 | B | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIR CONDITONER PROTRUDING FROM THE WINDOW SILL MORE THAN 6 INCHES AT BALCONY AT 3rd FIRE ESCAPE FROM EAST, 3rd STORY | Nov 11, 2025 |
| Oct 7, 2025 | B | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIR CONDITONER PROTRUDING FROM THE WINDOW SILL MORE THAN 6 INCHES AT BALCONY AT 3rd FIRE ESCAPE FROM EAST, 4th STORY | Nov 11, 2025 |
| Oct 7, 2025 | A | § 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER USE APPROPIATE NUTS AND BOLTS TO SECURE AT 1st FIRE ESCAPE FROM EAST AT SOUTH | Jan 10, 2026 |
| Sep 4, 2025 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK AND MORTAR AT PARAPET WALL AT BUILDING FRONT, EAST WING | Sep 10, 2025 |
| Sep 4, 2025 | C | § 27-2005 ADM CODE MAKE SAFE BY PROPERLY REPAIRING THE STRUCTURAL DEFECT LOOSE BRICKS FROM PARAPET WALL TO 4TH STORY AT BUILDING FRONT, WEST WING | Sep 10, 2025 |
| Sep 4, 2025 | C | § 27-2005 ADM CODE MAKE SAFE BY PROPERLY REPAIRING THE STRUCTURAL DEFECT LOOSE BRICKS AND CRACKS FROM PARAPET WALL TO 3RD STORY AT BUILDING FRONT, EAST WING | Sep 10, 2025 |
| Sep 4, 2025 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK AND MORTAR AT PARAPET WALL AT BUILDING FRONT, WEST WING | Sep 10, 2025 |
| Sep 2, 2025 | B | Apt 5E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT SOUTH WALL IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 5E, 4th STORY, 4th APARTMENT FROM WEST AT NORTH | Oct 7, 2025 |
| Sep 2, 2025 | B | Apt 3B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 3B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 7, 2025 |
| Aug 11, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VERTICAL CRACK IN MORTAR JOINTS AND BRICKS FROM 5TH STORY DOWN TO 1ST STORY AT BUILDING FRONT AT WEST SECTION | Sep 15, 2025 |
| Jul 31, 2025 | C | Apt 4A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH | Aug 26, 2025 |
| Jul 2, 2025 | C | § 27-2005 ADM CODE MAKE SAFE BY PROPERLY REPAIRING THE STRUCTURAL DEFECT LOOSE BRICKS FROM PARAPET WALL TO 4TH STORY AT BUILDING FRONT, WEST WING | Jul 8, 2025 |
| Jul 2, 2025 | C | § 27-2005 ADM CODE MAKE SAFE BY PROPERLY REPAIRING THE STRUCTURAL DEFECT LOOSE BRICKS AND CRACKS FROM PARAPET WALL TO 3RD STORY AT BUILDING FRONT, EAST WING | Jul 8, 2025 |
| Mar 21, 2025 | C | Apt 3A · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE PRESUMED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH | Apr 14, 2025 |
| Mar 7, 2025 | B | Apt 5I · § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 5I, 4th STORY, 5th APARTMENT FROM EAST AT SOUTH | Apr 11, 2025 |
| Mar 4, 2025 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK AND MORTAR AT PARAPET WALL AT BUILDING FRONT, WEST WING | Mar 10, 2025 |
| Mar 4, 2025 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK AND MORTAR AT 2ND WINDOW FROM WEST, 4TH STORY AT BUILDING FRONT, WEST WING | Mar 10, 2025 |
| Mar 4, 2025 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK AND MORTAR AT 9TH WINDOW FROM WEST, 5TH STORY AT BUILDING FRONT, WEST WING | Mar 10, 2025 |
| Mar 4, 2025 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK AND MORTAR AT 8TH WINDOW FROM WEST AT 5TH STORY BUILDING FRONT, EAST WING | Mar 10, 2025 |
| Mar 4, 2025 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK AND MORTAR AT PARAPET WALL AT BUILDING FRONT, EAST WING | Mar 10, 2025 |
| Mar 4, 2025 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK AND MORTAR AT FIRST WINDOW FROM WEST FROM 5TH STORY TO 3RD STORY AT BUILDING FRONT, EAST WING | Mar 10, 2025 |
| Date | Source | What | Now |
|---|---|---|---|
| Jul 30, 2026 | DOB Safety | AEUHAZ: | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 16, 2026, 6:41 AM ET. BBL 2025550003.